Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, July 3, 2026

Construction log

Friday, July 3, 2026

23 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The site was quiet today, with no visible activity or changes to the equipment or ground.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:30 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    9:15 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. The site remains stable, with no discernible alterations to the equipment layout or surface conditions.
    6:45 PM PT

    The site remains stable, with no discernible alterations to the equipment layout or surface conditions.

  15. The equipment on site is holding its positions, with no visible movement in the last quarter hour.
    6:30 PM PT

    The equipment on site is holding its positions, with no visible movement in the last quarter hour.

  16. The site shows no discernible difference, with the equipment remaining stationary over the last fifteen minutes.
    6:15 PM PT

    The site shows no discernible difference, with the equipment remaining stationary over the last fifteen minutes.

  17. The site maintains its quiet state, with the equipment remaining in the same locations.
    6:00 PM PT

    The site maintains its quiet state, with the equipment remaining in the same locations.

  18. The site holds a familiar appearance, with no noticeable changes in equipment positioning or debris levels.
    5:45 PM PT

    The site holds a familiar appearance, with no noticeable changes in equipment positioning or debris levels.

  19. The site presents a consistent view, with no apparent shifts in equipment or debris placement.
    5:30 PM PT

    The site presents a consistent view, with no apparent shifts in equipment or debris placement.

  20. The scene appears largely unchanged, with equipment remaining in the same positions as before.
    5:15 PM PT

    The scene appears largely unchanged, with equipment remaining in the same positions as before.

  21. The demolition site remains steady, with the excavator continuing to work in the same area of the rubble.
    5:00 PM PT

    The demolition site remains steady, with the excavator continuing to work in the same area of the rubble.

  22. No construction activity — the site is quiet.
    4:45 PM PT

    No construction activity — the site is quiet.

  23. No construction activity — the site is quiet.
    4:42 PM PT

    No construction activity — the site is quiet.

← Jul 2All daysJul 4 →