Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, July 11, 2026

Construction log

Saturday, July 11, 2026

74 snapshots from the live camera.


AI digest

The site was quiet overall, with equipment largely stationary; a few small vehicles entered and machinery shifted slightly during the day. Compared with July 4, the central equipment cluster is larger, and a lift is visible, but the ground layout appears otherwise unchanged.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 20 similar no-change frames5:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. No construction activity — the site is quiet.
      9:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 6:15 PM PT. No construction activity — the site is quiet.
      6:15 PM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 5:45 PM PT. The scene presents a consistent view, with equipment remaining in the same locations as fifteen minutes prior.
      5:45 PM PT

      The scene presents a consistent view, with equipment remaining in the same locations as fifteen minutes prior.

    18. Construction camera frame at 5:30 PM PT. The equipment arrangement on the pad appears static, showing no alterations in position during the last fifteen minutes.
      5:30 PM PT

      The equipment arrangement on the pad appears static, showing no alterations in position during the last fifteen minutes.

    19. Construction camera frame at 5:15 PM PT. NoCLNo activity is visible across the site, with all equipment staying put between frames.
      5:15 PM PT

      NoCLNo activity is visible across the site, with all equipment staying put between frames.

    20. Construction camera frame at 5:00 PM PT. A lift of some kind is now visible near the center of the site, though it wasn't present in the previous view. Otherwise, the arrangement of the larger equipment on the pad remains unchanged.
      5:00 PM PT

      A lift of some kind is now visible near the center of the site, though it wasn't present in the previous view. Otherwise, the arrangement of the larger equipment on the pad remains unchanged.

  3. Construction camera frame at 4:45 PM PT. The equipment on the pad maintains its previous arrangement, with no discernible repositioning in the last quarter hour.
    4:45 PM PT

    The equipment on the pad maintains its previous arrangement, with no discernible repositioning in the last quarter hour.

  4. Construction camera frame at 4:30 PM PT. The site remains quiet, with no visible shifts in equipment positioning over the last fifteen minutes.
    4:30 PM PT

    The site remains quiet, with no visible shifts in equipment positioning over the last fifteen minutes.

  5. Construction camera frame at 4:15 PM PT. A small yellow vehicle is now visible near the right edge of the frame, having entered the site from the service road. Otherwise, the construction pad and equipment positions appear as they were fifteen minutes ago.
    4:15 PM PT

    A small yellow vehicle is now visible near the right edge of the frame, having entered the site from the service road. Otherwise, the construction pad and equipment positions appear as they were fifteen minutes ago.

  6. 4 similar no-change frames3:15 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The scene presents a steady view, with all equipment remaining in the same positions as observed previously.
      4:00 PM PT

      The scene presents a steady view, with all equipment remaining in the same positions as observed previously.

    2. Construction camera frame at 3:45 PM PT. The equipment arrangement on the pad appears consistent between the two views, showing no discernible movement.
      3:45 PM PT

      The equipment arrangement on the pad appears consistent between the two views, showing no discernible movement.

    3. Construction camera frame at 3:30 PM PT. No activity is visible across the site, and the equipment remains stationary.
      3:30 PM PT

      No activity is visible across the site, and the equipment remains stationary.

    4. Construction camera frame at 3:15 PM PT. The scene appears largely unchanged, with the equipment remaining in the same general locations as fifteen minutes ago.
      3:15 PM PT

      The scene appears largely unchanged, with the equipment remaining in the same general locations as fifteen minutes ago.

  7. Construction camera frame at 3:00 PM PT. A dark-colored vehicle has pulled onto the site from the driveway on the left, near the edge of the frame. The rest of the equipment and the overall scene appear to be in the same arrangement as before.
    3:00 PM PT

    A dark-colored vehicle has pulled onto the site from the driveway on the left, near the edge of the frame. The rest of the equipment and the overall scene appear to be in the same arrangement as before.

  8. Construction camera frame at 2:45 PM PT. The site remains quiet, with the equipment holding its positions and no apparent changes in the last fifteen minutes.
    2:45 PM PT

    The site remains quiet, with the equipment holding its positions and no apparent changes in the last fifteen minutes.

  9. Construction camera frame at 2:30 PM PT. The excavator near the center of the frame has shifted slightly to the right. Otherwise, the site maintains a quiet appearance with the equipment in largely the same positions.
    2:30 PM PT

    The excavator near the center of the frame has shifted slightly to the right. Otherwise, the site maintains a quiet appearance with the equipment in largely the same positions.

  10. Construction camera frame at 2:15 PM PT. The view from the camera is stable, with no discernible changes to the equipment or site layout over the last fifteen minutes.
    2:15 PM PT

    The view from the camera is stable, with no discernible changes to the equipment or site layout over the last fifteen minutes.

  11. Construction camera frame at 2:00 PM PT. The equipment arrangement on the site appears consistent, showing no clear movement or alterations in the last fifteen minutes.
    2:00 PM PT

    The equipment arrangement on the site appears consistent, showing no clear movement or alterations in the last fifteen minutes.

  12. Construction camera frame at 1:45 PM PT. A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and overall scene remain as they were.
    1:45 PM PT

    A white pickup truck has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and overall scene remain as they were.

  13. Construction camera frame at 1:30 PM PT. The scene remains largely unchanged, with the machinery holding its positions on the cleared site.
    1:30 PM PT

    The scene remains largely unchanged, with the machinery holding its positions on the cleared site.

  14. Construction camera frame at 1:15 PM PT. The site's appearance has not shifted in the last quarter hour, and the machinery remains in the same arrangement.
    1:15 PM PT

    The site's appearance has not shifted in the last quarter hour, and the machinery remains in the same arrangement.

  15. Construction camera frame at 1:00 PM PT. The site continues to show no alterations, with the equipment remaining in the same positions as previously observed.
    1:00 PM PT

    The site continues to show no alterations, with the equipment remaining in the same positions as previously observed.

  16. Construction camera frame at 12:45 PM PT. The site presents a nearly identical view, with no noticeable adjustments to equipment positioning or visible activity.
    12:45 PM PT

    The site presents a nearly identical view, with no noticeable adjustments to equipment positioning or visible activity.

  17. 8 similar no-change frames10:45 AM–12:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:30 PM PT. The site’s layout appears static, with no visible shifts in equipment or activity during the interval.
      12:30 PM PT

      The site’s layout appears static, with no visible shifts in equipment or activity during the interval.

    2. Construction camera frame at 12:15 PM PT. The overall scene is holding steady, with the equipment remaining in the same locations as before.
      12:15 PM PT

      The overall scene is holding steady, with the equipment remaining in the same locations as before.

    3. Construction camera frame at 12:00 PM PT. The site’s appearance is remarkably similar to the last check-in, with all equipment remaining in the same positions.
      12:00 PM PT

      The site’s appearance is remarkably similar to the last check-in, with all equipment remaining in the same positions.

    4. Construction camera frame at 11:45 AM PT. The scene remains stable, with no discernible changes to the equipment or site layout over the past fifteen minutes.
      11:45 AM PT

      The scene remains stable, with no discernible changes to the equipment or site layout over the past fifteen minutes.

    5. Construction camera frame at 11:30 AM PT. The site's arrangement of machinery is consistent, displaying no movement or alterations in the last fifteen minutes.
      11:30 AM PT

      The site's arrangement of machinery is consistent, displaying no movement or alterations in the last fifteen minutes.

    6. Construction camera frame at 11:15 AM PT. The site remains largely unchanged, with the equipment cluster holding its prior arrangement.
      11:15 AM PT

      The site remains largely unchanged, with the equipment cluster holding its prior arrangement.

    7. Construction camera frame at 11:00 AM PT. The site presents a consistent view, with no changes detected in equipment positioning or general activity.
      11:00 AM PT

      The site presents a consistent view, with no changes detected in equipment positioning or general activity.

    8. Construction camera frame at 10:45 AM PT. No alterations are visible in the equipment layout or surrounding site conditions during the last fifteen minutes.
      10:45 AM PT

      No alterations are visible in the equipment layout or surrounding site conditions during the last fifteen minutes.

  18. Construction camera frame at 10:30 AM PT. The equipment on the site appears to be stationary, maintaining the same arrangement as before.
    10:30 AM PT

    The equipment on the site appears to be stationary, maintaining the same arrangement as before.

  19. 3 similar no-change frames9:45 AM–10:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:15 AM PT. The equipment grouping remains in the same locations, with no apparent shifts in position over the last fifteen minutes.
      10:15 AM PT

      The equipment grouping remains in the same locations, with no apparent shifts in position over the last fifteen minutes.

    2. Construction camera frame at 10:00 AM PT. The scene shows a stable arrangement of equipment, with no discernible alterations over the past fifteen minutes.
      10:00 AM PT

      The scene shows a stable arrangement of equipment, with no discernible alterations over the past fifteen minutes.

    3. Construction camera frame at 9:45 AM PT. The machinery on site maintains its positions, displaying no noticeable movement in the last quarter hour.
      9:45 AM PT

      The machinery on site maintains its positions, displaying no noticeable movement in the last quarter hour.

  20. Construction camera frame at 9:30 AM PT. Equipment appears to be holding its current arrangement across the site.
    9:30 AM PT

    Equipment appears to be holding its current arrangement across the site.

  21. Construction camera frame at 9:15 AM PT. The site remains largely unchanged, with equipment holding its positions on the flat pad.
    9:15 AM PT

    The site remains largely unchanged, with equipment holding its positions on the flat pad.

  22. Construction camera frame at 9:00 AM PT. A dozer has shifted its position slightly on the dirt pad, moving further toward the center of the site.
    9:00 AM PT

    A dozer has shifted its position slightly on the dirt pad, moving further toward the center of the site.

  23. Construction camera frame at 8:45 AM PT. The site holds a consistent appearance, with no clear shifts in the positioning of equipment or materials.
    8:45 AM PT

    The site holds a consistent appearance, with no clear shifts in the positioning of equipment or materials.

  24. 11 similar no-change frames6:00 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. The site presents a steady view, with no observable alterations in equipment or activity.
      8:30 AM PT

      The site presents a steady view, with no observable alterations in equipment or activity.

    2. Construction camera frame at 8:15 AM PT. The site’s appearance is remarkably similar to a few minutes ago, with no discernible changes in equipment placement.
      8:15 AM PT

      The site’s appearance is remarkably similar to a few minutes ago, with no discernible changes in equipment placement.

    3. Construction camera frame at 8:00 AM PT. The scene is stable, with the heavy equipment remaining in the same locations as observed previously.
      8:00 AM PT

      The scene is stable, with the heavy equipment remaining in the same locations as observed previously.

    4. Construction camera frame at 7:45 AM PT. The equipment positions appear consistent, with no noticeable movement on the pad.
      7:45 AM PT

      The equipment positions appear consistent, with no noticeable movement on the pad.

    5. Construction camera frame at 7:30 AM PT. Nothing has moved, and the site remains quiet.
      7:30 AM PT

      Nothing has moved, and the site remains quiet.

    6. Construction camera frame at 7:15 AM PT. The site remains largely unchanged, with the machinery maintaining its current positions.
      7:15 AM PT

      The site remains largely unchanged, with the machinery maintaining its current positions.

    7. Construction camera frame at 7:00 AM PT. The equipment arrangement appears static, with no immediate shifts in position visible across the site.
      7:00 AM PT

      The equipment arrangement appears static, with no immediate shifts in position visible across the site.

    8. Construction camera frame at 6:45 AM PT. The site presents a consistent view, with equipment remaining in the same positions as a few minutes ago.
      6:45 AM PT

      The site presents a consistent view, with equipment remaining in the same positions as a few minutes ago.

    9. Construction camera frame at 6:30 AM PT. The site is holding steady, with the equipment appearing in the same positions as before.
      6:30 AM PT

      The site is holding steady, with the equipment appearing in the same positions as before.

    10. Construction camera frame at 6:15 AM PT. The scene appears stable, with no discernible changes to equipment positioning or vehicle traffic.
      6:15 AM PT

      The scene appears stable, with no discernible changes to equipment positioning or vehicle traffic.

    11. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

  25. Construction camera frame at 5:45 AM PT. The equipment cluster in the center of the site has shifted slightly, with the excavator now facing a different direction.
    5:45 AM PT

    The equipment cluster in the center of the site has shifted slightly, with the excavator now facing a different direction.

  26. Construction camera frame at 5:30 AM PT. The site remains largely unchanged, though a small vehicle has entered from the service road on the right.
    5:30 AM PT

    The site remains largely unchanged, though a small vehicle has entered from the service road on the right.

  27. Construction camera frame at 5:15 AM PT. Visibility remains low, but the site appears quiet with only ambient city lights visible.
    5:15 AM PT

    Visibility remains low, but the site appears quiet with only ambient city lights visible.

  28. 6 similar no-change frames12:00 AM–5:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 10All daysJul 12 →