Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, July 8, 2026

Construction log

Wednesday, July 8, 2026

74 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

A new large piece of equipment was moved into the cluster of machinery on the pad, and a small yellow vehicle also joined the cluster. A white van entered the site and parked near the fencing, and an excavator shifted its position slightly on the dirt pad.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:30 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    9:15 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. The scene continues to show a stable arrangement of machinery on the leveled ground.
    7:00 PM PT

    The scene continues to show a stable arrangement of machinery on the leveled ground.

  14. The site remains quiet, with no discernible changes to the equipment or layout over the past fifteen minutes.
    6:45 PM PT

    The site remains quiet, with no discernible changes to the equipment or layout over the past fifteen minutes.

  15. Everything remains in place across the flat pad, with no movement detected between frames.
    6:30 PM PT

    Everything remains in place across the flat pad, with no movement detected between frames.

  16. The site presents a familiar view, with the machinery remaining in the same locations as before.
    6:15 PM PT

    The site presents a familiar view, with the machinery remaining in the same locations as before.

  17. The equipment arrangement appears static, with no visible shifts in position over the last fifteen minutes.
    6:00 PM PT

    The equipment arrangement appears static, with no visible shifts in position over the last fifteen minutes.

  18. The scene is largely as it was, with the equipment cluster holding its positions across the site.
    5:45 PM PT

    The scene is largely as it was, with the equipment cluster holding its positions across the site.

  19. The site appears unchanged, with the equipment remaining in the same arrangement on the prepared ground.
    5:30 PM PT

    The site appears unchanged, with the equipment remaining in the same arrangement on the prepared ground.

  20. The view is holding steady, with the machinery maintaining its current positioning on the flat site.
    5:15 PM PT

    The view is holding steady, with the machinery maintaining its current positioning on the flat site.

  21. The site shows no discernible difference from the previous view, with the equipment remaining stationary.
    5:00 PM PT

    The site shows no discernible difference from the previous view, with the equipment remaining stationary.

  22. The scene remains consistent, with the equipment cluster holding its place on the cleared lot.
    4:45 PM PT

    The scene remains consistent, with the equipment cluster holding its place on the cleared lot.

  23. The site continues to appear stable, with no evident movement of equipment or vehicles.
    4:30 PM PT

    The site continues to appear stable, with no evident movement of equipment or vehicles.

  24. The site presents a similar view as before, with no noticeable alterations to the equipment or overall layout.
    4:15 PM PT

    The site presents a similar view as before, with no noticeable alterations to the equipment or overall layout.

  25. The construction site is displaying a static view, with all equipment remaining in the same positions.
    4:00 PM PT

    The construction site is displaying a static view, with all equipment remaining in the same positions.

  26. The scene appears largely unchanged, with the heavy equipment remaining in the same arrangement.
    3:45 PM PT

    The scene appears largely unchanged, with the heavy equipment remaining in the same arrangement.

  27. The site maintains its quiet appearance, with no obvious shifts in equipment positioning.
    3:30 PM PT

    The site maintains its quiet appearance, with no obvious shifts in equipment positioning.

  28. The site shows no discernible changes, with the equipment remaining in the same positions as before.
    3:15 PM PT

    The site shows no discernible changes, with the equipment remaining in the same positions as before.

  29. The equipment grouping hasn't shifted, and the overall scene remains remarkably consistent.
    3:00 PM PT

    The equipment grouping hasn't shifted, and the overall scene remains remarkably consistent.

  30. The scene is holding steady, with the equipment appearing in the same locations as previously observed.
    2:45 PM PT

    The scene is holding steady, with the equipment appearing in the same locations as previously observed.

  31. The site presents a similar picture, with no apparent repositioning of the machinery or vehicles.
    2:30 PM PT

    The site presents a similar picture, with no apparent repositioning of the machinery or vehicles.

  32. The site continues in a restful state, with no discernible movement of equipment or personnel.
    2:15 PM PT

    The site continues in a restful state, with no discernible movement of equipment or personnel.

  33. The site appears stable, with the equipment cluster remaining in the same arrangement as before.
    2:00 PM PT

    The site appears stable, with the equipment cluster remaining in the same arrangement as before.

  34. The site remains quiet, with the heavy equipment holding its positions on the prepared ground.
    1:45 PM PT

    The site remains quiet, with the heavy equipment holding its positions on the prepared ground.

  35. The equipment remains in the same positions, and the site appears largely unchanged.
    1:30 PM PT

    The equipment remains in the same positions, and the site appears largely unchanged.

  36. The site maintains its quiet state, with the machinery appearing unmoved from the last check.
    1:15 PM PT

    The site maintains its quiet state, with the machinery appearing unmoved from the last check.

  37. The scene is holding steady, with no visible shifts in equipment or activity across the site.
    1:00 PM PT

    The scene is holding steady, with no visible shifts in equipment or activity across the site.

  38. The scene presents a familiar view, with the machinery maintaining its placement across the site.
    12:45 PM PT

    The scene presents a familiar view, with the machinery maintaining its placement across the site.

  39. The equipment arrangement appears unchanged, maintaining a consistent presence on the leveled ground.
    12:30 PM PT

    The equipment arrangement appears unchanged, maintaining a consistent presence on the leveled ground.

  40. The site shows no immediately apparent alterations, as the equipment remains stationary on the level ground.
    12:15 PM PT

    The site shows no immediately apparent alterations, as the equipment remains stationary on the level ground.

  41. The site's appearance is nearly identical to the previous view, with the equipment remaining in place.
    12:00 PM PT

    The site's appearance is nearly identical to the previous view, with the equipment remaining in place.

  42. The view remains largely static, with the heavy equipment holding its positions on the flat site.
    11:45 AM PT

    The view remains largely static, with the heavy equipment holding its positions on the flat site.

  43. The excavator has shifted its position slightly on the dirt pad, rotating to face a different direction.
    11:30 AM PT

    The excavator has shifted its position slightly on the dirt pad, rotating to face a different direction.

  44. The site continues to show a stable picture, with the equipment remaining unmoved on the prepared ground.
    11:15 AM PT

    The site continues to show a stable picture, with the equipment remaining unmoved on the prepared ground.

  45. The scene looks remarkably consistent, with no discernible shifts in equipment or vehicle positions.
    11:00 AM PT

    The scene looks remarkably consistent, with no discernible shifts in equipment or vehicle positions.

  46. The construction site presents a largely unchanged view, with the equipment remaining in the same positions.
    10:45 AM PT

    The construction site presents a largely unchanged view, with the equipment remaining in the same positions.

  47. Everything appears as it was, with the machinery holding its positions on the leveled site.
    10:30 AM PT

    Everything appears as it was, with the machinery holding its positions on the leveled site.

  48. The arrangement of equipment on the pad looks identical to the previous view, showing no movement or alterations.
    10:15 AM PT

    The arrangement of equipment on the pad looks identical to the previous view, showing no movement or alterations.

  49. The site remains quiet, with the machinery maintaining its previous arrangement on the leveled ground.
    10:00 AM PT

    The site remains quiet, with the machinery maintaining its previous arrangement on the leveled ground.

  50. A white van has entered the site from the driveway on the left and is now parked near the fencing.
    9:45 AM PT

    A white van has entered the site from the driveway on the left and is now parked near the fencing.

  51. The equipment grouping on the pad appears static, with no noticeable alterations in placement since the last view.
    9:30 AM PT

    The equipment grouping on the pad appears static, with no noticeable alterations in placement since the last view.

  52. The scene is remarkably still, with no discernible adjustments to the machinery or the site’s flat expanse.
    9:15 AM PT

    The scene is remarkably still, with no discernible adjustments to the machinery or the site’s flat expanse.

  53. The site’s layout is unchanged, and the equipment remains in the same positions as fifteen minutes ago.
    9:00 AM PT

    The site’s layout is unchanged, and the equipment remains in the same positions as fifteen minutes ago.

  54. The site’s appearance has held steady, showing no shifts in the position of the equipment or the surface of the pad.
    8:45 AM PT

    The site’s appearance has held steady, showing no shifts in the position of the equipment or the surface of the pad.

  55. The arrangement of equipment on the pad is consistent, showing no alterations in position over the last quarter hour.
    8:30 AM PT

    The arrangement of equipment on the pad is consistent, showing no alterations in position over the last quarter hour.

  56. The site remains largely as it was, with no noticeable changes to the equipment or the prepared ground.
    8:15 AM PT

    The site remains largely as it was, with no noticeable changes to the equipment or the prepared ground.

  57. The site presents a consistent view, with no visible shifts in the equipment’s placement or the overall landscape.
    8:00 AM PT

    The site presents a consistent view, with no visible shifts in the equipment’s placement or the overall landscape.

  58. The equipment grouping on the site shows no movement or alterations in its arrangement during the last fifteen minutes.
    7:45 AM PT

    The equipment grouping on the site shows no movement or alterations in its arrangement during the last fifteen minutes.

  59. The scene appears remarkably static, with no discernible changes to the equipment or the prepared site surface.
    7:30 AM PT

    The scene appears remarkably static, with no discernible changes to the equipment or the prepared site surface.

  60. The cluster of equipment on the pad appears unchanged, maintaining its previous positioning.
    7:15 AM PT

    The cluster of equipment on the pad appears unchanged, maintaining its previous positioning.

  61. A small yellow vehicle has moved into the cluster of equipment on the pad, now positioned near the center. Otherwise, the site's layout and machinery remain as before.
    7:00 AM PT

    A small yellow vehicle has moved into the cluster of equipment on the pad, now positioned near the center. Otherwise, the site's layout and machinery remain as before.

  62. The arrangement of equipment on the site has not altered in the last quarter-hour.
    6:45 AM PT

    The arrangement of equipment on the site has not altered in the last quarter-hour.

  63. A large piece of equipment is now positioned between the excavator and the dozer, appearing to be moved into place. The site otherwise maintains the same arrangement of machinery and prepared ground.
    6:30 AM PT

    A large piece of equipment is now positioned between the excavator and the dozer, appearing to be moved into place. The site otherwise maintains the same arrangement of machinery and prepared ground.

  64. The site remains still, with the same grouping of machinery visible on the prepared ground.
    6:15 AM PT

    The site remains still, with the same grouping of machinery visible on the prepared ground.

  65. The equipment arrangement on the pad remains consistent, with no visible shifts in position.
    6:00 AM PT

    The equipment arrangement on the pad remains consistent, with no visible shifts in position.

  66. The site appears quiet, with no discernible changes to the equipment or layout over the last fifteen minutes.
    5:45 AM PT

    The site appears quiet, with no discernible changes to the equipment or layout over the last fifteen minutes.

  67. The scene remains largely unchanged, with the same equipment visible on the flat site.
    5:30 AM PT

    The scene remains largely unchanged, with the same equipment visible on the flat site.

  68. Everything is still on the site, with no new activity visible in the dark.
    5:15 AM PT

    Everything is still on the site, with no new activity visible in the dark.

  69. The site is now illuminated, revealing the equipment cluster and a clearer view of the graded pad. Visibility remains low, but the area appears quiet with no apparent movement.
    5:00 AM PT

    The site is now illuminated, revealing the equipment cluster and a clearer view of the graded pad. Visibility remains low, but the area appears quiet with no apparent movement.

  70. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  71. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jul 7All daysJul 9 →