Live now
Downtown Bellevue construction, live.
Six excavators and a dozer are spread across a broad, graded early-works area under an issued clear-and-grade permit. Full shored excavation has not started. The camera runs around the clock as the site moves through excavation toward vertical construction.
Live counts
Site log
What the camera is seeing.
Every 15 minutes a frame is read by a vision model that compares it with the one before — narrating what's working, what's idle, and what has changed on the block.
What you're watching
The two low-rise buildings that stood here — a single-screen movie palace and a bowling alley later converted into a bookstore — were demolished in spring 2026. The camera now looks across the cleared, graded superblock. Read the history of the block →
Limited early grading continues while full excavation, perimeter shoring and below-grade construction remain dependent on separate city approvals. The early work now visible will become a four-acre dig, a three-story podium, and three ~600-ft towers rising into the Bellevue skyline. See the construction timeline →
Construction can also affect nearby streets and sidewalks. Check standard work hours, truck routes and access guidance →