Live now

Downtown Bellevue construction, live.

Six excavators and a dozer are spread across a broad, graded early-works area under an issued clear-and-grade permit. Full shored excavation has not started. The camera runs around the clock as the site moves through excavation toward vertical construction.


Watch the block, liveWatch on YouTube ↗

Live counts

Site log

What the camera is seeing.

Every 15 minutes a frame is read by a vision model that compares it with the one before — narrating what's working, what's idle, and what has changed on the block.

What you're watching

The two low-rise buildings that stood here — a single-screen movie palace and a bowling alley later converted into a bookstore — were demolished in spring 2026. The camera now looks across the cleared, graded superblock. Read the history of the block →

Limited early grading continues while full excavation, perimeter shoring and below-grade construction remain dependent on separate city approvals. The early work now visible will become a four-acre dig, a three-story podium, and three ~600-ft towers rising into the Bellevue skyline. See the construction timeline →

The feed is continuous and resets into a fresh archive several times a day, so the player above follows the current broadcast.

Construction can also affect nearby streets and sidewalks. Check standard work hours, truck routes and access guidance →