606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, July 2, 2026

Construction log

Thursday, July 2, 2026

51 snapshots from the live camera.


AI digest

An excavator worked on a rubble pile throughout the day, joined by a flatbed truck and a small loader, but the overall site configuration remained largely consistent.

▶ Play this day as a timelapse
  1. Construction camera frame at 4:15 PM PT. No new activity is visible across the site or in the staging area.
    4:15 PM PT

    No new activity is visible across the site or in the staging area.

  2. Construction camera frame at 4:00 PM PT. There is minimal visible difference between these two views of the demolition site.
    4:00 PM PT

    There is minimal visible difference between these two views of the demolition site.

  3. Construction camera frame at 3:45 PM PT. The excavator is now positioned slightly further back from the center of the rubble pile, appearing to be digging at a new angle.
    3:45 PM PT

    The excavator is now positioned slightly further back from the center of the rubble pile, appearing to be digging at a new angle.

  4. Construction camera frame at 3:30 PM PT. The site appears largely unchanged, with the excavator still working within the rubble and no new vehicles arriving.
    3:30 PM PT

    The site appears largely unchanged, with the excavator still working within the rubble and no new vehicles arriving.

  5. Construction camera frame at 3:15 PM PT. The scene is quiet, with no apparent changes in machinery positions or the size of the rubble pile.
    3:15 PM PT

    The scene is quiet, with no apparent changes in machinery positions or the size of the rubble pile.

  6. Construction camera frame at 3:00 PM PT. The scene is holding steady, with the excavator continuing to work within the central rubble pile without apparent repositioning.
    3:00 PM PT

    The scene is holding steady, with the excavator continuing to work within the central rubble pile without apparent repositioning.

  7. Construction camera frame at 2:45 PM PT. The rubble pile appears slightly larger, with the excavator now focused on a different section of the debris.
    2:45 PM PT

    The rubble pile appears slightly larger, with the excavator now focused on a different section of the debris.

  8. Construction camera frame at 2:30 PM PT. The demolition site remains remarkably consistent, showing no significant movement of machinery or noticeable change to the rubble.
    2:30 PM PT

    The demolition site remains remarkably consistent, showing no significant movement of machinery or noticeable change to the rubble.

  9. Construction camera frame at 2:15 PM PT. The excavator’s position within the rubble pile has subtly shifted again, now angling slightly towards the center.
    2:15 PM PT

    The excavator’s position within the rubble pile has subtly shifted again, now angling slightly towards the center.

  10. 2 similar no-change frames1:45 PM–2:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:00 PM PT. The overall scene presents a static view, with the excavator maintaining its position and activity within the rubble.
      2:00 PM PT

      The overall scene presents a static view, with the excavator maintaining its position and activity within the rubble.

    2. Construction camera frame at 1:45 PM PT. The site appears largely unchanged, with the excavator continuing its work in the same area of the rubble pile.
      1:45 PM PT

      The site appears largely unchanged, with the excavator continuing its work in the same area of the rubble pile.

  11. Construction camera frame at 1:30 PM PT. The excavator has moved again, now working further to the right side of the rubble pile.
    1:30 PM PT

    The excavator has moved again, now working further to the right side of the rubble pile.

  12. Construction camera frame at 1:15 PM PT. The excavator is now positioned slightly differently within the rubble, having shifted to the left.
    1:15 PM PT

    The excavator is now positioned slightly differently within the rubble, having shifted to the left.

  13. Construction camera frame at 1:00 PM PT. The scene is holding steady, with no clear alterations to the equipment positions or the debris field.
    1:00 PM PT

    The scene is holding steady, with no clear alterations to the equipment positions or the debris field.

  14. Construction camera frame at 12:45 PM PT. The view remains remarkably consistent, with only minor adjustments to the rubble arrangement around the excavator.
    12:45 PM PT

    The view remains remarkably consistent, with only minor adjustments to the rubble arrangement around the excavator.

  15. Construction camera frame at 12:30 PM PT. The rubble pile has visibly grown, with the excavator continuing to work within it.
    12:30 PM PT

    The rubble pile has visibly grown, with the excavator continuing to work within it.

  16. Construction camera frame at 12:15 PM PT. The demolition site continues at a steady pace, though no large-scale alterations are immediately apparent.
    12:15 PM PT

    The demolition site continues at a steady pace, though no large-scale alterations are immediately apparent.

  17. 3 similar no-change frames11:30 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site looks largely unchanged, though the excavator appears to have shifted slightly within the rubble pile.
      12:00 PM PT

      The site looks largely unchanged, though the excavator appears to have shifted slightly within the rubble pile.

    2. Construction camera frame at 11:45 AM PT. The scene presents a stable view, with no apparent movement of machinery or substantial changes to the debris.
      11:45 AM PT

      The scene presents a stable view, with no apparent movement of machinery or substantial changes to the debris.

    3. Construction camera frame at 11:30 AM PT. The site appears quiet, with no discernible shifts in the positions of machinery or the debris pile.
      11:30 AM PT

      The site appears quiet, with no discernible shifts in the positions of machinery or the debris pile.

  18. Construction camera frame at 11:15 AM PT. The demolition site shows little to no variation from the previous view.
    11:15 AM PT

    The demolition site shows little to no variation from the previous view.

  19. Construction camera frame at 11:00 AM PT. The overall scene remains remarkably static, with no significant alterations to the equipment or debris field visible.
    11:00 AM PT

    The overall scene remains remarkably static, with no significant alterations to the equipment or debris field visible.

  20. Construction camera frame at 10:45 AM PT. The site maintains a consistent appearance, with no obvious adjustments to the layout of equipment or the rubble accumulation.
    10:45 AM PT

    The site maintains a consistent appearance, with no obvious adjustments to the layout of equipment or the rubble accumulation.

  21. 2 similar no-change frames10:15 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. Everything on site appears to be holding its position, with no noticeable changes in the last fifteen minutes.
      10:30 AM PT

      Everything on site appears to be holding its position, with no noticeable changes in the last fifteen minutes.

    2. Construction camera frame at 10:15 AM PT. The demolition site remains largely unchanged, with equipment and debris in similar positions as before.
      10:15 AM PT

      The demolition site remains largely unchanged, with equipment and debris in similar positions as before.

  22. Construction camera frame at 10:00 AM PT. The scene presents a similar view, with no immediately visible alterations to the equipment or debris arrangement.
    10:00 AM PT

    The scene presents a similar view, with no immediately visible alterations to the equipment or debris arrangement.

  23. Construction camera frame at 9:45 AM PT. The site appears stable, with no readily apparent shifts in the position of machinery or the size of the debris pile.
    9:45 AM PT

    The site appears stable, with no readily apparent shifts in the position of machinery or the size of the debris pile.

  24. Construction camera frame at 9:30 AM PT. A small loader has moved into position near the excavator, appearing to assist with material handling in the center of the site.
    9:30 AM PT

    A small loader has moved into position near the excavator, appearing to assist with material handling in the center of the site.

  25. 4 similar no-change frames8:30 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. The demolition site continues at a similar pace, with no significant alterations to equipment positions or the debris field.
      9:15 AM PT

      The demolition site continues at a similar pace, with no significant alterations to equipment positions or the debris field.

    2. Construction camera frame at 9:00 AM PT. The scene is holding a consistent state, with no observable changes in the equipment or debris arrangement.
      9:00 AM PT

      The scene is holding a consistent state, with no observable changes in the equipment or debris arrangement.

    3. Construction camera frame at 8:45 AM PT. The site’s configuration appears consistent, with no noticeable shifts in equipment placement or debris levels.
      8:45 AM PT

      The site’s configuration appears consistent, with no noticeable shifts in equipment placement or debris levels.

    4. Construction camera frame at 8:30 AM PT. The site remains largely unchanged, with the excavator continuing to work at roughly the same spot in the rubble.
      8:30 AM PT

      The site remains largely unchanged, with the excavator continuing to work at roughly the same spot in the rubble.

  26. Construction camera frame at 8:15 AM PT. Activity on site is holding steady, with the excavator continuing to process material in the center of the lot.
    8:15 AM PT

    Activity on site is holding steady, with the excavator continuing to process material in the center of the lot.

  27. Construction camera frame at 8:00 AM PT. The scene shows minimal variation, with the excavator maintaining its position and activity level within the debris field.
    8:00 AM PT

    The scene shows minimal variation, with the excavator maintaining its position and activity level within the debris field.

  28. Construction camera frame at 7:45 AM PT. The scene presents a familiar picture, with little apparent shift in the arrangement of equipment or the state of the rubble.
    7:45 AM PT

    The scene presents a familiar picture, with little apparent shift in the arrangement of equipment or the state of the rubble.

  29. Construction camera frame at 7:30 AM PT. The demolition site appears stable, with no significant alterations to equipment positions or the debris field over the last quarter hour.
    7:30 AM PT

    The demolition site appears stable, with no significant alterations to equipment positions or the debris field over the last quarter hour.

  30. Construction camera frame at 7:15 AM PT. The excavator has noticeably reduced the size of the rubble pile in the center of the lot.
    7:15 AM PT

    The excavator has noticeably reduced the size of the rubble pile in the center of the lot.

  31. Construction camera frame at 7:00 AM PT. The excavator has shifted position slightly, now working on a different section of the rubble pile.
    7:00 AM PT

    The excavator has shifted position slightly, now working on a different section of the rubble pile.

  32. Construction camera frame at 6:45 AM PT. The site remains largely unchanged, with the excavator continuing its work in the central debris pile.
    6:45 AM PT

    The site remains largely unchanged, with the excavator continuing its work in the central debris pile.

  33. Construction camera frame at 6:30 AM PT. A flatbed truck has entered the site via the left driveway and is now stopped in the center of the lot near the excavator.
    6:30 AM PT

    A flatbed truck has entered the site via the left driveway and is now stopped in the center of the lot near the excavator.

  34. Construction camera frame at 6:15 AM PT. The scene holds steady, with equipment and debris appearing in the same positions as fifteen minutes ago.
    6:15 AM PT

    The scene holds steady, with equipment and debris appearing in the same positions as fifteen minutes ago.

  35. Construction camera frame at 6:00 AM PT. It doesn’t appear much has altered at the Onni 606 site in the last fifteen minutes.
    6:00 AM PT

    It doesn’t appear much has altered at the Onni 606 site in the last fifteen minutes.

  36. Construction camera frame at 5:45 AM PT. The demolition site shows very little in the way of progression during the last fifteen minutes.
    5:45 AM PT

    The demolition site shows very little in the way of progression during the last fifteen minutes.

  37. Construction camera frame at 5:30 AM PT. The scene appears stable, with no obvious shifts in equipment positioning or debris removal over the last quarter hour.
    5:30 AM PT

    The scene appears stable, with no obvious shifts in equipment positioning or debris removal over the last quarter hour.

  38. Construction camera frame at 5:15 AM PT. The excavator continues to work in the center of the rubble, but otherwise the scene remains remarkably consistent.
    5:15 AM PT

    The excavator continues to work in the center of the rubble, but otherwise the scene remains remarkably consistent.

  39. Construction camera frame at 5:00 AM PT. The site is now illuminated, revealing an excavator working within the growing rubble pile. Daylight has fully arrived, and the staging area in the upper-left appears unchanged from a few minutes ago.
    5:00 AM PT

    The site is now illuminated, revealing an excavator working within the growing rubble pile. Daylight has fully arrived, and the staging area in the upper-left appears unchanged from a few minutes ago.

  40. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 1All daysJul 3 →