606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, September 8, 2026

Construction log

Tuesday, September 8, 2026

65 snapshots from the live camera.


AI digest

Earth was visibly shifted during the day: a broad dark strip of soil now crosses the central area, with machinery positioned along it and at its left end. A fire truck briefly entered and left; other small vehicles appeared, but no further ground change was noted.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. Visibility is too low to assess construction activity.
    11:00 PM PT

    Visibility is too low to assess construction activity.

  2. 3 low-visibility frames8:00 PM–10:00 PM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 10:00 PM PT. Visibility is too low to assess construction activity.
      10:00 PM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 9:00 PM PT. Visibility is too low to assess construction activity.
      9:00 PM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 8:00 PM PT. Visibility is too low to assess construction activity.
      8:00 PM PT

      Visibility is too low to assess construction activity.

  3. 30 similar no-change frames12:30 PM–7:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 PM PT. No visible change between these frames.
      7:45 PM PT

      No visible change between these frames.

    2. Construction camera frame at 7:30 PM PT. No visible change between these frames.
      7:30 PM PT

      No visible change between these frames.

    3. Construction camera frame at 7:15 PM PT. No visible change between these frames.
      7:15 PM PT

      No visible change between these frames.

    4. Construction camera frame at 7:00 PM PT. No visible change between these frames.
      7:00 PM PT

      No visible change between these frames.

    5. Construction camera frame at 6:45 PM PT. No visible change between these frames.
      6:45 PM PT

      No visible change between these frames.

    6. Construction camera frame at 6:30 PM PT. No visible change between these frames.
      6:30 PM PT

      No visible change between these frames.

    7. Construction camera frame at 6:15 PM PT. No visible change between these frames.
      6:15 PM PT

      No visible change between these frames.

    8. Construction camera frame at 6:00 PM PT. No visible change between these frames.
      6:00 PM PT

      No visible change between these frames.

    9. Construction camera frame at 5:45 PM PT. No visible change between these frames.
      5:45 PM PT

      No visible change between these frames.

    10. Construction camera frame at 5:30 PM PT. No visible change between these frames.
      5:30 PM PT

      No visible change between these frames.

    11. Construction camera frame at 5:15 PM PT. No visible change between these frames.
      5:15 PM PT

      No visible change between these frames.

    12. Construction camera frame at 5:00 PM PT. No visible change between these frames.
      5:00 PM PT

      No visible change between these frames.

    13. Construction camera frame at 4:45 PM PT. No visible change between these frames.
      4:45 PM PT

      No visible change between these frames.

    14. Construction camera frame at 4:30 PM PT. No visible change between these frames.
      4:30 PM PT

      No visible change between these frames.

    15. Construction camera frame at 4:15 PM PT. No visible change between these frames.
      4:15 PM PT

      No visible change between these frames.

    16. Construction camera frame at 4:00 PM PT. No visible change between these frames.
      4:00 PM PT

      No visible change between these frames.

    17. Construction camera frame at 3:45 PM PT. No visible change between these frames.
      3:45 PM PT

      No visible change between these frames.

    18. Construction camera frame at 3:30 PM PT. No visible change between these frames.
      3:30 PM PT

      No visible change between these frames.

    19. Construction camera frame at 3:15 PM PT. No visible change between these frames.
      3:15 PM PT

      No visible change between these frames.

    20. Construction camera frame at 3:00 PM PT. No visible change between these frames.
      3:00 PM PT

      No visible change between these frames.

    21. Construction camera frame at 2:45 PM PT. No visible change between these frames.
      2:45 PM PT

      No visible change between these frames.

    22. Construction camera frame at 2:30 PM PT. No visible change between these frames.
      2:30 PM PT

      No visible change between these frames.

    23. Construction camera frame at 2:15 PM PT. No visible change between these frames.
      2:15 PM PT

      No visible change between these frames.

    24. Construction camera frame at 2:00 PM PT. No visible change between these frames.
      2:00 PM PT

      No visible change between these frames.

    25. Construction camera frame at 1:45 PM PT. No visible change between these frames.
      1:45 PM PT

      No visible change between these frames.

    26. Construction camera frame at 1:30 PM PT. No visible change between these frames.
      1:30 PM PT

      No visible change between these frames.

    27. Construction camera frame at 1:15 PM PT. No visible change between these frames.
      1:15 PM PT

      No visible change between these frames.

    28. Construction camera frame at 1:00 PM PT. No visible change between these frames.
      1:00 PM PT

      No visible change between these frames.

    29. Construction camera frame at 12:45 PM PT. No visible change between these frames.
      12:45 PM PT

      No visible change between these frames.

    30. Construction camera frame at 12:30 PM PT. No visible change between these frames.
      12:30 PM PT

      No visible change between these frames.

  4. Construction camera frame at 12:15 PM PT. A small white vehicle is now visible in the central area of the site, having appeared between these frames.
    12:15 PM PT

    A small white vehicle is now visible in the central area of the site, having appeared between these frames.

  5. Construction camera frame at 12:00 PM PT. A small white vehicle is now visible in the central area of the site, having appeared between these frames.
    12:00 PM PT

    A small white vehicle is now visible in the central area of the site, having appeared between these frames.

  6. 4 similar no-change frames11:00 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. No visible change between these frames.
      11:45 AM PT

      No visible change between these frames.

    2. Construction camera frame at 11:30 AM PT. No visible change between these frames.
      11:30 AM PT

      No visible change between these frames.

    3. Construction camera frame at 11:15 AM PT. No visible change between these frames.
      11:15 AM PT

      No visible change between these frames.

    4. Construction camera frame at 11:00 AM PT. No visible change between these frames.
      11:00 AM PT

      No visible change between these frames.

  7. Construction camera frame at 10:45 AM PT. A white vehicle has entered the site via the driveway on the left. Otherwise, no visible change between these frames.
    10:45 AM PT

    A white vehicle has entered the site via the driveway on the left. Otherwise, no visible change between these frames.

  8. Construction camera frame at 10:30 AM PT. No visible change between these frames.
    10:30 AM PT

    No visible change between these frames.

  9. Construction camera frame at 10:15 AM PT. The fire truck from the earlier frame is no longer visible on site. Otherwise, no visible change between these frames.
    10:15 AM PT

    The fire truck from the earlier frame is no longer visible on site. Otherwise, no visible change between these frames.

  10. Construction camera frame at 10:00 AM PT. A fire truck has entered the site via the driveway on the left. Otherwise, no visible change between these frames.
    10:00 AM PT

    A fire truck has entered the site via the driveway on the left. Otherwise, no visible change between these frames.

  11. 12 similar no-change frames7:00 AM–9:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:45 AM PT. No visible change between these frames.
      9:45 AM PT

      No visible change between these frames.

    2. Construction camera frame at 9:30 AM PT. No visible change between these frames.
      9:30 AM PT

      No visible change between these frames.

    3. Construction camera frame at 9:15 AM PT. No visible change between these frames.
      9:15 AM PT

      No visible change between these frames.

    4. Construction camera frame at 9:00 AM PT. No visible change between these frames.
      9:00 AM PT

      No visible change between these frames.

    5. Construction camera frame at 8:45 AM PT. No visible change between these frames.
      8:45 AM PT

      No visible change between these frames.

    6. Construction camera frame at 8:30 AM PT. No visible change between these frames.
      8:30 AM PT

      No visible change between these frames.

    7. Construction camera frame at 8:15 AM PT. No visible change between these frames.
      8:15 AM PT

      No visible change between these frames.

    8. Construction camera frame at 8:00 AM PT. No visible change between these frames.
      8:00 AM PT

      No visible change between these frames.

    9. Construction camera frame at 7:45 AM PT. No visible change between these frames.
      7:45 AM PT

      No visible change between these frames.

    10. Construction camera frame at 7:30 AM PT. No visible change between these frames.
      7:30 AM PT

      No visible change between these frames.

    11. Construction camera frame at 7:15 AM PT. No visible change between these frames.
      7:15 AM PT

      No visible change between these frames.

    12. Construction camera frame at 7:00 AM PT. No visible change between these frames.
      7:00 AM PT

      No visible change between these frames.

  12. Construction camera frame at 6:45 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:45 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  13. Construction camera frame at 6:30 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:30 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  14. 7 low-visibility frames12:00 AM–6:00 AM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 6:00 AM PT. Visibility is too low to assess construction activity.
      6:00 AM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 5:00 AM PT. Visibility is too low to assess construction activity.
      5:00 AM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 4:00 AM PT. Visibility is too low to assess construction activity.
      4:00 AM PT

      Visibility is too low to assess construction activity.

    4. Construction camera frame at 3:00 AM PT. Visibility is too low to assess construction activity.
      3:00 AM PT

      Visibility is too low to assess construction activity.

    5. Construction camera frame at 2:00 AM PT. Visibility is too low to assess construction activity.
      2:00 AM PT

      Visibility is too low to assess construction activity.

    6. Construction camera frame at 1:00 AM PT. Visibility is too low to assess construction activity.
      1:00 AM PT

      Visibility is too low to assess construction activity.

    7. Construction camera frame at 12:00 AM PT. Visibility is too low to assess construction activity.
      12:00 AM PT

      Visibility is too low to assess construction activity.

← Sep 7All daysSep 9 →