Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, September 12, 2026

Construction log

Saturday, September 12, 2026

64 snapshots from the live camera.


AI digest

The site was largely quiet, with no clear ground or equipment changes visible during the day. A yellow dump truck entered through the left driveway, but no further movement was noted.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. Visibility is too low to assess construction activity.
    11:00 PM PT

    Visibility is too low to assess construction activity.

  2. 3 low-visibility frames8:00 PM–10:00 PM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 10:00 PM PT. Visibility is too low to assess construction activity.
      10:00 PM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 9:00 PM PT. Visibility is too low to assess construction activity.
      9:00 PM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 8:00 PM PT. Visibility is too low to assess construction activity.
      8:00 PM PT

      Visibility is too low to assess construction activity.

  3. Construction camera frame at 7:30 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:30 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  4. Construction camera frame at 7:15 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:15 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  5. Construction camera frame at 7:00 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:00 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  6. Construction camera frame at 6:45 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:45 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  7. Construction camera frame at 6:30 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:30 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  8. Construction camera frame at 6:15 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:15 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  9. Construction camera frame at 6:00 PM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:00 PM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  10. 13 similar no-change frames2:45 PM–5:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 PM PT. No visible change between these frames.
      5:45 PM PT

      No visible change between these frames.

    2. Construction camera frame at 5:30 PM PT. No visible change between these frames.
      5:30 PM PT

      No visible change between these frames.

    3. Construction camera frame at 5:15 PM PT. No visible change between these frames.
      5:15 PM PT

      No visible change between these frames.

    4. Construction camera frame at 5:00 PM PT. No visible change between these frames.
      5:00 PM PT

      No visible change between these frames.

    5. Construction camera frame at 4:45 PM PT. No visible change between these frames.
      4:45 PM PT

      No visible change between these frames.

    6. Construction camera frame at 4:30 PM PT. No visible change between these frames.
      4:30 PM PT

      No visible change between these frames.

    7. Construction camera frame at 4:15 PM PT. No visible change between these frames.
      4:15 PM PT

      No visible change between these frames.

    8. Construction camera frame at 4:00 PM PT. No visible change between these frames.
      4:00 PM PT

      No visible change between these frames.

    9. Construction camera frame at 3:45 PM PT. No visible change between these frames.
      3:45 PM PT

      No visible change between these frames.

    10. Construction camera frame at 3:30 PM PT. No visible change between these frames.
      3:30 PM PT

      No visible change between these frames.

    11. Construction camera frame at 3:15 PM PT. No visible change between these frames.
      3:15 PM PT

      No visible change between these frames.

    12. Construction camera frame at 3:00 PM PT. No visible change between these frames.
      3:00 PM PT

      No visible change between these frames.

    13. Construction camera frame at 2:45 PM PT. No visible change between these frames.
      2:45 PM PT

      No visible change between these frames.

  11. Construction camera frame at 2:30 PM PT. A yellow dump truck has entered the site via the driveway on the left side of the frame.
    2:30 PM PT

    A yellow dump truck has entered the site via the driveway on the left side of the frame.

  12. 26 similar no-change frames8:00 AM–2:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:15 PM PT. No visible change between these frames.
      2:15 PM PT

      No visible change between these frames.

    2. Construction camera frame at 2:00 PM PT. No visible change between these frames.
      2:00 PM PT

      No visible change between these frames.

    3. Construction camera frame at 1:45 PM PT. No visible change between these frames.
      1:45 PM PT

      No visible change between these frames.

    4. Construction camera frame at 1:30 PM PT. No visible change between these frames.
      1:30 PM PT

      No visible change between these frames.

    5. Construction camera frame at 1:15 PM PT. No visible change between these frames.
      1:15 PM PT

      No visible change between these frames.

    6. Construction camera frame at 1:00 PM PT. No visible change between these frames.
      1:00 PM PT

      No visible change between these frames.

    7. Construction camera frame at 12:45 PM PT. No visible change between these frames.
      12:45 PM PT

      No visible change between these frames.

    8. Construction camera frame at 12:30 PM PT. No visible change between these frames.
      12:30 PM PT

      No visible change between these frames.

    9. Construction camera frame at 12:15 PM PT. No visible change between these frames.
      12:15 PM PT

      No visible change between these frames.

    10. Construction camera frame at 12:00 PM PT. No visible change between these frames.
      12:00 PM PT

      No visible change between these frames.

    11. Construction camera frame at 11:45 AM PT. No visible change between these frames.
      11:45 AM PT

      No visible change between these frames.

    12. Construction camera frame at 11:30 AM PT. No visible change between these frames.
      11:30 AM PT

      No visible change between these frames.

    13. Construction camera frame at 11:15 AM PT. No visible change between these frames.
      11:15 AM PT

      No visible change between these frames.

    14. Construction camera frame at 11:00 AM PT. No visible change between these frames.
      11:00 AM PT

      No visible change between these frames.

    15. Construction camera frame at 10:45 AM PT. No visible change between these frames.
      10:45 AM PT

      No visible change between these frames.

    16. Construction camera frame at 10:30 AM PT. No visible change between these frames.
      10:30 AM PT

      No visible change between these frames.

    17. Construction camera frame at 10:15 AM PT. No visible change between these frames.
      10:15 AM PT

      No visible change between these frames.

    18. Construction camera frame at 10:00 AM PT. No visible change between these frames.
      10:00 AM PT

      No visible change between these frames.

    19. Construction camera frame at 9:45 AM PT. No visible change between these frames.
      9:45 AM PT

      No visible change between these frames.

    20. Construction camera frame at 9:30 AM PT. No visible change between these frames.
      9:30 AM PT

      No visible change between these frames.

    21. Construction camera frame at 9:15 AM PT. No visible change between these frames.
      9:15 AM PT

      No visible change between these frames.

    22. Construction camera frame at 9:00 AM PT. No visible change between these frames.
      9:00 AM PT

      No visible change between these frames.

    23. Construction camera frame at 8:45 AM PT. No visible change between these frames.
      8:45 AM PT

      No visible change between these frames.

    24. Construction camera frame at 8:30 AM PT. No visible change between these frames.
      8:30 AM PT

      No visible change between these frames.

    25. Construction camera frame at 8:15 AM PT. No visible change between these frames.
      8:15 AM PT

      No visible change between these frames.

    26. Construction camera frame at 8:00 AM PT. No visible change between these frames.
      8:00 AM PT

      No visible change between these frames.

  13. Construction camera frame at 7:45 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:45 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  14. Construction camera frame at 7:30 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:30 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  15. Construction camera frame at 7:15 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:15 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  16. Construction camera frame at 7:00 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    7:00 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  17. Construction camera frame at 6:45 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:45 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  18. Construction camera frame at 6:30 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:30 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  19. 7 low-visibility frames12:00 AM–6:00 AM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 6:00 AM PT. Visibility is too low to assess construction activity.
      6:00 AM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 5:00 AM PT. Visibility is too low to assess construction activity.
      5:00 AM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 4:00 AM PT. Visibility is too low to assess construction activity.
      4:00 AM PT

      Visibility is too low to assess construction activity.

    4. Construction camera frame at 3:00 AM PT. Visibility is too low to assess construction activity.
      3:00 AM PT

      Visibility is too low to assess construction activity.

    5. Construction camera frame at 2:00 AM PT. Visibility is too low to assess construction activity.
      2:00 AM PT

      Visibility is too low to assess construction activity.

    6. Construction camera frame at 1:00 AM PT. Visibility is too low to assess construction activity.
      1:00 AM PT

      Visibility is too low to assess construction activity.

    7. Construction camera frame at 12:00 AM PT. Visibility is too low to assess construction activity.
      12:00 AM PT

      Visibility is too low to assess construction activity.

← Sep 11All daysSep 13 →