Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, July 26, 2026

Construction log

Sunday, July 26, 2026

71 snapshots from the live camera.


AI digest

The site was largely quiet, with heavy equipment holding its positions throughout the day; a few light-colored vehicles entered via the left driveway. Compared with a week earlier, the ground layout and machinery arrangement appear broadly similar, with no clear substantial change visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 7 similar no-change frames7:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:45 PM PT. The equipment arrangement appears stable, with no noticeable shifts in position over the last fifteen minutes.
      7:45 PM PT

      The equipment arrangement appears stable, with no noticeable shifts in position over the last fifteen minutes.

  3. Construction camera frame at 7:30 PM PT. A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment positions and overall scene appear consistent between the two views.
    7:30 PM PT

    A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment positions and overall scene appear consistent between the two views.

  4. 8 similar no-change frames5:30 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 7:00 PM PT. The site presents a familiar view, with all the heavy equipment remaining in the same positions.
      7:00 PM PT

      The site presents a familiar view, with all the heavy equipment remaining in the same positions.

    3. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 6:30 PM PT. The scene is holding steady, with the equipment maintaining the same positions as in the previous view.
      6:30 PM PT

      The scene is holding steady, with the equipment maintaining the same positions as in the previous view.

    5. Construction camera frame at 6:15 PM PT. The site remains largely unchanged, with the machines appearing in the same locations as they were fifteen minutes ago.
      6:15 PM PT

      The site remains largely unchanged, with the machines appearing in the same locations as they were fifteen minutes ago.

    6. Construction camera frame at 6:00 PM PT. The arrangement of equipment across the site appears static, with no discernible shifts in position during the last quarter hour.
      6:00 PM PT

      The arrangement of equipment across the site appears static, with no discernible shifts in position during the last quarter hour.

    7. Construction camera frame at 5:45 PM PT. NoSCno movement is visible across the site, with all machinery and vehicles remaining in place.
      5:45 PM PT

      NoSCno movement is visible across the site, with all machinery and vehicles remaining in place.

    8. Construction camera frame at 5:30 PM PT. The equipment layout remains consistent, showing no noticeable changes in position over the past fifteen minutes.
      5:30 PM PT

      The equipment layout remains consistent, showing no noticeable changes in position over the past fifteen minutes.

  5. Construction camera frame at 5:15 PM PT. The site presents a consistent picture, with all visible machines holding their positions from the earlier view.
    5:15 PM PT

    The site presents a consistent picture, with all visible machines holding their positions from the earlier view.

  6. 4 similar no-change frames4:15 PM–5:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 PM PT. No construction activity — the site is quiet.
      5:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:45 PM PT. No construction activity — the site is quiet.
      4:45 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:30 PM PT. The scene remains largely unchanged, with the equipment appearing in the same positions as fifteen minutes ago.
      4:30 PM PT

      The scene remains largely unchanged, with the equipment appearing in the same positions as fifteen minutes ago.

    4. Construction camera frame at 4:15 PM PT. The arrangement of equipment across the site appears static, with no discernible shifts in position over the last quarter hour.
      4:15 PM PT

      The arrangement of equipment across the site appears static, with no discernible shifts in position over the last quarter hour.

  7. Construction camera frame at 4:00 PM PT. A white vehicle has entered the site via the driveway on the left side of the frame.
    4:00 PM PT

    A white vehicle has entered the site via the driveway on the left side of the frame.

  8. 4 similar no-change frames3:00 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. No movement is visible across the site, with all machinery remaining exactly where it was.
      3:45 PM PT

      No movement is visible across the site, with all machinery remaining exactly where it was.

    2. Construction camera frame at 3:30 PM PT. No construction activity — the site is quiet.
      3:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:15 PM PT. No construction activity — the site is quiet.
      3:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 PM PT. The site maintains its current appearance, showing no visible changes in machine positions or activity over the last fifteen minutes.
      3:00 PM PT

      The site maintains its current appearance, showing no visible changes in machine positions or activity over the last fifteen minutes.

  9. Construction camera frame at 2:45 PM PT. The machines on site have not shifted locations during this period, maintaining the same arrangement as before.
    2:45 PM PT

    The machines on site have not shifted locations during this period, maintaining the same arrangement as before.

  10. Construction camera frame at 2:30 PM PT. The site presents a stable picture, with the machines all remaining in their previous locations.
    2:30 PM PT

    The site presents a stable picture, with the machines all remaining in their previous locations.

  11. 3 similar no-change frames1:45 PM–2:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:15 PM PT. The equipment layout is remarkably unchanged, with all machines appearing to stay in place during this interval.
      2:15 PM PT

      The equipment layout is remarkably unchanged, with all machines appearing to stay in place during this interval.

    2. Construction camera frame at 2:00 PM PT. The equipment across the site appears to be holding steady, with no discernible shifts in position over the last fifteen minutes.
      2:00 PM PT

      The equipment across the site appears to be holding steady, with no discernible shifts in position over the last fifteen minutes.

    3. Construction camera frame at 1:45 PM PT. The scene remains largely static, with the machinery holding its positions across the work area.
      1:45 PM PT

      The scene remains largely static, with the machinery holding its positions across the work area.

  12. Construction camera frame at 1:30 PM PT. The arrangement of equipment across the site remains consistent, with no apparent repositioning in the last quarter hour.
    1:30 PM PT

    The arrangement of equipment across the site remains consistent, with no apparent repositioning in the last quarter hour.

  13. Construction camera frame at 1:15 PM PT. The scene appears much the same as it did moments ago, with the equipment maintaining its positions across the site.
    1:15 PM PT

    The scene appears much the same as it did moments ago, with the equipment maintaining its positions across the site.

  14. Construction camera frame at 1:00 PM PT. The heavy machinery remains in essentially the same arrangement as before, with no obvious movement detected.
    1:00 PM PT

    The heavy machinery remains in essentially the same arrangement as before, with no obvious movement detected.

  15. 2 similar no-change frames12:30 PM–12:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:45 PM PT. A small, light-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and general scene appear static between these views.
      12:45 PM PT

      A small, light-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and general scene appear static between these views.

    2. Construction camera frame at 12:30 PM PT. The site’s layout is nearly unchanged in the last fifteen minutes, with the machines remaining in the same positions.
      12:30 PM PT

      The site’s layout is nearly unchanged in the last fifteen minutes, with the machines remaining in the same positions.

  16. Construction camera frame at 12:15 PM PT. The site presents a similar picture now, with the heavy equipment holding its positions.
    12:15 PM PT

    The site presents a similar picture now, with the heavy equipment holding its positions.

  17. Construction camera frame at 12:00 PM PT. The scene is remarkably stable, with no discernible shifts in equipment positions or activity.
    12:00 PM PT

    The scene is remarkably stable, with no discernible shifts in equipment positions or activity.

  18. Construction camera frame at 11:45 AM PT. The arrangement of equipment on site remains largely consistent between these views.
    11:45 AM PT

    The arrangement of equipment on site remains largely consistent between these views.

  19. Construction camera frame at 11:30 AM PT. The site appears much the same as it did a few moments ago, with the equipment largely unmoved.
    11:30 AM PT

    The site appears much the same as it did a few moments ago, with the equipment largely unmoved.

  20. 30 similar no-change frames12:00 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. No construction activity — the site is quiet.
      11:15 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 11:00 AM PT. No construction activity — the site is quiet.
      11:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 10:45 AM PT. No construction activity — the site is quiet.
      10:45 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 10:30 AM PT. No construction activity — the site is quiet.
      10:30 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 10:15 AM PT. No construction activity — the site is quiet.
      10:15 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 10:00 AM PT. No construction activity — the site is quiet.
      10:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 9:45 AM PT. No construction activity — the site is quiet.
      9:45 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 9:30 AM PT. No construction activity — the site is quiet.
      9:30 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 9:15 AM PT. No construction activity — the site is quiet.
      9:15 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 9:00 AM PT. No construction activity — the site is quiet.
      9:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 8:45 AM PT. No construction activity — the site is quiet.
      8:45 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 8:30 AM PT. No construction activity — the site is quiet.
      8:30 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 8:15 AM PT. No construction activity — the site is quiet.
      8:15 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 8:00 AM PT. No construction activity — the site is quiet.
      8:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 7:45 AM PT. No construction activity — the site is quiet.
      7:45 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 7:30 AM PT. No construction activity — the site is quiet.
      7:30 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 7:15 AM PT. No construction activity — the site is quiet.
      7:15 AM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 7:00 AM PT. No construction activity — the site is quiet.
      7:00 AM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    20. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    21. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    22. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    23. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    24. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    25. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    26. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    27. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    28. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    29. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    30. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 25All daysJul 27 →