Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, July 22, 2026

Construction log

Wednesday, July 22, 2026

72 snapshots from the live camera.


AI digest

The site was largely quiet, with equipment mostly holding position, though trucks came and went and several excavators shifted or turned. By the last frame, the central graded area shows a more pronounced pattern of earth movement than in the first frame; no major change is apparent compared with the week-earlier view.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 5 similar no-change frames8:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:45 PM PT. The arrangement of equipment across the site appears static, showing no discernible changes in position over the last quarter hour.
      8:45 PM PT

      The arrangement of equipment across the site appears static, showing no discernible changes in position over the last quarter hour.

    4. Construction camera frame at 8:30 PM PT. The scene remains largely unchanged, with the equipment still positioned as it was previously.
      8:30 PM PT

      The scene remains largely unchanged, with the equipment still positioned as it was previously.

    5. Construction camera frame at 8:15 PM PT. Everything on site maintains its prior arrangement, with no visible shifts in equipment or stockpiled material.
      8:15 PM PT

      Everything on site maintains its prior arrangement, with no visible shifts in equipment or stockpiled material.

  3. Construction camera frame at 8:00 PM PT. The site presents a remarkably similar picture to the last check-in, with the machines all staying put.
    8:00 PM PT

    The site presents a remarkably similar picture to the last check-in, with the machines all staying put.

  4. Construction camera frame at 7:45 PM PT. The site’s layout appears stable, with the equipment holding its positions and no obvious alterations to the graded area.
    7:45 PM PT

    The site’s layout appears stable, with the equipment holding its positions and no obvious alterations to the graded area.

  5. 6 similar no-change frames6:15 PM–7:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 PM PT. The construction area shows no movement of equipment or materials in the last fifteen minutes.
      7:30 PM PT

      The construction area shows no movement of equipment or materials in the last fifteen minutes.

    2. Construction camera frame at 7:15 PM PT. The view of the site remains consistent, with no noticeable changes in the positions of the machines or material distribution.
      7:15 PM PT

      The view of the site remains consistent, with no noticeable changes in the positions of the machines or material distribution.

    3. Construction camera frame at 7:00 PM PT. The site appears static, with all visible equipment remaining in the same locations as before.
      7:00 PM PT

      The site appears static, with all visible equipment remaining in the same locations as before.

    4. Construction camera frame at 6:45 PM PT. The scene remains largely unchanged, with the machines holding their positions from fifteen minutes ago.
      6:45 PM PT

      The scene remains largely unchanged, with the machines holding their positions from fifteen minutes ago.

    5. Construction camera frame at 6:30 PM PT. No shifts in equipment or activity are visible across the site since the previous frame.
      6:30 PM PT

      No shifts in equipment or activity are visible across the site since the previous frame.

    6. Construction camera frame at 6:15 PM PT. The site presents a consistent picture, with no discernible shifts in equipment positions or material stockpiles.
      6:15 PM PT

      The site presents a consistent picture, with no discernible shifts in equipment positions or material stockpiles.

  6. Construction camera frame at 6:00 PM PT. The arrangement of equipment on the site hasn’t altered in the last quarter of an hour.
    6:00 PM PT

    The arrangement of equipment on the site hasn’t altered in the last quarter of an hour.

  7. Construction camera frame at 5:45 PM PT. Everything is currently stationary, with no movement detected across the site.
    5:45 PM PT

    Everything is currently stationary, with no movement detected across the site.

  8. Construction camera frame at 5:30 PM PT. The machinery on site maintains its arrangement, showing no apparent relocation in the intervening time.
    5:30 PM PT

    The machinery on site maintains its arrangement, showing no apparent relocation in the intervening time.

  9. Construction camera frame at 5:15 PM PT. The site appears quiet, with no noticeable movement of equipment or materials in the last fifteen minutes.
    5:15 PM PT

    The site appears quiet, with no noticeable movement of equipment or materials in the last fifteen minutes.

  10. Construction camera frame at 5:00 PM PT. The overall layout of the site remains consistent, with no visible repositioning of equipment or materials.
    5:00 PM PT

    The overall layout of the site remains consistent, with no visible repositioning of equipment or materials.

  11. Construction camera frame at 4:45 PM PT. The scene is remarkably still, with the machinery maintaining its placement from the previous view.
    4:45 PM PT

    The scene is remarkably still, with the machinery maintaining its placement from the previous view.

  12. Construction camera frame at 4:30 PM PT. The site holds steady, with no discernible shifts in the positions of the machines or materials.
    4:30 PM PT

    The site holds steady, with no discernible shifts in the positions of the machines or materials.

  13. Construction camera frame at 4:15 PM PT. The scene remains stable, with all visible equipment holding its position since the last check.
    4:15 PM PT

    The scene remains stable, with all visible equipment holding its position since the last check.

  14. Construction camera frame at 4:00 PM PT. A white pickup truck has entered the site via the driveway on the left side of the frame and is now positioned near the equipment in the lower left.
    4:00 PM PT

    A white pickup truck has entered the site via the driveway on the left side of the frame and is now positioned near the equipment in the lower left.

  15. Construction camera frame at 3:45 PM PT. The arrangement of equipment appears largely unchanged, though the excavator furthest to the right now faces a slightly different direction.
    3:45 PM PT

    The arrangement of equipment appears largely unchanged, though the excavator furthest to the right now faces a slightly different direction.

  16. Construction camera frame at 3:30 PM PT. The site presents a consistent picture, with machinery holding its ground and no readily apparent movement.
    3:30 PM PT

    The site presents a consistent picture, with machinery holding its ground and no readily apparent movement.

  17. 2 similar no-change frames3:00 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. Equipment remains in largely the same positions, though one of the excavators near the center of the site appears to have shifted its orientation slightly.
      3:15 PM PT

      Equipment remains in largely the same positions, though one of the excavators near the center of the site appears to have shifted its orientation slightly.

    2. Construction camera frame at 3:00 PM PT. The site appears quiet, with no noticeable changes in equipment positions or activity over the last fifteen minutes.
      3:00 PM PT

      The site appears quiet, with no noticeable changes in equipment positions or activity over the last fifteen minutes.

  18. Construction camera frame at 2:45 PM PT. The pattern of material across the work area seems subtly different, with a slight rearrangement visible in the center of the site.
    2:45 PM PT

    The pattern of material across the work area seems subtly different, with a slight rearrangement visible in the center of the site.

  19. Construction camera frame at 2:30 PM PT. The scene remains remarkably static, with the equipment maintaining its positions across the site.
    2:30 PM PT

    The scene remains remarkably static, with the equipment maintaining its positions across the site.

  20. Construction camera frame at 2:15 PM PT. A white truck is exiting the site via the driveway on the left, having moved from inside the work area.
    2:15 PM PT

    A white truck is exiting the site via the driveway on the left, having moved from inside the work area.

  21. Construction camera frame at 2:00 PM PT. The arrangement of equipment across the site remains stable, though some minor shifts in the patterns of moved material are visible.
    2:00 PM PT

    The arrangement of equipment across the site remains stable, though some minor shifts in the patterns of moved material are visible.

  22. Construction camera frame at 1:45 PM PT. The site presents a largely unchanged appearance, with equipment remaining in the same general locations as before.
    1:45 PM PT

    The site presents a largely unchanged appearance, with equipment remaining in the same general locations as before.

  23. Construction camera frame at 1:30 PM PT. The overall layout of the site and the positions of the machines appear largely consistent between the two views.
    1:30 PM PT

    The overall layout of the site and the positions of the machines appear largely consistent between the two views.

  24. Construction camera frame at 1:15 PM PT. The excavator in the lower-center has shifted its position and rotated its boom, while a white vehicle has moved further into the site from the left driveway.
    1:15 PM PT

    The excavator in the lower-center has shifted its position and rotated its boom, while a white vehicle has moved further into the site from the left driveway.

  25. Construction camera frame at 1:00 PM PT. The excavators near the center of the site appear to have moved a small amount of material, creating a slightly different pattern in the graded area.
    1:00 PM PT

    The excavators near the center of the site appear to have moved a small amount of material, creating a slightly different pattern in the graded area.

  26. Construction camera frame at 12:45 PM PT. An excavator near the northeast corner of the site has shifted its position slightly, and a small white vehicle has moved further into the work area from the left driveway.
    12:45 PM PT

    An excavator near the northeast corner of the site has shifted its position slightly, and a small white vehicle has moved further into the work area from the left driveway.

  27. Construction camera frame at 12:30 PM PT. Two dump trucks have departed the site, one exiting via the left driveway and another from the service road on the right.
    12:30 PM PT

    Two dump trucks have departed the site, one exiting via the left driveway and another from the service road on the right.

  28. Construction camera frame at 12:15 PM PT. The scene remains stable, with the machinery and material distribution appearing virtually unchanged from the previous view.
    12:15 PM PT

    The scene remains stable, with the machinery and material distribution appearing virtually unchanged from the previous view.

  29. Construction camera frame at 12:00 PM PT. A white pickup truck has entered the site from the driveway on the left, and the excavator near the center of the frame has subtly altered its positioning.
    12:00 PM PT

    A white pickup truck has entered the site from the driveway on the left, and the excavator near the center of the frame has subtly altered its positioning.

  30. Construction camera frame at 11:45 AM PT. The arrangement of the machines across the site is largely consistent, though one excavator near the lower-center has rotated its boom.
    11:45 AM PT

    The arrangement of the machines across the site is largely consistent, though one excavator near the lower-center has rotated its boom.

  31. Construction camera frame at 11:30 AM PT. The arrangement of equipment and materials across the site holds steady, with no obvious alterations in position or activity.
    11:30 AM PT

    The arrangement of equipment and materials across the site holds steady, with no obvious alterations in position or activity.

  32. Construction camera frame at 11:15 AM PT. The site’s activity remains quiet, with no discernible shifts in the locations of the heavy equipment or material stockpiles.
    11:15 AM PT

    The site’s activity remains quiet, with no discernible shifts in the locations of the heavy equipment or material stockpiles.

  33. Construction camera frame at 11:00 AM PT. The scene appears remarkably similar, though a small, light-colored vehicle has moved from the upper-right to the center of the site.
    11:00 AM PT

    The scene appears remarkably similar, though a small, light-colored vehicle has moved from the upper-right to the center of the site.

  34. Construction camera frame at 10:45 AM PT. Two white trucks have left the site via the driveway on the left, and one excavator in the center has shifted its position. All other machinery and material piles remain in place.
    10:45 AM PT

    Two white trucks have left the site via the driveway on the left, and one excavator in the center has shifted its position. All other machinery and material piles remain in place.

  35. 2 similar no-change frames10:15 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. The site presents a largely static view, with the positions of machines and stockpiled material appearing virtually identical to the previous observation.
      10:30 AM PT

      The site presents a largely static view, with the positions of machines and stockpiled material appearing virtually identical to the previous observation.

    2. Construction camera frame at 10:15 AM PT. A truck is visible leaving the site via the driveway on the left, and another has entered from the same point. Otherwise, the arrangement of the larger machines and material piles appears unchanged.
      10:15 AM PT

      A truck is visible leaving the site via the driveway on the left, and another has entered from the same point. Otherwise, the arrangement of the larger machines and material piles appears unchanged.

  36. Construction camera frame at 10:00 AM PT. The overall layout of the site remains consistent, though one of the excavators near the foreground has shifted slightly to the right.
    10:00 AM PT

    The overall layout of the site remains consistent, though one of the excavators near the foreground has shifted slightly to the right.

  37. Construction camera frame at 9:45 AM PT. The arrangement of equipment and materials across the site holds relatively constant, with no noticeable changes in position.
    9:45 AM PT

    The arrangement of equipment and materials across the site holds relatively constant, with no noticeable changes in position.

  38. Construction camera frame at 9:30 AM PT. A truck has entered the site from the driveway on the left, and is now positioned near the center. Otherwise, the arrangement of machines and materials remains consistent with the previous view.
    9:30 AM PT

    A truck has entered the site from the driveway on the left, and is now positioned near the center. Otherwise, the arrangement of machines and materials remains consistent with the previous view.

  39. Construction camera frame at 9:15 AM PT. The site appears stable, with machines and material arrangements holding steady between these views.
    9:15 AM PT

    The site appears stable, with machines and material arrangements holding steady between these views.

  40. Construction camera frame at 9:00 AM PT. Equipment locations throughout the site are consistent, with no obvious shifts in position noted during this period.
    9:00 AM PT

    Equipment locations throughout the site are consistent, with no obvious shifts in position noted during this period.

  41. 3 similar no-change frames8:15 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The site shows little discernible difference, as the positions of the machinery and materials appear to be static.
      8:45 AM PT

      The site shows little discernible difference, as the positions of the machinery and materials appear to be static.

    2. Construction camera frame at 8:30 AM PT. The scene remains remarkably unchanged, with equipment and material stockpiles holding their positions.
      8:30 AM PT

      The scene remains remarkably unchanged, with equipment and material stockpiles holding their positions.

    3. Construction camera frame at 8:15 AM PT. The site displays a steady state, with the positions of the equipment and material stockpiles remaining largely as they were.
      8:15 AM PT

      The site displays a steady state, with the positions of the equipment and material stockpiles remaining largely as they were.

  42. Construction camera frame at 8:00 AM PT. The site presents a similar view as before, with no clear alterations to the location of the machines or material piles.
    8:00 AM PT

    The site presents a similar view as before, with no clear alterations to the location of the machines or material piles.

  43. Construction camera frame at 7:45 AM PT. The site maintains a largely consistent appearance, with no significant changes to the placement of equipment or materials detected.
    7:45 AM PT

    The site maintains a largely consistent appearance, with no significant changes to the placement of equipment or materials detected.

  44. Construction camera frame at 7:30 AM PT. The arrangement of machinery across the site appears consistent, with no apparent repositioning of equipment during the interval.
    7:30 AM PT

    The arrangement of machinery across the site appears consistent, with no apparent repositioning of equipment during the interval.

  45. Construction camera frame at 7:15 AM PT. A slight shift in the pile of material near the northeast corner suggests some movement of earth within the work area.
    7:15 AM PT

    A slight shift in the pile of material near the northeast corner suggests some movement of earth within the work area.

  46. 5 similar no-change frames6:00 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The equipment on the site holds its positions, showing no noticeable movement in the last fifteen minutes.
      7:00 AM PT

      The equipment on the site holds its positions, showing no noticeable movement in the last fifteen minutes.

    2. Construction camera frame at 6:45 AM PT. The scene appears unchanged, with the heavy equipment remaining in the same positions across the site.
      6:45 AM PT

      The scene appears unchanged, with the heavy equipment remaining in the same positions across the site.

    3. Construction camera frame at 6:30 AM PT. The view of the site remains stable, with no discernible shifts in equipment positioning over the past quarter hour.
      6:30 AM PT

      The view of the site remains stable, with no discernible shifts in equipment positioning over the past quarter hour.

    4. Construction camera frame at 6:15 AM PT. The construction site presents a static view, with all heavy equipment remaining in the same locations as before.
      6:15 AM PT

      The construction site presents a static view, with all heavy equipment remaining in the same locations as before.

    5. Construction camera frame at 6:00 AM PT. No activity is observed between frames, and all machinery remains in place.
      6:00 AM PT

      No activity is observed between frames, and all machinery remains in place.

  47. Construction camera frame at 5:45 AM PT. The scene remains remarkably consistent, with the equipment maintaining its positions across the site.
    5:45 AM PT

    The scene remains remarkably consistent, with the equipment maintaining its positions across the site.

  48. 8 similar no-change frames12:00 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The arrangement of equipment on site appears largely unchanged over the last fifteen minutes.
      5:30 AM PT

      The arrangement of equipment on site appears largely unchanged over the last fifteen minutes.

    2. Construction camera frame at 5:15 AM PT. The site is now visible in daylight, revealing several pieces of heavy equipment positioned across the graded area. Conditions are quiet, with no apparent movement of machines or vehicles in the last fifteen minutes.
      5:15 AM PT

      The site is now visible in daylight, revealing several pieces of heavy equipment positioned across the graded area. Conditions are quiet, with no apparent movement of machines or vehicles in the last fifteen minutes.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 21All daysJul 23 →