Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, July 24, 2026

Construction log

Friday, July 24, 2026

73 snapshots from the live camera.


AI digest

The site remained largely quiet, with heavy equipment and material piles holding nearly the same positions through the day; a few vehicles came and went, and excavators made only slight shifts. Compared with the week-earlier frame, the central work area appears more graded and even, though the dim lighting makes the extent of change difficult to judge.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 7 similar no-change frames8:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:15 PM PT. NoHCNo visible activity or movement has occurred across the site since the previous frame.
      9:15 PM PT

      NoHCNo visible activity or movement has occurred across the site since the previous frame.

    3. Construction camera frame at 9:00 PM PT. The site maintains a consistent appearance, with equipment remaining in the same locations as previously observed.
      9:00 PM PT

      The site maintains a consistent appearance, with equipment remaining in the same locations as previously observed.

    4. Construction camera frame at 8:45 PM PT. The site presents a similar view to the last check, with no discernible changes in machine positions or material arrangements.
      8:45 PM PT

      The site presents a similar view to the last check, with no discernible changes in machine positions or material arrangements.

    5. Construction camera frame at 8:30 PM PT. The overall view of the site is consistent, showing no significant shifts in equipment placement or material distribution.
      8:30 PM PT

      The overall view of the site is consistent, showing no significant shifts in equipment placement or material distribution.

    6. Construction camera frame at 8:15 PM PT. The site appears largely static, with the positions of the machinery and material distribution holding steady over the last quarter hour.
      8:15 PM PT

      The site appears largely static, with the positions of the machinery and material distribution holding steady over the last quarter hour.

    7. Construction camera frame at 8:00 PM PT. The scene remains quite still, with no apparent movement of machines or materials in the last fifteen minutes.
      8:00 PM PT

      The scene remains quite still, with no apparent movement of machines or materials in the last fifteen minutes.

  3. Construction camera frame at 7:45 PM PT. The arrangement of equipment across the site remains remarkably stable, with only subtle shifts in shadow positions apparent.
    7:45 PM PT

    The arrangement of equipment across the site remains remarkably stable, with only subtle shifts in shadow positions apparent.

  4. Construction camera frame at 7:30 PM PT. The shadows have shifted across the site, but the positions of the machines and material stockpiles remain largely unchanged.
    7:30 PM PT

    The shadows have shifted across the site, but the positions of the machines and material stockpiles remain largely unchanged.

  5. Construction camera frame at 7:15 PM PT. A small yellow vehicle has appeared near the driveway on the left side of the frame. Otherwise, the arrangement of equipment and materials across the site remains consistent.
    7:15 PM PT

    A small yellow vehicle has appeared near the driveway on the left side of the frame. Otherwise, the arrangement of equipment and materials across the site remains consistent.

  6. Construction camera frame at 7:00 PM PT. The site continues to show very little variation, with the equipment and material locations remaining essentially as they were.
    7:00 PM PT

    The site continues to show very little variation, with the equipment and material locations remaining essentially as they were.

  7. Construction camera frame at 6:45 PM PT. The scene presents a consistent picture, with equipment and material arrangements remaining virtually the same as before.
    6:45 PM PT

    The scene presents a consistent picture, with equipment and material arrangements remaining virtually the same as before.

  8. Construction camera frame at 6:30 PM PT. The equipment and stockpiles on site maintain their positions, though the sunlight now casts slightly different shadows.
    6:30 PM PT

    The equipment and stockpiles on site maintain their positions, though the sunlight now casts slightly different shadows.

  9. Construction camera frame at 6:15 PM PT. The site appears static, with no discernible movement of equipment or materials in the last quarter of an hour.
    6:15 PM PT

    The site appears static, with no discernible movement of equipment or materials in the last quarter of an hour.

  10. Construction camera frame at 6:00 PM PT. The arrangement of the machines and piles on site is remarkably similar, with only minor adjustments to shadows across the area.
    6:00 PM PT

    The arrangement of the machines and piles on site is remarkably similar, with only minor adjustments to shadows across the area.

  11. Construction camera frame at 5:45 PM PT. The scene remains largely unchanged, with the positions of the heavy equipment and material piles appearing consistent.
    5:45 PM PT

    The scene remains largely unchanged, with the positions of the heavy equipment and material piles appearing consistent.

  12. Construction camera frame at 5:30 PM PT. The overall arrangement of equipment and materials holds steady, though the shadows have shifted slightly with the sun’s movement.
    5:30 PM PT

    The overall arrangement of equipment and materials holds steady, though the shadows have shifted slightly with the sun’s movement.

  13. Construction camera frame at 5:15 PM PT. A blue pickup truck is now positioned near the driveway on the left side of the frame.
    5:15 PM PT

    A blue pickup truck is now positioned near the driveway on the left side of the frame.

  14. Construction camera frame at 5:00 PM PT. The layout of machines and materials is consistent between views, though a small white vehicle is now visible near the driveway on the left.
    5:00 PM PT

    The layout of machines and materials is consistent between views, though a small white vehicle is now visible near the driveway on the left.

  15. Construction camera frame at 4:45 PM PT. A yellow machine has shifted position in the foreground, moving slightly to the right since the last view.
    4:45 PM PT

    A yellow machine has shifted position in the foreground, moving slightly to the right since the last view.

  16. Construction camera frame at 4:30 PM PT. The site appears quiet, with no discernible shifts in the positions of equipment or materials.
    4:30 PM PT

    The site appears quiet, with no discernible shifts in the positions of equipment or materials.

  17. Construction camera frame at 4:15 PM PT. The scene shows little alteration, with the machines and stockpiled material appearing in the same arrangement as before.
    4:15 PM PT

    The scene shows little alteration, with the machines and stockpiled material appearing in the same arrangement as before.

  18. Construction camera frame at 4:00 PM PT. The site remains remarkably still, with the positions of the machines and materials appearing unchanged.
    4:00 PM PT

    The site remains remarkably still, with the positions of the machines and materials appearing unchanged.

  19. Construction camera frame at 3:45 PM PT. The scene is holding steady, with the machinery maintaining its positions from the previous view.
    3:45 PM PT

    The scene is holding steady, with the machinery maintaining its positions from the previous view.

  20. 2 similar no-change frames3:15 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The equipment layout is largely unchanged, though a light-colored truck is now visible exiting the driveway on the left side of the frame.
      3:30 PM PT

      The equipment layout is largely unchanged, though a light-colored truck is now visible exiting the driveway on the left side of the frame.

    2. Construction camera frame at 3:15 PM PT. The site presents a similar view as before, with the heavy equipment remaining in largely the same locations.
      3:15 PM PT

      The site presents a similar view as before, with the heavy equipment remaining in largely the same locations.

  21. Construction camera frame at 3:00 PM PT. The arrangement of equipment remains consistent, though a small yellow machine has shifted position slightly in the foreground.
    3:00 PM PT

    The arrangement of equipment remains consistent, though a small yellow machine has shifted position slightly in the foreground.

  22. Construction camera frame at 2:45 PM PT. The scene appears static, with no noticeable changes to the equipment or material arrangements over the last quarter hour.
    2:45 PM PT

    The scene appears static, with no noticeable changes to the equipment or material arrangements over the last quarter hour.

  23. Construction camera frame at 2:30 PM PT. The machines on site are holding their positions, though a small white vehicle is now present near the trees at the far right.
    2:30 PM PT

    The machines on site are holding their positions, though a small white vehicle is now present near the trees at the far right.

  24. Construction camera frame at 2:15 PM PT. The site remains largely as it was, though a white car is now visible briefly pulling into the driveway on the left.
    2:15 PM PT

    The site remains largely as it was, though a white car is now visible briefly pulling into the driveway on the left.

  25. Construction camera frame at 2:00 PM PT. A white vehicle is now visible on the service road at the right edge of the frame, and one of the excavators near the center has subtly altered its orientation.
    2:00 PM PT

    A white vehicle is now visible on the service road at the right edge of the frame, and one of the excavators near the center has subtly altered its orientation.

  26. Construction camera frame at 1:45 PM PT. AnLackingC-shaped activity is visible in the foreground as one excavator has moved and shifted someSH material, while a white truck has entered the service road on the right.
    1:45 PM PT

    AnLackingC-shaped activity is visible in the foreground as one excavator has moved and shifted someSH material, while a white truck has entered the service road on the right.

  27. Construction camera frame at 1:30 PM PT. The site shows minimal alteration, with the machines and material piles holding relatively stable positions.
    1:30 PM PT

    The site shows minimal alteration, with the machines and material piles holding relatively stable positions.

  28. Construction camera frame at 1:15 PM PT. One of the excavators near the center of the frame has shifted position, and a small amount of material appears to have been redistributed around it.
    1:15 PM PT

    One of the excavators near the center of the frame has shifted position, and a small amount of material appears to have been redistributed around it.

  29. Construction camera frame at 1:00 PM PT. The arrangement of the equipment and material across the site remains remarkably consistent, though a small amount of material has been moved near the center.
    1:00 PM PT

    The arrangement of the equipment and material across the site remains remarkably consistent, though a small amount of material has been moved near the center.

  30. Construction camera frame at 12:45 PM PT. The site appears static, with the equipment and material distribution remaining largely unchanged from the previous view.
    12:45 PM PT

    The site appears static, with the equipment and material distribution remaining largely unchanged from the previous view.

  31. Construction camera frame at 12:30 PM PT. The machines across the site appear to be holding their positions, with only a slight alteration in the arrangement of material near the foreground.
    12:30 PM PT

    The machines across the site appear to be holding their positions, with only a slight alteration in the arrangement of material near the foreground.

  32. Construction camera frame at 12:15 PM PT. The equipment remains in generally the same locations as before, though a minor shift in the material arrangement is visible toward the foreground.
    12:15 PM PT

    The equipment remains in generally the same locations as before, though a minor shift in the material arrangement is visible toward the foreground.

  33. Construction camera frame at 12:00 PM PT. A light-colored truck is exiting the site via the driveway on the left, heading onto the public street. The positions of the larger machines and material piles appear to be holding steady.
    12:00 PM PT

    A light-colored truck is exiting the site via the driveway on the left, heading onto the public street. The positions of the larger machines and material piles appear to be holding steady.

  34. Construction camera frame at 11:45 AM PT. The arrangement of machines and material across the site is almost identical to the last view, though one excavator near the bottom center of the frame appears to have rotated slightly.
    11:45 AM PT

    The arrangement of machines and material across the site is almost identical to the last view, though one excavator near the bottom center of the frame appears to have rotated slightly.

  35. Construction camera frame at 11:30 AM PT. A small white vehicle has pulled onto the site from the driveway on the left, parking near the other equipment, and a slight rearrangement of material is visible near the center of the work area.
    11:30 AM PT

    A small white vehicle has pulled onto the site from the driveway on the left, parking near the other equipment, and a slight rearrangement of material is visible near the center of the work area.

  36. Construction camera frame at 11:15 AM PT. The scene remains remarkably consistent, with no visible movement of equipment or alterations to the material layout.
    11:15 AM PT

    The scene remains remarkably consistent, with no visible movement of equipment or alterations to the material layout.

  37. Construction camera frame at 11:00 AM PT. The white pickup truck that arrived earlier has now moved further into the site, closer to the center of the work area. Otherwise, the machines and material stockpiles maintain their previous arrangement.
    11:00 AM PT

    The white pickup truck that arrived earlier has now moved further into the site, closer to the center of the work area. Otherwise, the machines and material stockpiles maintain their previous arrangement.

  38. 4 similar no-change frames10:00 AM–10:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:45 AM PT. The site appears largely unchanged, with the equipment and stockpiled material holding their positions from the previous view.
      10:45 AM PT

      The site appears largely unchanged, with the equipment and stockpiled material holding their positions from the previous view.

    2. Construction camera frame at 10:30 AM PT. A white pickup truck has entered the site via the driveway on the left side of the frame and is now parked near the equipment. Otherwise, the scene appears static, with the machines and material distribution holding their previous positions.
      10:30 AM PT

      A white pickup truck has entered the site via the driveway on the left side of the frame and is now parked near the equipment. Otherwise, the scene appears static, with the machines and material distribution holding their previous positions.

    3. Construction camera frame at 10:15 AM PT. The equipment remains in generally the same positions, though one of the excavators near the center of the frame seems to have shifted slightly to the south.
      10:15 AM PT

      The equipment remains in generally the same positions, though one of the excavators near the center of the frame seems to have shifted slightly to the south.

    4. Construction camera frame at 10:00 AM PT. The work area continues to show a consistent state, with no apparent shifts in equipment locations or material piles.
      10:00 AM PT

      The work area continues to show a consistent state, with no apparent shifts in equipment locations or material piles.

  39. Construction camera frame at 9:45 AM PT. The arrangement of equipment remains largely the same, though shadows have shifted slightly across the work area.
    9:45 AM PT

    The arrangement of equipment remains largely the same, though shadows have shifted slightly across the work area.

  40. Construction camera frame at 9:30 AM PT. The scene presents a very similar view, with no discernible movement of equipment or materials.
    9:30 AM PT

    The scene presents a very similar view, with no discernible movement of equipment or materials.

  41. Construction camera frame at 9:15 AM PT. The site holds a stable appearance, with the positions of the machines and materials remaining consistent.
    9:15 AM PT

    The site holds a stable appearance, with the positions of the machines and materials remaining consistent.

  42. Construction camera frame at 9:00 AM PT. The equipment layout is remarkably unchanged, although the material distribution in the central area appears slightly different.
    9:00 AM PT

    The equipment layout is remarkably unchanged, although the material distribution in the central area appears slightly different.

  43. Construction camera frame at 8:45 AM PT. A few more vehicles are now visible parked along the service road on the right side of the frame.
    8:45 AM PT

    A few more vehicles are now visible parked along the service road on the right side of the frame.

  44. Construction camera frame at 8:30 AM PT. The site appears quiet, with the positions of the machines holding steady between these views.
    8:30 AM PT

    The site appears quiet, with the positions of the machines holding steady between these views.

  45. 3 similar no-change frames7:45 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The overall scene remains consistent, with no apparent changes in equipment positioning or activity.
      8:15 AM PT

      The overall scene remains consistent, with no apparent changes in equipment positioning or activity.

    2. Construction camera frame at 8:00 AM PT. The arrangement of the heavy equipment remains largely static, though a small pile of material has shifted near the center.
      8:00 AM PT

      The arrangement of the heavy equipment remains largely static, though a small pile of material has shifted near the center.

    3. Construction camera frame at 7:45 AM PT. The scene presents a steady state, with the arrangement of machinery appearing virtually the same as before.
      7:45 AM PT

      The scene presents a steady state, with the arrangement of machinery appearing virtually the same as before.

  46. Construction camera frame at 7:30 AM PT. One of the excavators near the center of the frame has shifted its position slightly to the south.
    7:30 AM PT

    One of the excavators near the center of the frame has shifted its position slightly to the south.

  47. Construction camera frame at 7:15 AM PT. A white van has appeared near the driveway on the left side of the frame.
    7:15 AM PT

    A white van has appeared near the driveway on the left side of the frame.

  48. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The equipment layout appears nearly identical, with no significant movements detected during the interval.
      7:00 AM PT

      The equipment layout appears nearly identical, with no significant movements detected during the interval.

    2. Construction camera frame at 6:45 AM PT. The site’s appearance is remarkably unchanged, though the lighting seems slightly brighter in this view.
      6:45 AM PT

      The site’s appearance is remarkably unchanged, though the lighting seems slightly brighter in this view.

  49. Construction camera frame at 6:30 AM PT. The scene is holding a consistent appearance, with no noticeable adjustments to equipment placement.
    6:30 AM PT

    The scene is holding a consistent appearance, with no noticeable adjustments to equipment placement.

  50. Construction camera frame at 6:15 AM PT. The overall scene remains quite similar, though a small, dark-colored vehicle has entered the site via the driveway on the left.
    6:15 AM PT

    The overall scene remains quite similar, though a small, dark-colored vehicle has entered the site via the driveway on the left.

  51. Construction camera frame at 6:00 AM PT. The site presents a largely static picture, with the machines maintaining their positions from the previous view.
    6:00 AM PT

    The site presents a largely static picture, with the machines maintaining their positions from the previous view.

  52. Construction camera frame at 5:45 AM PT. The scene appears stable, with the positioning of equipment and materials holding steady across both views.
    5:45 AM PT

    The scene appears stable, with the positioning of equipment and materials holding steady across both views.

  53. 8 similar no-change frames12:00 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The arrangement of equipment on the site remains consistent between these views, with no apparent shifts in position.
      5:30 AM PT

      The arrangement of equipment on the site remains consistent between these views, with no apparent shifts in position.

    2. Construction camera frame at 5:15 AM PT. The site is now illuminated, revealing several pieces of heavy equipment positioned across the graded area. Visibility has improved, and the layout of machines appears largely unchanged from the earlier frame.
      5:15 AM PT

      The site is now illuminated, revealing several pieces of heavy equipment positioned across the graded area. Visibility has improved, and the layout of machines appears largely unchanged from the earlier frame.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 23All daysJul 25 →