Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, July 12, 2026

Construction log

Sunday, July 12, 2026

74 snapshots from the live camera.


AI digest

A small orange traffic cone appeared near the driveway, and a dark-colored pickup truck and a white pickup truck were present on site at different times. The excavator shifted its position slightly.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 25 similar no-change frames3:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. Visibility is low, and the site appears quiet with no discernible changes in equipment positions.
      9:30 PM PT

      Visibility is low, and the site appears quiet with no discernible changes in equipment positions.

    3. Construction camera frame at 9:15 PM PT. The site remains largely unchanged, with equipment holding its positions on the flat pad.
      9:15 PM PT

      The site remains largely unchanged, with equipment holding its positions on the flat pad.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 6:15 PM PT. No construction activity — the site is quiet.
      6:15 PM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 5:45 PM PT. No construction activity — the site is quiet.
      5:45 PM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 5:30 PM PT. No construction activity — the site is quiet.
      5:30 PM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 5:15 PM PT. No construction activity — the site is quiet.
      5:15 PM PT

      No construction activity — the site is quiet.

    20. Construction camera frame at 5:00 PM PT. No construction activity — the site is quiet.
      5:00 PM PT

      No construction activity — the site is quiet.

    21. Construction camera frame at 4:45 PM PT. No construction activity — the site is quiet.
      4:45 PM PT

      No construction activity — the site is quiet.

    22. Construction camera frame at 4:30 PM PT. No construction activity — the site is quiet.
      4:30 PM PT

      No construction activity — the site is quiet.

    23. Construction camera frame at 4:15 PM PT. No construction activity — the site is quiet.
      4:15 PM PT

      No construction activity — the site is quiet.

    24. Construction camera frame at 4:00 PM PT. No construction activity — the site is quiet.
      4:00 PM PT

      No construction activity — the site is quiet.

    25. Construction camera frame at 3:45 PM PT. No construction activity — the site is quiet.
      3:45 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 3:30 PM PT. A single vehicle has entered the site via the driveway on the left side of the frame.
    3:30 PM PT

    A single vehicle has entered the site via the driveway on the left side of the frame.

  4. 3 similar no-change frames2:45 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. The scene remains largely as it was, with no visible changes to the equipment or vehicles on site.
      3:15 PM PT

      The scene remains largely as it was, with no visible changes to the equipment or vehicles on site.

    2. Construction camera frame at 3:00 PM PT. The equipment arrangement appears unchanged, and the site remains quiet during this interval.
      3:00 PM PT

      The equipment arrangement appears unchanged, and the site remains quiet during this interval.

    3. Construction camera frame at 2:45 PM PT. The view is consistent, showing no movement of machinery or vehicles within the timeframe.
      2:45 PM PT

      The view is consistent, showing no movement of machinery or vehicles within the timeframe.

  5. Construction camera frame at 2:30 PM PT. Everything on site appears to be in the same location as before, maintaining the quiet scene.
    2:30 PM PT

    Everything on site appears to be in the same location as before, maintaining the quiet scene.

  6. Construction camera frame at 2:15 PM PT. The site holds steady, with no apparent shifts in equipment positioning or vehicle traffic over the last quarter hour.
    2:15 PM PT

    The site holds steady, with no apparent shifts in equipment positioning or vehicle traffic over the last quarter hour.

  7. Construction camera frame at 2:00 PM PT. The site remains remarkably still, with the equipment holding its positions from the previous view.
    2:00 PM PT

    The site remains remarkably still, with the equipment holding its positions from the previous view.

  8. 5 similar no-change frames12:45 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The site appears static, with no discernible movement of equipment or vehicles in the last fifteen minutes.
      1:45 PM PT

      The site appears static, with no discernible movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 1:30 PM PT. The scene remains largely unchanged, though a vehicle appears to have left the site via the service road on the right.
      1:30 PM PT

      The scene remains largely unchanged, though a vehicle appears to have left the site via the service road on the right.

    3. Construction camera frame at 1:15 PM PT. No construction activity — the site is quiet.
      1:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 PM PT. No construction activity — the site is quiet.
      1:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:45 PM PT. No construction activity — the site is quiet.
      12:45 PM PT

      No construction activity — the site is quiet.

  9. Construction camera frame at 12:30 PM PT. A small white pickup truck has entered the site via the driveway on the left and is now parked near the equipment. Otherwise, the layout of the site and the positioning of the machinery remain as they were.
    12:30 PM PT

    A small white pickup truck has entered the site via the driveway on the left and is now parked near the equipment. Otherwise, the layout of the site and the positioning of the machinery remain as they were.

  10. 19 similar no-change frames7:45 AM–12:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:15 PM PT. The site presents a consistent view, with the heavy equipment remaining in the same positions.
      12:15 PM PT

      The site presents a consistent view, with the heavy equipment remaining in the same positions.

    2. Construction camera frame at 12:00 PM PT. The equipment arrangement appears stable, with no visible shifts in position across the site.
      12:00 PM PT

      The equipment arrangement appears stable, with no visible shifts in position across the site.

    3. Construction camera frame at 11:45 AM PT. The scene remains largely unchanged, with the equipment still clustered in the center of the site.
      11:45 AM PT

      The scene remains largely unchanged, with the equipment still clustered in the center of the site.

    4. Construction camera frame at 11:30 AM PT. No construction activity — the site is quiet.
      11:30 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 11:15 AM PT. No construction activity — the site is quiet.
      11:15 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 11:00 AM PT. No construction activity — the site is quiet.
      11:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 10:45 AM PT. No construction activity — the site is quiet.
      10:45 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 10:30 AM PT. No construction activity — the site is quiet.
      10:30 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 10:15 AM PT. No construction activity — the site is quiet.
      10:15 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 10:00 AM PT. No construction activity — the site is quiet.
      10:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 9:45 AM PT. No construction activity — the site is quiet.
      9:45 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 9:30 AM PT. No construction activity — the site is quiet.
      9:30 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 9:15 AM PT. No construction activity — the site is quiet.
      9:15 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 9:00 AM PT. No construction activity — the site is quiet.
      9:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 8:45 AM PT. No construction activity — the site is quiet.
      8:45 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 8:30 AM PT. No construction activity — the site is quiet.
      8:30 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 8:15 AM PT. No construction activity — the site is quiet.
      8:15 AM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 8:00 AM PT. No construction activity — the site is quiet.
      8:00 AM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 7:45 AM PT. No construction activity — the site is quiet.
      7:45 AM PT

      No construction activity — the site is quiet.

  11. Construction camera frame at 7:30 AM PT. A dark-colored pickup truck is now visible parked near the equipment cluster on the pad.
    7:30 AM PT

    A dark-colored pickup truck is now visible parked near the equipment cluster on the pad.

  12. Construction camera frame at 7:15 AM PT. A small, orange traffic cone has appeared near the driveway on the right side of the frame.
    7:15 AM PT

    A small, orange traffic cone has appeared near the driveway on the right side of the frame.

  13. Construction camera frame at 7:00 AM PT. The site continues to present a stable picture, with the equipment cluster remaining in the same arrangement.
    7:00 AM PT

    The site continues to present a stable picture, with the equipment cluster remaining in the same arrangement.

  14. 2 similar no-change frames6:30 AM–6:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 AM PT. The arrangement of machinery on the site remains consistent, with no apparent alterations in position.
      6:45 AM PT

      The arrangement of machinery on the site remains consistent, with no apparent alterations in position.

    2. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

  15. Construction camera frame at 6:15 AM PT. The site holds steady, with all equipment appearing in the same locations as the previous frame.
    6:15 AM PT

    The site holds steady, with all equipment appearing in the same locations as the previous frame.

  16. 2 similar no-change frames5:45 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The equipment arrangement on the pad appears static, with no noticeable movement in this interval.
      6:00 AM PT

      The equipment arrangement on the pad appears static, with no noticeable movement in this interval.

    2. Construction camera frame at 5:45 AM PT. The scene appears largely unchanged, with equipment remaining in the same positions as before.
      5:45 AM PT

      The scene appears largely unchanged, with equipment remaining in the same positions as before.

  17. Construction camera frame at 5:30 AM PT. The excavator has shifted position slightly, now facing more towards the center of the site. Visibility remains low, but the area is still largely undisturbed between these frames.
    5:30 AM PT

    The excavator has shifted position slightly, now facing more towards the center of the site. Visibility remains low, but the area is still largely undisturbed between these frames.

  18. 7 similar no-change frames12:00 AM–5:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 AM PT. The site remains quiet, with no visible shifts in equipment positions.
      5:15 AM PT

      The site remains quiet, with no visible shifts in equipment positions.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 11All daysJul 13 →