Onni 606 · April 29, 2026

Coverage frames Onni 606 as one of Washington's biggest projects

An April profile lays out the full program — homes, hotel, office, pools and a public plaza — and bills the development as the largest construction project in the state.


An April 2026 profile of Onni 606 laid out the development's full program in one place: three roughly 600-foot towers on a shared podium at 606 106th Avenue NE, with about 1,300 residences, roughly 317 hotel suites, some 896,000 square feet of office, two pools, a daycare and a roughly 15,000-square-foot public plaza. The coverage billed it as the largest construction project in Washington State — a superlative worth attributing to the reporting rather than stating as settled fact.

The three towers all reach roughly 600 feet, Bellevue's effective downtown height ceiling, so they differ by footprint and program rather than height. Tower 1 is the mixed hotel-and-residential tower (53 stories); Tower 2 is an all-residential point tower (54 stories, about 634 homes, with a pool and sky lounge crowning it); Tower 3 is the office tower (45 stories, wide floorplates, with a daycare in the podium).

The program has shifted over the approvals. An approved 2025 update (24-113252-LJ) trimmed below-grade parking from 2,479 stalls across seven levels to 1,712 across five, roughly doubled indoor bike storage to about 532 spaces, and relocated the central energy plant to Tower 1.

On the ground, none of this is built yet. As of mid-2026 the block has been cleared and the superstructure permits are pending. The profile is a useful snapshot of the intended project; the permit record is the measure of how much of it is actually cleared to rise.

Independent and unaffiliated with Onni Group. Written from the public City of Bellevue record; corrections via the contact form.