Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, July 26, 2026

Construction log

Sunday, July 26, 2026

71 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The site was quiet today, with no major changes in the ground or equipment positions. A light-colored vehicle entered the site twice via the driveway.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  8. The equipment arrangement appears stable, with no noticeable shifts in position over the last fifteen minutes.
    7:45 PM PT

    The equipment arrangement appears stable, with no noticeable shifts in position over the last fifteen minutes.

  9. A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment positions and overall scene appear consistent between the two views.
    7:30 PM PT

    A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment positions and overall scene appear consistent between the two views.

  10. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  11. The site presents a familiar view, with all the heavy equipment remaining in the same positions.
    7:00 PM PT

    The site presents a familiar view, with all the heavy equipment remaining in the same positions.

  12. No construction activity — the site is quiet.
    6:45 PM PT

    No construction activity — the site is quiet.

  13. The scene is holding steady, with the equipment maintaining the same positions as in the previous view.
    6:30 PM PT

    The scene is holding steady, with the equipment maintaining the same positions as in the previous view.

  14. The site remains largely unchanged, with the machines appearing in the same locations as they were fifteen minutes ago.
    6:15 PM PT

    The site remains largely unchanged, with the machines appearing in the same locations as they were fifteen minutes ago.

  15. The arrangement of equipment across the site appears static, with no discernible shifts in position during the last quarter hour.
    6:00 PM PT

    The arrangement of equipment across the site appears static, with no discernible shifts in position during the last quarter hour.

  16. NoSCno movement is visible across the site, with all machinery and vehicles remaining in place.
    5:45 PM PT

    NoSCno movement is visible across the site, with all machinery and vehicles remaining in place.

  17. The equipment layout remains consistent, showing no noticeable changes in position over the past fifteen minutes.
    5:30 PM PT

    The equipment layout remains consistent, showing no noticeable changes in position over the past fifteen minutes.

  18. The site presents a consistent picture, with all visible machines holding their positions from the earlier view.
    5:15 PM PT

    The site presents a consistent picture, with all visible machines holding their positions from the earlier view.

  19. No construction activity — the site is quiet.
    5:00 PM PT

    No construction activity — the site is quiet.

  20. No construction activity — the site is quiet.
    4:45 PM PT

    No construction activity — the site is quiet.

  21. The scene remains largely unchanged, with the equipment appearing in the same positions as fifteen minutes ago.
    4:30 PM PT

    The scene remains largely unchanged, with the equipment appearing in the same positions as fifteen minutes ago.

  22. The arrangement of equipment across the site appears static, with no discernible shifts in position over the last quarter hour.
    4:15 PM PT

    The arrangement of equipment across the site appears static, with no discernible shifts in position over the last quarter hour.

  23. A white vehicle has entered the site via the driveway on the left side of the frame.
    4:00 PM PT

    A white vehicle has entered the site via the driveway on the left side of the frame.

  24. No movement is visible across the site, with all machinery remaining exactly where it was.
    3:45 PM PT

    No movement is visible across the site, with all machinery remaining exactly where it was.

  25. No construction activity — the site is quiet.
    3:30 PM PT

    No construction activity — the site is quiet.

  26. No construction activity — the site is quiet.
    3:15 PM PT

    No construction activity — the site is quiet.

  27. The site maintains its current appearance, showing no visible changes in machine positions or activity over the last fifteen minutes.
    3:00 PM PT

    The site maintains its current appearance, showing no visible changes in machine positions or activity over the last fifteen minutes.

  28. The machines on site have not shifted locations during this period, maintaining the same arrangement as before.
    2:45 PM PT

    The machines on site have not shifted locations during this period, maintaining the same arrangement as before.

  29. The site presents a stable picture, with the machines all remaining in their previous locations.
    2:30 PM PT

    The site presents a stable picture, with the machines all remaining in their previous locations.

  30. The equipment layout is remarkably unchanged, with all machines appearing to stay in place during this interval.
    2:15 PM PT

    The equipment layout is remarkably unchanged, with all machines appearing to stay in place during this interval.

  31. The equipment across the site appears to be holding steady, with no discernible shifts in position over the last fifteen minutes.
    2:00 PM PT

    The equipment across the site appears to be holding steady, with no discernible shifts in position over the last fifteen minutes.

  32. The scene remains largely static, with the machinery holding its positions across the work area.
    1:45 PM PT

    The scene remains largely static, with the machinery holding its positions across the work area.

  33. The arrangement of equipment across the site remains consistent, with no apparent repositioning in the last quarter hour.
    1:30 PM PT

    The arrangement of equipment across the site remains consistent, with no apparent repositioning in the last quarter hour.

  34. The scene appears much the same as it did moments ago, with the equipment maintaining its positions across the site.
    1:15 PM PT

    The scene appears much the same as it did moments ago, with the equipment maintaining its positions across the site.

  35. The heavy machinery remains in essentially the same arrangement as before, with no obvious movement detected.
    1:00 PM PT

    The heavy machinery remains in essentially the same arrangement as before, with no obvious movement detected.

  36. A small, light-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and general scene appear static between these views.
    12:45 PM PT

    A small, light-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and general scene appear static between these views.

  37. The site’s layout is nearly unchanged in the last fifteen minutes, with the machines remaining in the same positions.
    12:30 PM PT

    The site’s layout is nearly unchanged in the last fifteen minutes, with the machines remaining in the same positions.

  38. The site presents a similar picture now, with the heavy equipment holding its positions.
    12:15 PM PT

    The site presents a similar picture now, with the heavy equipment holding its positions.

  39. The scene is remarkably stable, with no discernible shifts in equipment positions or activity.
    12:00 PM PT

    The scene is remarkably stable, with no discernible shifts in equipment positions or activity.

  40. The arrangement of equipment on site remains largely consistent between these views.
    11:45 AM PT

    The arrangement of equipment on site remains largely consistent between these views.

  41. The site appears much the same as it did a few moments ago, with the equipment largely unmoved.
    11:30 AM PT

    The site appears much the same as it did a few moments ago, with the equipment largely unmoved.

  42. No construction activity — the site is quiet.
    11:15 AM PT

    No construction activity — the site is quiet.

  43. No construction activity — the site is quiet.
    11:00 AM PT

    No construction activity — the site is quiet.

  44. No construction activity — the site is quiet.
    10:45 AM PT

    No construction activity — the site is quiet.

  45. No construction activity — the site is quiet.
    10:30 AM PT

    No construction activity — the site is quiet.

  46. No construction activity — the site is quiet.
    10:15 AM PT

    No construction activity — the site is quiet.

  47. No construction activity — the site is quiet.
    10:00 AM PT

    No construction activity — the site is quiet.

  48. No construction activity — the site is quiet.
    9:45 AM PT

    No construction activity — the site is quiet.

  49. No construction activity — the site is quiet.
    9:30 AM PT

    No construction activity — the site is quiet.

  50. No construction activity — the site is quiet.
    9:15 AM PT

    No construction activity — the site is quiet.

  51. No construction activity — the site is quiet.
    9:00 AM PT

    No construction activity — the site is quiet.

  52. No construction activity — the site is quiet.
    8:45 AM PT

    No construction activity — the site is quiet.

  53. No construction activity — the site is quiet.
    8:30 AM PT

    No construction activity — the site is quiet.

  54. No construction activity — the site is quiet.
    8:15 AM PT

    No construction activity — the site is quiet.

  55. No construction activity — the site is quiet.
    8:00 AM PT

    No construction activity — the site is quiet.

  56. No construction activity — the site is quiet.
    7:45 AM PT

    No construction activity — the site is quiet.

  57. No construction activity — the site is quiet.
    7:30 AM PT

    No construction activity — the site is quiet.

  58. No construction activity — the site is quiet.
    7:15 AM PT

    No construction activity — the site is quiet.

  59. No construction activity — the site is quiet.
    7:00 AM PT

    No construction activity — the site is quiet.

  60. No construction activity — the site is quiet.
    6:45 AM PT

    No construction activity — the site is quiet.

  61. No construction activity — the site is quiet.
    6:30 AM PT

    No construction activity — the site is quiet.

  62. No construction activity — the site is quiet.
    6:15 AM PT

    No construction activity — the site is quiet.

  63. No construction activity — the site is quiet.
    6:00 AM PT

    No construction activity — the site is quiet.

  64. No construction activity — the site is quiet.
    5:45 AM PT

    No construction activity — the site is quiet.

  65. No construction activity — the site is quiet.
    5:30 AM PT

    No construction activity — the site is quiet.

  66. No construction activity — the site is quiet.
    5:00 AM PT

    No construction activity — the site is quiet.

  67. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  68. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  69. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  70. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  71. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jul 25All daysJul 27 →