Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, November 3, 2026

Construction log

Tuesday, November 3, 2026

16 snapshots from the live camera.


AI digest

Quiet day on the Onni 606 site: the central drill rig, parked machines and earth layout look largely unchanged from the October 27 reference, with only minor repositioning of the excavators at the top and bottom-center edges and a blue crane and yellow machines shifting near the perimeter. No large volume of earth moved and no clear trucks entering or leaving through the driveway.

▶ Play this day as a timelapse
  1. Construction camera frame at 8:45 AM PT. Small changes at the edges: a yellow machine on the right service road near the middle-right has moved in, and an orange vehicle appeared at the left-center of the block. The central drill rig and parked machines look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.
    8:45 AM PT

    Small changes at the edges: a yellow machine on the right service road near the middle-right has moved in, and an orange vehicle appeared at the left-center of the block. The central drill rig and parked machines look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.

  2. Construction camera frame at 8:30 AM PT. Small changes at the edges: a worker in orange is visible near the bottom-right corner of the block, and the yellow excavator on the left edge is no longer in the same position. The central drill rig and parked machines along the right look unchanged. No trucks clearly entering or leaving through the driveway or service road.
    8:30 AM PT

    Small changes at the edges: a worker in orange is visible near the bottom-right corner of the block, and the yellow excavator on the left edge is no longer in the same position. The central drill rig and parked machines along the right look unchanged. No trucks clearly entering or leaving through the driveway or service road.

  3. Construction camera frame at 8:15 AM PT. Small changes at the edges: a yellow excavator at the top-center appears to have shifted position, and a small vehicle is visible near the top-right service road. The central drill rig and parked machines look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.
    8:15 AM PT

    Small changes at the edges: a yellow excavator at the top-center appears to have shifted position, and a small vehicle is visible near the top-right service road. The central drill rig and parked machines look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.

  4. Construction camera frame at 8:00 AM PT. Small changes at the edges: a yellow excavator at the top-center has shifted its position and the excavator near bottom center appears to have rotated slightly. The central drill rig and the parked machines along the right side look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.
    8:00 AM PT

    Small changes at the edges: a yellow excavator at the top-center has shifted its position and the excavator near bottom center appears to have rotated slightly. The central drill rig and the parked machines along the right side look otherwise unchanged. No trucks clearly entering or leaving through the driveway or service road.

  5. Construction camera frame at 7:45 AM PT. Small changes at the edges: a worker appears near the lower-left of the central drill area and a small vehicle is visible on the top-right service road, while the large drill rig, excavator at bottom center, and parked machines along the right look otherwise unchanged. No clear truck entering or leaving through the driveway or service road.
    7:45 AM PT

    Small changes at the edges: a worker appears near the lower-left of the central drill area and a small vehicle is visible on the top-right service road, while the large drill rig, excavator at bottom center, and parked machines along the right look otherwise unchanged. No clear truck entering or leaving through the driveway or service road.

  6. Construction camera frame at 7:30 AM PT. Small changes at the edges: the excavator near bottom center has swung its boom to a new angle, and a yellow machine at the top edge looks shifted. The central drill rig and the machines along the right side appear largely unchanged. No vehicles clearly entering or leaving through the driveway or service road.
    7:30 AM PT

    Small changes at the edges: the excavator near bottom center has swung its boom to a new angle, and a yellow machine at the top edge looks shifted. The central drill rig and the machines along the right side appear largely unchanged. No vehicles clearly entering or leaving through the driveway or service road.

  7. Construction camera frame at 7:15 AM PT. Compared with the earlier frame, the excavator near the bottom center has swung its boom to a new angle, and a yellow machine at the top edge appears to have shifted position. The drill rig in the center and the trucks along the right service road look largely unchanged.
    7:15 AM PT

    Compared with the earlier frame, the excavator near the bottom center has swung its boom to a new angle, and a yellow machine at the top edge appears to have shifted position. The drill rig in the center and the trucks along the right service road look largely unchanged.

  8. Construction camera frame at 7:00 AM PT. Lighting is cooler and brighter than the earlier frame, but the site layout is the same. The drill rig and equipment in the center, the excavator near the bottom center, and the parked machines along the edges all appear in the same positions. A truck is visible on the left street at the lower-left edge, and a vehicle sits near the right-side service road, but no clear movement of machines or trucks between frames can be confirmed.
    7:00 AM PT

    Lighting is cooler and brighter than the earlier frame, but the site layout is the same. The drill rig and equipment in the center, the excavator near the bottom center, and the parked machines along the edges all appear in the same positions. A truck is visible on the left street at the lower-left edge, and a vehicle sits near the right-side service road, but no clear movement of machines or trucks between frames can be confirmed.

  9. Construction camera frame at 6:45 AM PT. Frame saved. Automated comparison was skipped; activity has not been assessed.
    6:45 AM PT

    Frame saved. Automated comparison was skipped; activity has not been assessed.

  10. 7 low-visibility frames12:00 AM–6:00 AM PT

    The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

    1. Construction camera frame at 6:00 AM PT. Visibility is too low to assess construction activity.
      6:00 AM PT

      Visibility is too low to assess construction activity.

    2. Construction camera frame at 5:00 AM PT. Visibility is too low to assess construction activity.
      5:00 AM PT

      Visibility is too low to assess construction activity.

    3. Construction camera frame at 4:00 AM PT. Visibility is too low to assess construction activity.
      4:00 AM PT

      Visibility is too low to assess construction activity.

    4. Construction camera frame at 3:00 AM PT. Visibility is too low to assess construction activity.
      3:00 AM PT

      Visibility is too low to assess construction activity.

    5. Construction camera frame at 2:00 AM PT. Visibility is too low to assess construction activity.
      2:00 AM PT

      Visibility is too low to assess construction activity.

    6. Construction camera frame at 1:00 AM PT. Visibility is too low to assess construction activity.
      1:00 AM PT

      Visibility is too low to assess construction activity.

    7. Construction camera frame at 12:00 AM PT. Visibility is too low to assess construction activity.
      12:00 AM PT

      Visibility is too low to assess construction activity.

← Nov 2All days