Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, September 10, 2026

Construction log

Thursday, September 10, 2026

65 snapshots from the live camera.


AI digest

The site remained broadly unchanged through the day, with small vehicles and trucks moving in and out and equipment shifting around the central area. The final frame uses a different camera angle, so it does not establish a clear change to the ground.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. Visibility is too low to assess construction activity.
    11:00 PM PT

    Visibility is too low to assess construction activity.

  2. 3 low-visibility frames8:00 PM–10:00 PM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 10:00 PM PT. Visibility is too low to assess construction activity.
      10:00 PM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 9:00 PM PT. Visibility is too low to assess construction activity.
      9:00 PM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 8:00 PM PT. Visibility is too low to assess construction activity.
      8:00 PM PT

      Visibility is too low to assess construction activity.

  3. 19 similar no-change frames3:15 PM–7:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 PM PT. No visible change between these frames.
      7:45 PM PT

      No visible change between these frames.

    2. Construction camera frame at 7:30 PM PT. No visible change between these frames.
      7:30 PM PT

      No visible change between these frames.

    3. Construction camera frame at 7:15 PM PT. No visible change between these frames.
      7:15 PM PT

      No visible change between these frames.

    4. Construction camera frame at 7:00 PM PT. No visible change between these frames.
      7:00 PM PT

      No visible change between these frames.

    5. Construction camera frame at 6:45 PM PT. No visible change between these frames.
      6:45 PM PT

      No visible change between these frames.

    6. Construction camera frame at 6:30 PM PT. No visible change between these frames.
      6:30 PM PT

      No visible change between these frames.

    7. Construction camera frame at 6:15 PM PT. No visible change between these frames.
      6:15 PM PT

      No visible change between these frames.

    8. Construction camera frame at 6:00 PM PT. No visible change between these frames.
      6:00 PM PT

      No visible change between these frames.

    9. Construction camera frame at 5:45 PM PT. No visible change between these frames.
      5:45 PM PT

      No visible change between these frames.

    10. Construction camera frame at 5:30 PM PT. No visible change between these frames.
      5:30 PM PT

      No visible change between these frames.

    11. Construction camera frame at 5:15 PM PT. No visible change between these frames.
      5:15 PM PT

      No visible change between these frames.

    12. Construction camera frame at 5:00 PM PT. No visible change between these frames.
      5:00 PM PT

      No visible change between these frames.

    13. Construction camera frame at 4:45 PM PT. No visible change between these frames.
      4:45 PM PT

      No visible change between these frames.

    14. Construction camera frame at 4:30 PM PT. No visible change between these frames.
      4:30 PM PT

      No visible change between these frames.

    15. Construction camera frame at 4:15 PM PT. No visible change between these frames.
      4:15 PM PT

      No visible change between these frames.

    16. Construction camera frame at 4:00 PM PT. No visible change between these frames.
      4:00 PM PT

      No visible change between these frames.

    17. Construction camera frame at 3:45 PM PT. No visible change between these frames.
      3:45 PM PT

      No visible change between these frames.

    18. Construction camera frame at 3:30 PM PT. No visible change between these frames.
      3:30 PM PT

      No visible change between these frames.

    19. Construction camera frame at 3:15 PM PT. No visible change between these frames.
      3:15 PM PT

      No visible change between these frames.

  4. Construction camera frame at 3:00 PM PT. A large, light-colored truck has entered the site via the driveway on the left. Otherwise, no visible change between these frames.
    3:00 PM PT

    A large, light-colored truck has entered the site via the driveway on the left. Otherwise, no visible change between these frames.

  5. 3 similar no-change frames2:15 PM–2:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:45 PM PT. No visible change between these frames.
      2:45 PM PT

      No visible change between these frames.

    2. Construction camera frame at 2:30 PM PT. No visible change between these frames.
      2:30 PM PT

      No visible change between these frames.

    3. Construction camera frame at 2:15 PM PT. No visible change between these frames.
      2:15 PM PT

      No visible change between these frames.

  6. Construction camera frame at 2:00 PM PT. A yellow vehicle has appeared on the left side of the site, near the street. Otherwise, no visible change between these frames.
    2:00 PM PT

    A yellow vehicle has appeared on the left side of the site, near the street. Otherwise, no visible change between these frames.

  7. Construction camera frame at 1:45 PM PT. No visible change between these frames.
    1:45 PM PT

    No visible change between these frames.

  8. Construction camera frame at 1:30 PM PT. A small white vehicle has moved from the driveway on the left, further down the street. Otherwise, no visible change between these frames.
    1:30 PM PT

    A small white vehicle has moved from the driveway on the left, further down the street. Otherwise, no visible change between these frames.

  9. 14 similar no-change frames10:00 AM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. No visible change between these frames.
      1:15 PM PT

      No visible change between these frames.

    2. Construction camera frame at 1:00 PM PT. No visible change between these frames.
      1:00 PM PT

      No visible change between these frames.

    3. Construction camera frame at 12:45 PM PT. No visible change between these frames.
      12:45 PM PT

      No visible change between these frames.

    4. Construction camera frame at 12:30 PM PT. No visible change between these frames.
      12:30 PM PT

      No visible change between these frames.

    5. Construction camera frame at 12:15 PM PT. No visible change between these frames.
      12:15 PM PT

      No visible change between these frames.

    6. Construction camera frame at 12:00 PM PT. No visible change between these frames.
      12:00 PM PT

      No visible change between these frames.

    7. Construction camera frame at 11:45 AM PT. No visible change between these frames.
      11:45 AM PT

      No visible change between these frames.

    8. Construction camera frame at 11:30 AM PT. No visible change between these frames.
      11:30 AM PT

      No visible change between these frames.

    9. Construction camera frame at 11:15 AM PT. No visible change between these frames.
      11:15 AM PT

      No visible change between these frames.

    10. Construction camera frame at 11:00 AM PT. No visible change between these frames.
      11:00 AM PT

      No visible change between these frames.

    11. Construction camera frame at 10:45 AM PT. No visible change between these frames.
      10:45 AM PT

      No visible change between these frames.

    12. Construction camera frame at 10:30 AM PT. No visible change between these frames.
      10:30 AM PT

      No visible change between these frames.

    13. Construction camera frame at 10:15 AM PT. No visible change between these frames.
      10:15 AM PT

      No visible change between these frames.

    14. Construction camera frame at 10:00 AM PT. No visible change between these frames.
      10:00 AM PT

      No visible change between these frames.

  10. Construction camera frame at 9:45 AM PT. A vehicle has entered the site from the driveway on the left side of the frame.
    9:45 AM PT

    A vehicle has entered the site from the driveway on the left side of the frame.

  11. 2 similar no-change frames9:15 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. No visible change between these frames.
      9:30 AM PT

      No visible change between these frames.

    2. Construction camera frame at 9:15 AM PT. No visible change between these frames.
      9:15 AM PT

      No visible change between these frames.

  12. Construction camera frame at 9:00 AM PT. A small orange vehicle has moved slightly within the central area of the block.
    9:00 AM PT

    A small orange vehicle has moved slightly within the central area of the block.

  13. Construction camera frame at 8:45 AM PT. No visible change between these frames.
    8:45 AM PT

    No visible change between these frames.

  14. Construction camera frame at 8:30 AM PT. A yellow machine has moved from the lower-left to the center of the block. A truck has entered the site from the driveway on the left.
    8:30 AM PT

    A yellow machine has moved from the lower-left to the center of the block. A truck has entered the site from the driveway on the left.

  15. Construction camera frame at 8:15 AM PT. A vehicle has entered the site from the driveway on the left side of the frame.
    8:15 AM PT

    A vehicle has entered the site from the driveway on the left side of the frame.

  16. Construction camera frame at 8:00 AM PT. No visible change between these frames.
    8:00 AM PT

    No visible change between these frames.

  17. Construction camera frame at 7:45 AM PT. The red artifact obscuring the view in the earlier frame is gone, revealing activity across the site. A small orange vehicle has moved from the lower-right to the center of the block.
    7:45 AM PT

    The red artifact obscuring the view in the earlier frame is gone, revealing activity across the site. A small orange vehicle has moved from the lower-right to the center of the block.

  18. Construction camera frame at 7:30 AM PT. The view is heavily obscured by a red artifact in the current frame, making comparison difficult.
    7:30 AM PT

    The view is heavily obscured by a red artifact in the current frame, making comparison difficult.

  19. 2 similar no-change frames7:00 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. No visible change between these frames.
      7:15 AM PT

      No visible change between these frames.

    2. Construction camera frame at 7:00 AM PT. No visible change between these frames.
      7:00 AM PT

      No visible change between these frames.

  20. Construction camera frame at 6:45 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:45 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  21. Construction camera frame at 6:30 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:30 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  22. 7 low-visibility frames12:00 AM–6:00 AM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 6:00 AM PT. Visibility is too low to assess construction activity.
      6:00 AM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 5:00 AM PT. Visibility is too low to assess construction activity.
      5:00 AM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 4:00 AM PT. Visibility is too low to assess construction activity.
      4:00 AM PT

      Visibility is too low to assess construction activity.

    4. Construction camera frame at 3:00 AM PT. Visibility is too low to assess construction activity.
      3:00 AM PT

      Visibility is too low to assess construction activity.

    5. Construction camera frame at 2:00 AM PT. Visibility is too low to assess construction activity.
      2:00 AM PT

      Visibility is too low to assess construction activity.

    6. Construction camera frame at 1:00 AM PT. Visibility is too low to assess construction activity.
      1:00 AM PT

      Visibility is too low to assess construction activity.

    7. Construction camera frame at 12:00 AM PT. Visibility is too low to assess construction activity.
      12:00 AM PT

      Visibility is too low to assess construction activity.

← Sep 9All daysSep 11 →