Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, July 6, 2026

Construction log

Monday, July 6, 2026

74 snapshots from the live camera.


AI digest

The site was largely quiet, with the excavator making only small position and boom adjustments on the cleared, level ground. A white vehicle appeared on the right-side road and a light-colored truck entered from the left driveway; no substantial change to the ground or equipment layout is visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 14 similar no-change frames6:30 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. No construction activity — the site is quiet.
      9:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. The site shows no noticeable alterations in equipment placement or activity over the last quarter hour.
      6:45 PM PT

      The site shows no noticeable alterations in equipment placement or activity over the last quarter hour.

    14. Construction camera frame at 6:30 PM PT. The equipment on the pad remains in the same positions as fifteen minutes ago.
      6:30 PM PT

      The equipment on the pad remains in the same positions as fifteen minutes ago.

  3. Construction camera frame at 6:15 PM PT. The layout of equipment on the pad hasn't altered in the last fifteen minutes.
    6:15 PM PT

    The layout of equipment on the pad hasn't altered in the last fifteen minutes.

  4. 7 similar no-change frames4:30 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The site appears quiet, with no discernible shifts in the positions of the equipment or vehicles.
      6:00 PM PT

      The site appears quiet, with no discernible shifts in the positions of the equipment or vehicles.

    2. Construction camera frame at 5:45 PM PT. The scene remains largely unchanged, with the equipment maintaining its previous positioning on the pad.
      5:45 PM PT

      The scene remains largely unchanged, with the equipment maintaining its previous positioning on the pad.

    3. Construction camera frame at 5:30 PM PT. The view across the site is consistent, with no apparent movement of equipment or vehicles.
      5:30 PM PT

      The view across the site is consistent, with no apparent movement of equipment or vehicles.

    4. Construction camera frame at 5:15 PM PT. Everything across the lot is stationary, and no new activity is visible.
      5:15 PM PT

      Everything across the lot is stationary, and no new activity is visible.

    5. Construction camera frame at 5:00 PM PT. The site displays a stable picture, with no visible shifts in equipment placement or activity.
      5:00 PM PT

      The site displays a stable picture, with no visible shifts in equipment placement or activity.

    6. Construction camera frame at 4:45 PM PT. The equipment arrangement on the pad remains as it was, showing no alterations in position.
      4:45 PM PT

      The equipment arrangement on the pad remains as it was, showing no alterations in position.

    7. Construction camera frame at 4:30 PM PT. The site presents a consistent view, with all equipment remaining in the same locations as before.
      4:30 PM PT

      The site presents a consistent view, with all equipment remaining in the same locations as before.

  5. Construction camera frame at 4:15 PM PT. The scene is quiet, and the equipment appears to be holding its positions without any noticeable movement.
    4:15 PM PT

    The scene is quiet, and the equipment appears to be holding its positions without any noticeable movement.

  6. 5 similar no-change frames3:00 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The site remains largely unchanged, with the equipment cluster holding its position.
      4:00 PM PT

      The site remains largely unchanged, with the equipment cluster holding its position.

    2. Construction camera frame at 3:45 PM PT. The site continues to show no discernible changes, with the equipment remaining in the same positions.
      3:45 PM PT

      The site continues to show no discernible changes, with the equipment remaining in the same positions.

    3. Construction camera frame at 3:30 PM PT. The layout of the site appears static, with the equipment maintaining its previous positioning.
      3:30 PM PT

      The layout of the site appears static, with the equipment maintaining its previous positioning.

    4. Construction camera frame at 3:15 PM PT. The scene is holding steady, with no visible shifts in equipment or activity since the last view.
      3:15 PM PT

      The scene is holding steady, with no visible shifts in equipment or activity since the last view.

    5. Construction camera frame at 3:00 PM PT. Everything remains in place across the lot, with no new movement detected.
      3:00 PM PT

      Everything remains in place across the lot, with no new movement detected.

  7. Construction camera frame at 2:45 PM PT. The site presents a similar view, with the machinery appearing unmoved from the last check.
    2:45 PM PT

    The site presents a similar view, with the machinery appearing unmoved from the last check.

  8. Construction camera frame at 2:30 PM PT. The equipment grouping on the site remains in the same arrangement as it was moments ago.
    2:30 PM PT

    The equipment grouping on the site remains in the same arrangement as it was moments ago.

  9. 4 similar no-change frames1:30 PM–2:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:15 PM PT. The site remains unchanged, with the machinery holding its positions on the flat expanse.
      2:15 PM PT

      The site remains unchanged, with the machinery holding its positions on the flat expanse.

    2. Construction camera frame at 2:00 PM PT. The site shows little discernible difference from the previous view, with the equipment cluster remaining stationary.
      2:00 PM PT

      The site shows little discernible difference from the previous view, with the equipment cluster remaining stationary.

    3. Construction camera frame at 1:45 PM PT. The site's appearance is consistent, with the machinery remaining in the same locations as before.
      1:45 PM PT

      The site's appearance is consistent, with the machinery remaining in the same locations as before.

    4. Construction camera frame at 1:30 PM PT. The scene appears largely static, with the equipment maintaining its positions across the site.
      1:30 PM PT

      The scene appears largely static, with the equipment maintaining its positions across the site.

  10. Construction camera frame at 1:15 PM PT. The scene remains remarkably still, with the equipment maintaining its prior positions on the cleared site.
    1:15 PM PT

    The scene remains remarkably still, with the equipment maintaining its prior positions on the cleared site.

  11. 2 similar no-change frames12:45 PM–1:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:00 PM PT. The site continues to show no noticeable shifts in equipment placement or activity.
      1:00 PM PT

      The site continues to show no noticeable shifts in equipment placement or activity.

    2. Construction camera frame at 12:45 PM PT. The site presents a consistent view, with no apparent movement of equipment or vehicles over the last quarter hour.
      12:45 PM PT

      The site presents a consistent view, with no apparent movement of equipment or vehicles over the last quarter hour.

  12. Construction camera frame at 12:30 PM PT. The scene is holding steady, with the equipment cluster appearing in the same spot as previously observed.
    12:30 PM PT

    The scene is holding steady, with the equipment cluster appearing in the same spot as previously observed.

  13. 3 similar no-change frames11:45 AM–12:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:15 PM PT. The layout of the site remains unchanged, showing the same arrangement of equipment on the level ground.
      12:15 PM PT

      The layout of the site remains unchanged, showing the same arrangement of equipment on the level ground.

    2. Construction camera frame at 12:00 PM PT. No alterations are apparent, as the machinery remains in the same arrangement as it was moments ago.
      12:00 PM PT

      No alterations are apparent, as the machinery remains in the same arrangement as it was moments ago.

    3. Construction camera frame at 11:45 AM PT. The site appears quiet, with no discernible changes to the position of equipment or vehicles.
      11:45 AM PT

      The site appears quiet, with no discernible changes to the position of equipment or vehicles.

  14. Construction camera frame at 11:30 AM PT. The scene remains much the same, with the equipment cluster maintaining its position on the flat site.
    11:30 AM PT

    The scene remains much the same, with the equipment cluster maintaining its position on the flat site.

  15. 4 similar no-change frames10:30 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The machinery grouping appears in the same location as before, with no noticeable shifts in position.
      11:15 AM PT

      The machinery grouping appears in the same location as before, with no noticeable shifts in position.

    2. Construction camera frame at 11:00 AM PT. The site presents a static view, with the machinery cluster holding its arrangement on the prepared ground.
      11:00 AM PT

      The site presents a static view, with the machinery cluster holding its arrangement on the prepared ground.

    3. Construction camera frame at 10:45 AM PT. The site remains stable, with no visible changes to equipment positions or activity levels.
      10:45 AM PT

      The site remains stable, with no visible changes to equipment positions or activity levels.

    4. Construction camera frame at 10:30 AM PT. The equipment on the site holds its positions, presenting a largely unaltered view from a few minutes ago.
      10:30 AM PT

      The equipment on the site holds its positions, presenting a largely unaltered view from a few minutes ago.

  16. Construction camera frame at 10:15 AM PT. The arrangement of machines on the site remains unchanged, with no apparent movement or new arrivals.
    10:15 AM PT

    The arrangement of machines on the site remains unchanged, with no apparent movement or new arrivals.

  17. Construction camera frame at 10:00 AM PT. The site shows no discernible differences, with the equipment remaining in the same positions as before.
    10:00 AM PT

    The site shows no discernible differences, with the equipment remaining in the same positions as before.

  18. Construction camera frame at 9:45 AM PT. The excavator has shifted position slightly, now angled a bit more to the right on the flat site.
    9:45 AM PT

    The excavator has shifted position slightly, now angled a bit more to the right on the flat site.

  19. Construction camera frame at 9:30 AM PT. The scene appears remarkably consistent, with the equipment cluster maintaining its arrangement on the flat site.
    9:30 AM PT

    The scene appears remarkably consistent, with the equipment cluster maintaining its arrangement on the flat site.

  20. Construction camera frame at 9:15 AM PT. A light-colored truck has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and the overall scene appear consistent.
    9:15 AM PT

    A light-colored truck has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment and the overall scene appear consistent.

  21. 2 similar no-change frames8:45 AM–9:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 AM PT. The site presents a static view, with no noticeable changes to the equipment or the prepared ground since the last check.
      9:00 AM PT

      The site presents a static view, with no noticeable changes to the equipment or the prepared ground since the last check.

    2. Construction camera frame at 8:45 AM PT. The equipment grouping on the site holds its position, with no visible alterations to the layout or machinery.
      8:45 AM PT

      The equipment grouping on the site holds its position, with no visible alterations to the layout or machinery.

  22. Construction camera frame at 8:30 AM PT. The scene remains largely as it was, with the equipment group maintaining its placement on the leveled site.
    8:30 AM PT

    The scene remains largely as it was, with the equipment group maintaining its placement on the leveled site.

  23. 2 similar no-change frames8:00 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The site is stable, showing no discernible changes to the equipment or the prepared surface in the latest view.
      8:15 AM PT

      The site is stable, showing no discernible changes to the equipment or the prepared surface in the latest view.

    2. Construction camera frame at 8:00 AM PT. The yellow excavator appears to have shifted slightly to the right on the prepared ground. Otherwise, the site remains unchanged, with no new vehicles or activity visible.
      8:00 AM PT

      The yellow excavator appears to have shifted slightly to the right on the prepared ground. Otherwise, the site remains unchanged, with no new vehicles or activity visible.

  24. Construction camera frame at 7:45 AM PT. The site's appearance is virtually identical to the previous view, with no visible adjustments to the machinery or the leveled ground.
    7:45 AM PT

    The site's appearance is virtually identical to the previous view, with no visible adjustments to the machinery or the leveled ground.

  25. 6 similar no-change frames6:15 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The arrangement of equipment on the site remains consistent, with no apparent movement or changes in position.
      7:30 AM PT

      The arrangement of equipment on the site remains consistent, with no apparent movement or changes in position.

    2. Construction camera frame at 7:15 AM PT. The site appears quiet, with no noticeable alterations to the equipment or the prepared surface between views.
      7:15 AM PT

      The site appears quiet, with no noticeable alterations to the equipment or the prepared surface between views.

    3. Construction camera frame at 7:00 AM PT. The equipment on the site appears unchanged, maintaining the same positions across the prepared ground.
      7:00 AM PT

      The equipment on the site appears unchanged, maintaining the same positions across the prepared ground.

    4. Construction camera frame at 6:45 AM PT. The site continues to present a static view, with the equipment remaining in the same positions on the flat pad.
      6:45 AM PT

      The site continues to present a static view, with the equipment remaining in the same positions on the flat pad.

    5. Construction camera frame at 6:30 AM PT. A small white vehicle has appeared on the service road along the right edge of the frame. The rest of the site, including the equipment on the pad, shows no visible change.
      6:30 AM PT

      A small white vehicle has appeared on the service road along the right edge of the frame. The rest of the site, including the equipment on the pad, shows no visible change.

    6. Construction camera frame at 6:15 AM PT. The scene remains remarkably still, with no discernible shifts in the equipment or surroundings.
      6:15 AM PT

      The scene remains remarkably still, with no discernible shifts in the equipment or surroundings.

  26. Construction camera frame at 6:00 AM PT. The scene is holding steady, with the equipment maintaining its arrangement on the prepared site.
    6:00 AM PT

    The scene is holding steady, with the equipment maintaining its arrangement on the prepared site.

  27. Construction camera frame at 5:45 AM PT. The equipment arrangement on the pad remains consistent between views, with the excavator still positioned near the center.
    5:45 AM PT

    The equipment arrangement on the pad remains consistent between views, with the excavator still positioned near the center.

  28. 2 similar no-change frames5:15 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The scene appears stable, with the equipment remaining in the same positions on the leveled site.
      5:30 AM PT

      The scene appears stable, with the equipment remaining in the same positions on the leveled site.

    2. Construction camera frame at 5:15 AM PT. The excavator’s boom has shifted position, now angled slightly higher above the flat site. Otherwise, the scene remains largely unchanged, with the illuminated pad and surrounding cityscape visible.
      5:15 AM PT

      The excavator’s boom has shifted position, now angled slightly higher above the flat site. Otherwise, the scene remains largely unchanged, with the illuminated pad and surrounding cityscape visible.

  29. Construction camera frame at 5:00 AM PT. The site is now illuminated, and an excavator has moved slightly towards the center of the pad. Visibility has improved dramatically since the last view, revealing the flat, cleared ground.
    5:00 AM PT

    The site is now illuminated, and an excavator has moved slightly towards the center of the pad. Visibility has improved dramatically since the last view, revealing the flat, cleared ground.

  30. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 5All daysJul 7 →