Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, July 20, 2026

Construction log

Monday, July 20, 2026

73 snapshots from the live camera.


AI digest

The site remained largely quiet, with heavy equipment mostly holding position; a dump truck entered and later another exited, while several excavators made small shifts or turns. The ground and overall site layout show no substantial change over the day.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:45 PM PT. Activity on the site appears minimal, with the positions of the machines and material stockpiles staying consistent.
    8:45 PM PT

    Activity on the site appears minimal, with the positions of the machines and material stockpiles staying consistent.

  4. 2 similar no-change frames8:15 PM–8:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 PM PT. The scene looks largely unchanged, with the earthmoving equipment holding its positions across the site.
      8:30 PM PT

      The scene looks largely unchanged, with the earthmoving equipment holding its positions across the site.

    2. Construction camera frame at 8:15 PM PT. The site presents a remarkably similar view, with no noticeable changes to the position of the equipment or stockpiles.
      8:15 PM PT

      The site presents a remarkably similar view, with no noticeable changes to the position of the equipment or stockpiles.

  5. Construction camera frame at 8:00 PM PT. The arrangement of equipment and materials across the site is largely consistent between these views.
    8:00 PM PT

    The arrangement of equipment and materials across the site is largely consistent between these views.

  6. Construction camera frame at 7:45 PM PT. The site remains much as it was, with the machinery appearing unmoved during this interval.
    7:45 PM PT

    The site remains much as it was, with the machinery appearing unmoved during this interval.

  7. Construction camera frame at 7:30 PM PT. The scene is holding its composition, with no visible movement of equipment or materials.
    7:30 PM PT

    The scene is holding its composition, with no visible movement of equipment or materials.

  8. Construction camera frame at 7:15 PM PT. The site maintains its current configuration, with no apparent repositioning of machinery or materials.
    7:15 PM PT

    The site maintains its current configuration, with no apparent repositioning of machinery or materials.

  9. 5 similar no-change frames6:00 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. The site appears static, with all the heavy machinery and stockpiles remaining in the same positions as before.
      7:00 PM PT

      The site appears static, with all the heavy machinery and stockpiles remaining in the same positions as before.

    2. Construction camera frame at 6:45 PM PT. Equipment locations are consistent between the two views, showing no significant shifts in the site’s arrangement.
      6:45 PM PT

      Equipment locations are consistent between the two views, showing no significant shifts in the site’s arrangement.

    3. Construction camera frame at 6:30 PM PT. The site presents a largely unchanged view, with equipment remaining in the same locations.
      6:30 PM PT

      The site presents a largely unchanged view, with equipment remaining in the same locations.

    4. Construction camera frame at 6:15 PM PT. The layout of the site is holding steady, with no noticeable alterations in equipment placement.
      6:15 PM PT

      The layout of the site is holding steady, with no noticeable alterations in equipment placement.

    5. Construction camera frame at 6:00 PM PT. No movement is visible across the site, with all machinery and materials remaining in place.
      6:00 PM PT

      No movement is visible across the site, with all machinery and materials remaining in place.

  10. Construction camera frame at 5:45 PM PT. The scene remains stable, with the heavy equipment holding its positions on the block.
    5:45 PM PT

    The scene remains stable, with the heavy equipment holding its positions on the block.

  11. Construction camera frame at 5:30 PM PT. The machines on site haven’t shifted their positions in the last quarter of an hour.
    5:30 PM PT

    The machines on site haven’t shifted their positions in the last quarter of an hour.

  12. Construction camera frame at 5:15 PM PT. The site’s configuration appears remarkably similar, with the machines holding their places across the cleared area.
    5:15 PM PT

    The site’s configuration appears remarkably similar, with the machines holding their places across the cleared area.

  13. Construction camera frame at 5:00 PM PT. The site’s overall appearance is consistent, with the machines maintaining their positions across the block.
    5:00 PM PT

    The site’s overall appearance is consistent, with the machines maintaining their positions across the block.

  14. Construction camera frame at 4:45 PM PT. The scene is largely unchanged, with equipment appearing to remain in the same locations.
    4:45 PM PT

    The scene is largely unchanged, with equipment appearing to remain in the same locations.

  15. Construction camera frame at 4:30 PM PT. The arrangement of equipment on site holds steady, with no noticeable repositioning of machines or materials.
    4:30 PM PT

    The arrangement of equipment on site holds steady, with no noticeable repositioning of machines or materials.

  16. Construction camera frame at 4:15 PM PT. The site presents a very similar picture, with the machinery remaining in roughly the same positions.
    4:15 PM PT

    The site presents a very similar picture, with the machinery remaining in roughly the same positions.

  17. Construction camera frame at 4:00 PM PT. The layout of equipment across the site is nearly identical to the previous view.
    4:00 PM PT

    The layout of equipment across the site is nearly identical to the previous view.

  18. Construction camera frame at 3:45 PM PT. The scene remains quite stable, with no significant shifts in equipment placement or activity.
    3:45 PM PT

    The scene remains quite stable, with no significant shifts in equipment placement or activity.

  19. Construction camera frame at 3:30 PM PT. The site appears remarkably consistent, with the heavy equipment holding its positions.
    3:30 PM PT

    The site appears remarkably consistent, with the heavy equipment holding its positions.

  20. 3 similar no-change frames2:45 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. The positions of the machines and materials seem mostly unchanged from the earlier view.
      3:15 PM PT

      The positions of the machines and materials seem mostly unchanged from the earlier view.

    2. Construction camera frame at 3:00 PM PT. Equipment locations are largely static, with only minimal adjustments apparent across the site.
      3:00 PM PT

      Equipment locations are largely static, with only minimal adjustments apparent across the site.

    3. Construction camera frame at 2:45 PM PT. The site shows a generally unchanged appearance, with equipment remaining in similar locations to the previous view.
      2:45 PM PT

      The site shows a generally unchanged appearance, with equipment remaining in similar locations to the previous view.

  21. Construction camera frame at 2:30 PM PT. Notably, a dark-colored truck is now traveling along the service road on the right side of the frame.
    2:30 PM PT

    Notably, a dark-colored truck is now traveling along the service road on the right side of the frame.

  22. Construction camera frame at 2:15 PM PT. One of the excavators near the center has shifted its position slightly, rotating to face a different direction.
    2:15 PM PT

    One of the excavators near the center has shifted its position slightly, rotating to face a different direction.

  23. Construction camera frame at 2:00 PM PT. The scene presents a similar picture, with no substantial alterations to the equipment positions or site layout.
    2:00 PM PT

    The scene presents a similar picture, with no substantial alterations to the equipment positions or site layout.

  24. Construction camera frame at 1:45 PM PT. The arrangement of equipment appears consistent between views, though the shadows have lengthened a bit.
    1:45 PM PT

    The arrangement of equipment appears consistent between views, though the shadows have lengthened a bit.

  25. Construction camera frame at 1:30 PM PT. A white vehicle has appeared near the center of the site, positioned between the two excavators previously visible there.
    1:30 PM PT

    A white vehicle has appeared near the center of the site, positioned between the two excavators previously visible there.

  26. Construction camera frame at 1:15 PM PT. The site remains quiet, with no obvious repositioning of machinery or vehicles during this interval.
    1:15 PM PT

    The site remains quiet, with no obvious repositioning of machinery or vehicles during this interval.

  27. Construction camera frame at 1:00 PM PT. The equipment arrangement on site is remarkably similar to the previous view, with only minor adjustments apparent.
    1:00 PM PT

    The equipment arrangement on site is remarkably similar to the previous view, with only minor adjustments apparent.

  28. Construction camera frame at 12:45 PM PT. A light-colored truck has entered the site from the driveway on the left, where it was not visible previously.
    12:45 PM PT

    A light-colored truck has entered the site from the driveway on the left, where it was not visible previously.

  29. 2 similar no-change frames12:15 PM–12:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:30 PM PT. The scene appears largely unchanged, though the shadows have shifted slightly with the sun’s movement.
      12:30 PM PT

      The scene appears largely unchanged, though the shadows have shifted slightly with the sun’s movement.

    2. Construction camera frame at 12:15 PM PT. The positioning of the equipment and materials remains fairly static, though one of the excavators near the center appears to have made a small adjustment to its angle.
      12:15 PM PT

      The positioning of the equipment and materials remains fairly static, though one of the excavators near the center appears to have made a small adjustment to its angle.

  30. Construction camera frame at 12:00 PM PT. TwoSlight movement is visible among the machinery, as two excavators in the lower half of the site have shifted their positions.
    12:00 PM PT

    TwoSlight movement is visible among the machinery, as two excavators in the lower half of the site have shifted their positions.

  31. Construction camera frame at 11:45 AM PT. The arrangement of the heavy equipment and soil piles appears consistent between these views, with no significant shifts in position.
    11:45 AM PT

    The arrangement of the heavy equipment and soil piles appears consistent between these views, with no significant shifts in position.

  32. Construction camera frame at 11:30 AM PT. A dump truck is exiting the site via the driveway on the left, having not been present in the earlier view.
    11:30 AM PT

    A dump truck is exiting the site via the driveway on the left, having not been present in the earlier view.

  33. Construction camera frame at 11:15 AM PT. The scene is remarkably stable, with the positioning of equipment and material appearing almost identical to the previous view.
    11:15 AM PT

    The scene is remarkably stable, with the positioning of equipment and material appearing almost identical to the previous view.

  34. Construction camera frame at 11:00 AM PT. Activity on site is minimal, though one of the excavators near the center has subtly altered its orientation.
    11:00 AM PT

    Activity on site is minimal, though one of the excavators near the center has subtly altered its orientation.

  35. Construction camera frame at 10:45 AM PT. The site remains largely unchanged, though a small orange vehicle has appeared near the driveway on the left.
    10:45 AM PT

    The site remains largely unchanged, though a small orange vehicle has appeared near the driveway on the left.

  36. Construction camera frame at 10:30 AM PT. The scene shows minimal movement, though a small loader has moved slightly closer to the center of the site.
    10:30 AM PT

    The scene shows minimal movement, though a small loader has moved slightly closer to the center of the site.

  37. Construction camera frame at 10:15 AM PT. The site appears quiet, with the positions of the machines and material stockpiles holding steady since the last view.
    10:15 AM PT

    The site appears quiet, with the positions of the machines and material stockpiles holding steady since the last view.

  38. Construction camera frame at 10:00 AM PT. The site presents a steady scene, with the positions of the large machines remaining largely consistent over the last quarter hour.
    10:00 AM PT

    The site presents a steady scene, with the positions of the large machines remaining largely consistent over the last quarter hour.

  39. Construction camera frame at 9:45 AM PT. The arrangement of equipment across the site appears very similar to the last check, though one of the excavators closer to the right edge has rotated.
    9:45 AM PT

    The arrangement of equipment across the site appears very similar to the last check, though one of the excavators closer to the right edge has rotated.

  40. Construction camera frame at 9:30 AM PT. A yellow dump truck has entered the site from the driveway on the left, and one of the excavators near the center has shifted its position slightly.
    9:30 AM PT

    A yellow dump truck has entered the site from the driveway on the left, and one of the excavators near the center has shifted its position slightly.

  41. 2 similar no-change frames9:00 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. The overall layout of the site remains stable, with no noticeable alterations to equipment placement or ongoing work.
      9:15 AM PT

      The overall layout of the site remains stable, with no noticeable alterations to equipment placement or ongoing work.

    2. Construction camera frame at 9:00 AM PT. The scene is largely unchanged, with the positions of the excavators and trucks appearing consistent.
      9:00 AM PT

      The scene is largely unchanged, with the positions of the excavators and trucks appearing consistent.

  42. Construction camera frame at 8:45 AM PT. The site remains quite still, with the arrangement of heavy equipment appearing nearly the same as it was moments ago.
    8:45 AM PT

    The site remains quite still, with the arrangement of heavy equipment appearing nearly the same as it was moments ago.

  43. Construction camera frame at 8:30 AM PT. Equipment positions are almost identical to the previous view, though a dark-colored vehicle has appeared near the driveway on the left.
    8:30 AM PT

    Equipment positions are almost identical to the previous view, though a dark-colored vehicle has appeared near the driveway on the left.

  44. Construction camera frame at 8:15 AM PT. The scene appears remarkably consistent, with equipment largely holding its previous positions.
    8:15 AM PT

    The scene appears remarkably consistent, with equipment largely holding its previous positions.

  45. Construction camera frame at 8:00 AM PT. The site presents a largely static picture, with no significant shifts in the placement of equipment or discernible activity over the last quarter hour.
    8:00 AM PT

    The site presents a largely static picture, with no significant shifts in the placement of equipment or discernible activity over the last quarter hour.

  46. Construction camera frame at 7:45 AM PT. The site shows minimal variation, with the machinery maintaining generally the same locations as before.
    7:45 AM PT

    The site shows minimal variation, with the machinery maintaining generally the same locations as before.

  47. Construction camera frame at 7:30 AM PT. The arrangement of machinery appears largely consistent, though one of the excavators near the center of the site has shifted its position slightly.
    7:30 AM PT

    The arrangement of machinery appears largely consistent, though one of the excavators near the center of the site has shifted its position slightly.

  48. 15 similar no-change frames12:00 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. A dump truck has entered the site from the driveway on the left and is moving toward the central area. Otherwise, the equipment and overall scene remain largely unchanged during this period.
      7:15 AM PT

      A dump truck has entered the site from the driveway on the left and is moving toward the central area. Otherwise, the equipment and overall scene remain largely unchanged during this period.

    2. Construction camera frame at 7:00 AM PT. The site appears quiet, with no visible movement of equipment or vehicles in the last fifteen minutes.
      7:00 AM PT

      The site appears quiet, with no visible movement of equipment or vehicles in the last fifteen minutes.

    3. Construction camera frame at 6:45 AM PT. The scene remains stable, showing no apparent alterations in the positions of equipment or vehicles on the site.
      6:45 AM PT

      The scene remains stable, showing no apparent alterations in the positions of equipment or vehicles on the site.

    4. Construction camera frame at 6:30 AM PT. The view remains remarkably similar, showing no discernible changes in equipment placement or activity across the site.
      6:30 AM PT

      The view remains remarkably similar, showing no discernible changes in equipment placement or activity across the site.

    5. Construction camera frame at 6:15 AM PT. The site presents a consistent view, with equipment remaining stationary across the block.
      6:15 AM PT

      The site presents a consistent view, with equipment remaining stationary across the block.

    6. Construction camera frame at 6:00 AM PT. The scene holds steady, with all machinery remaining in the same locations as before.
      6:00 AM PT

      The scene holds steady, with all machinery remaining in the same locations as before.

    7. Construction camera frame at 5:45 AM PT. The equipment arrangement appears stable, with no noticeable shifts in machine positions or vehicle traffic during this interval.
      5:45 AM PT

      The equipment arrangement appears stable, with no noticeable shifts in machine positions or vehicle traffic during this interval.

    8. Construction camera frame at 5:30 AM PT. The excavator near the center of the site has shifted its position slightly, now facing a different direction. Otherwise, the scene remains largely unchanged, with equipment at rest across the cleared block.
      5:30 AM PT

      The excavator near the center of the site has shifted its position slightly, now facing a different direction. Otherwise, the scene remains largely unchanged, with equipment at rest across the cleared block.

    9. Construction camera frame at 5:15 AM PT. The site is now more brightly lit, revealing several pieces of heavy equipment positioned across the cleared area. Activity remains quiet with no apparent movement of machines or vehicles between the two views.
      5:15 AM PT

      The site is now more brightly lit, revealing several pieces of heavy equipment positioned across the cleared area. Activity remains quiet with no apparent movement of machines or vehicles between the two views.

    10. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 19All daysJul 21 →