2 Line light rail
Sound Transit's 2 Line opened in two stages — an Eastside-only starter line in April 2024, then the cross-lake connection to Seattle on March 28, 2026, which crosses Lake Washington on the I-90 floating bridge (a world first for light rail). The Downtown Bellevue Station runs parallel to NE 6th St between 110th and 112th Ave NE, across from the Bellevue Transit Center — a few blocks east of the site.