Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, July 14, 2026

Construction log

Tuesday, July 14, 2026

73 snapshots from the live camera.


AI digest

Several vehicles entered and exited the site throughout the day, and various pieces of equipment, including excavators and a small loader, shifted positions and rotated, with some material appearing to be moved near the center of the site.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Construction camera frame at 9:15 PM PT. Activity on site remains minimal, though one of the machines near the center has shifted its position slightly.
    9:15 PM PT

    Activity on site remains minimal, though one of the machines near the center has shifted its position slightly.

  4. 9 similar no-change frames7:00 PM–9:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 PM PT. The scene appears largely unchanged from fifteen minutes ago.
      9:00 PM PT

      The scene appears largely unchanged from fifteen minutes ago.

    2. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

  5. Construction camera frame at 6:45 PM PT. The arrangement of machines and materials on site has remained largely consistent during the last fifteen minutes.
    6:45 PM PT

    The arrangement of machines and materials on site has remained largely consistent during the last fifteen minutes.

  6. Construction camera frame at 6:30 PM PT. The site’s arrangement of machinery and materials appears nearly identical to the previous view.
    6:30 PM PT

    The site’s arrangement of machinery and materials appears nearly identical to the previous view.

  7. 5 similar no-change frames5:15 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The scene presents a largely unchanged view, with equipment and materials holding their positions from the previous check.
      6:15 PM PT

      The scene presents a largely unchanged view, with equipment and materials holding their positions from the previous check.

    2. Construction camera frame at 6:00 PM PT. The site shows no significant changes in equipment placement or material distribution between these views.
      6:00 PM PT

      The site shows no significant changes in equipment placement or material distribution between these views.

    3. Construction camera frame at 5:45 PM PT. The scene remains remarkably still, with no noticeable movement of equipment or materials across the site.
      5:45 PM PT

      The scene remains remarkably still, with no noticeable movement of equipment or materials across the site.

    4. Construction camera frame at 5:30 PM PT. The site maintains a consistent appearance, with no apparent alterations to the machinery or scattered materials.
      5:30 PM PT

      The site maintains a consistent appearance, with no apparent alterations to the machinery or scattered materials.

    5. Construction camera frame at 5:15 PM PT. The site appears quiet, with no discernible shifts in the positions of equipment or materials over the past fifteen minutes.
      5:15 PM PT

      The site appears quiet, with no discernible shifts in the positions of equipment or materials over the past fifteen minutes.

  8. Construction camera frame at 5:00 PM PT. The overall scene is stable, with the arrangement of equipment and materials staying consistent over the last fifteen minutes.
    5:00 PM PT

    The overall scene is stable, with the arrangement of equipment and materials staying consistent over the last fifteen minutes.

  9. Construction camera frame at 4:45 PM PT. No noticeable activity or movement of equipment has occurred between these two frames.
    4:45 PM PT

    No noticeable activity or movement of equipment has occurred between these two frames.

  10. Construction camera frame at 4:30 PM PT. The site presents a similar picture in both views, with no obvious changes to the equipment or material distribution.
    4:30 PM PT

    The site presents a similar picture in both views, with no obvious changes to the equipment or material distribution.

  11. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The layout of the site remains largely unchanged, though the center-right excavator appears to have shifted position slightly.
      4:15 PM PT

      The layout of the site remains largely unchanged, though the center-right excavator appears to have shifted position slightly.

    2. Construction camera frame at 4:00 PM PT. The scene is holding a steady state, with the placement of machines and materials appearing consistent across both views.
      4:00 PM PT

      The scene is holding a steady state, with the placement of machines and materials appearing consistent across both views.

  12. Construction camera frame at 3:45 PM PT. The scene remains remarkably consistent, with the major equipment and spread of materials appearing in the same locations.
    3:45 PM PT

    The scene remains remarkably consistent, with the major equipment and spread of materials appearing in the same locations.

  13. Construction camera frame at 3:30 PM PT. The site shows minimal alteration, with the positions of the excavators and scattered debris holding steady.
    3:30 PM PT

    The site shows minimal alteration, with the positions of the excavators and scattered debris holding steady.

  14. Construction camera frame at 3:15 PM PT. The site appears largely static, with no significant shifts in equipment positions or material placement visible between these views.
    3:15 PM PT

    The site appears largely static, with no significant shifts in equipment positions or material placement visible between these views.

  15. Construction camera frame at 3:00 PM PT. The arrangement of equipment and materials across the site remains stable, though a slight shift in the pile near the center is noticeable.
    3:00 PM PT

    The arrangement of equipment and materials across the site remains stable, though a slight shift in the pile near the center is noticeable.

  16. Construction camera frame at 2:45 PM PT. The lower-center excavator has rotated slightly, and a red vehicle has entered the site via the lower-left driveway. Otherwise, the machinery and material distribution appear unchanged.
    2:45 PM PT

    The lower-center excavator has rotated slightly, and a red vehicle has entered the site via the lower-left driveway. Otherwise, the machinery and material distribution appear unchanged.

  17. Construction camera frame at 2:30 PM PT. The scene presents a consistent appearance, with the arrangement of heavy machinery and scattered material remaining largely as it was.
    2:30 PM PT

    The scene presents a consistent appearance, with the arrangement of heavy machinery and scattered material remaining largely as it was.

  18. Construction camera frame at 2:15 PM PT. An excavator in the lower center has shifted its position, and another machine on the right has moved toward the center. A yellow vehicle has also pulled into the lower-left area of the site.
    2:15 PM PT

    An excavator in the lower center has shifted its position, and another machine on the right has moved toward the center. A yellow vehicle has also pulled into the lower-left area of the site.

  19. Construction camera frame at 2:00 PM PT. A small loader has moved from the upper-left portion of the site toward the center. Otherwise, the equipment and dispersed material maintain their previous locations.
    2:00 PM PT

    A small loader has moved from the upper-left portion of the site toward the center. Otherwise, the equipment and dispersed material maintain their previous locations.

  20. Construction camera frame at 1:45 PM PT. The site’s activity level is minimal, with the arrangement of machines and materials appearing nearly identical to the prior view.
    1:45 PM PT

    The site’s activity level is minimal, with the arrangement of machines and materials appearing nearly identical to the prior view.

  21. Construction camera frame at 1:30 PM PT. The site’s arrangement is remarkably similar to the last view, although a small pile of material seems to have been redistributed toward the center.
    1:30 PM PT

    The site’s arrangement is remarkably similar to the last view, although a small pile of material seems to have been redistributed toward the center.

  22. 5 similar no-change frames12:15 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. The site remains quite static, with machines and dispersed material holding their previous positions.
      1:15 PM PT

      The site remains quite static, with machines and dispersed material holding their previous positions.

    2. Construction camera frame at 1:00 PM PT. One of the excavators near the center of the site has shifted its position slightly. Otherwise, the scene appears stable, with equipment and materials largely unchanged.
      1:00 PM PT

      One of the excavators near the center of the site has shifted its position slightly. Otherwise, the scene appears stable, with equipment and materials largely unchanged.

    3. Construction camera frame at 12:45 PM PT. The site's appearance is consistent between views, with equipment and materials holding their prior placements.
      12:45 PM PT

      The site's appearance is consistent between views, with equipment and materials holding their prior placements.

    4. Construction camera frame at 12:30 PM PT. The overall layout of the site holds steady, with no discernible changes in machine positions or material distribution.
      12:30 PM PT

      The overall layout of the site holds steady, with no discernible changes in machine positions or material distribution.

    5. Construction camera frame at 12:15 PM PT. The scene presents a largely unchanged picture, with machinery remaining in comparable positions to the previous view.
      12:15 PM PT

      The scene presents a largely unchanged picture, with machinery remaining in comparable positions to the previous view.

  23. Construction camera frame at 12:00 PM PT. Equipment appears to be in largely the same locations as before, though a small amount of material has shifted near the center of the site.
    12:00 PM PT

    Equipment appears to be in largely the same locations as before, though a small amount of material has shifted near the center of the site.

  24. Construction camera frame at 11:45 AM PT. The view of the site is remarkably similar, showing no significant alterations to equipment placement or the distribution of materials.
    11:45 AM PT

    The view of the site is remarkably similar, showing no significant alterations to equipment placement or the distribution of materials.

  25. Construction camera frame at 11:30 AM PT. The site remains much as it was, with no readily apparent shifts in equipment positions or material stockpiles.
    11:30 AM PT

    The site remains much as it was, with no readily apparent shifts in equipment positions or material stockpiles.

  26. Construction camera frame at 11:15 AM PT. The lower-center machine has rotated slightly to the right, and a small amount of material appears to have been moved in that area.
    11:15 AM PT

    The lower-center machine has rotated slightly to the right, and a small amount of material appears to have been moved in that area.

  27. Construction camera frame at 11:00 AM PT. The scene appears stable, with no obvious movement of equipment or vehicles over the last fifteen minutes.
    11:00 AM PT

    The scene appears stable, with no obvious movement of equipment or vehicles over the last fifteen minutes.

  28. Construction camera frame at 10:45 AM PT. One of the yellow machines near the center of the site is now positioned with its boom extended, though it wasn't in the previous view; otherwise, the scene remains consistent.
    10:45 AM PT

    One of the yellow machines near the center of the site is now positioned with its boom extended, though it wasn't in the previous view; otherwise, the scene remains consistent.

  29. Construction camera frame at 10:30 AM PT. The site presents a largely unchanged view, with the positions of machines and materials appearing consistent between the two captures.
    10:30 AM PT

    The site presents a largely unchanged view, with the positions of machines and materials appearing consistent between the two captures.

  30. Construction camera frame at 10:15 AM PT. The equipment grouping in the lower-center of the frame has shifted slightly, with one machine now facing a different direction than before.
    10:15 AM PT

    The equipment grouping in the lower-center of the frame has shifted slightly, with one machine now facing a different direction than before.

  31. Construction camera frame at 10:00 AM PT. A yellow machine is now visible near the lower-center of the site, having moved into view from the left side; the other equipment appears to be holding its positions.
    10:00 AM PT

    A yellow machine is now visible near the lower-center of the site, having moved into view from the left side; the other equipment appears to be holding its positions.

  32. Construction camera frame at 9:45 AM PT. The red vehicle visible in the previous frame has shifted slightly toward the upper-right, while the rest of the site remains in the same configuration.
    9:45 AM PT

    The red vehicle visible in the previous frame has shifted slightly toward the upper-right, while the rest of the site remains in the same configuration.

  33. 4 similar no-change frames8:45 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. The overall layout of the site remains consistent, with no discernible shifts in equipment or vehicle positions.
      9:30 AM PT

      The overall layout of the site remains consistent, with no discernible shifts in equipment or vehicle positions.

    2. Construction camera frame at 9:15 AM PT. The scene appears remarkably stable, with equipment positions unchanged from the previous view.
      9:15 AM PT

      The scene appears remarkably stable, with equipment positions unchanged from the previous view.

    3. Construction camera frame at 9:00 AM PT. A red vehicle has appeared near the upper-center of the frame, having entered from off-camera; the other equipment groupings on site remain static.
      9:00 AM PT

      A red vehicle has appeared near the upper-center of the frame, having entered from off-camera; the other equipment groupings on site remain static.

    4. Construction camera frame at 8:45 AM PT. The site presents a largely unchanged view, with all visible equipment holding its prior position.
      8:45 AM PT

      The site presents a largely unchanged view, with all visible equipment holding its prior position.

  34. Construction camera frame at 8:30 AM PT. A small yellow machine has moved from the lower-left to the lower-right corner of the site. Otherwise, the arrangement of larger equipment remains consistent, and no vehicles are entering or leaving.
    8:30 AM PT

    A small yellow machine has moved from the lower-left to the lower-right corner of the site. Otherwise, the arrangement of larger equipment remains consistent, and no vehicles are entering or leaving.

  35. Construction camera frame at 8:15 AM PT. The equipment groupings on the site haven’t altered, maintaining the same arrangement as fifteen minutes ago.
    8:15 AM PT

    The equipment groupings on the site haven’t altered, maintaining the same arrangement as fifteen minutes ago.

  36. Construction camera frame at 8:00 AM PT. A white pickup truck has entered the site from the driveway on the left, and is now visible near the center of the frame. All other equipment appears to remain in the same position.
    8:00 AM PT

    A white pickup truck has entered the site from the driveway on the left, and is now visible near the center of the frame. All other equipment appears to remain in the same position.

  37. Construction camera frame at 7:45 AM PT. The shadows have lengthened across the site, but the equipment remains in the same locations as before.
    7:45 AM PT

    The shadows have lengthened across the site, but the equipment remains in the same locations as before.

  38. Construction camera frame at 7:30 AM PT. An excavator has shifted position on the pad, now angled slightly differently toward the center of the frame. Otherwise, the site appears quiet and the remaining equipment is unmoved.
    7:30 AM PT

    An excavator has shifted position on the pad, now angled slightly differently toward the center of the frame. Otherwise, the site appears quiet and the remaining equipment is unmoved.

  39. Construction camera frame at 7:15 AM PT. The scene remains stable, with no apparent shifts in equipment placement or vehicle activity over the last fifteen minutes.
    7:15 AM PT

    The scene remains stable, with no apparent shifts in equipment placement or vehicle activity over the last fifteen minutes.

  40. Construction camera frame at 7:00 AM PT. The site remains largely unchanged, with equipment holding its positions and no new arrivals or departures visible.
    7:00 AM PT

    The site remains largely unchanged, with equipment holding its positions and no new arrivals or departures visible.

  41. Construction camera frame at 6:45 AM PT. The arrangement of equipment on the site appears consistent, with no noticeable repositioning in the last quarter of an hour.
    6:45 AM PT

    The arrangement of equipment on the site appears consistent, with no noticeable repositioning in the last quarter of an hour.

  42. 2 similar no-change frames6:15 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. The equipment arrangement on the pad is static, showing no discernible movement over the last fifteen minutes.
      6:30 AM PT

      The equipment arrangement on the pad is static, showing no discernible movement over the last fifteen minutes.

    2. Construction camera frame at 6:15 AM PT. The site presents a consistent view, with all equipment remaining in the same positions as fifteen minutes ago.
      6:15 AM PT

      The site presents a consistent view, with all equipment remaining in the same positions as fifteen minutes ago.

  43. Construction camera frame at 6:00 AM PT. A dark-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and overall scene are holding steady.
    6:00 AM PT

    A dark-colored vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the equipment and overall scene are holding steady.

  44. 9 similar no-change frames12:00 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 5:30 AM PT. The scene appears stable, with no visible shifts in equipment placement or activity.
      5:30 AM PT

      The scene appears stable, with no visible shifts in equipment placement or activity.

    3. Construction camera frame at 5:15 AM PT. The site remains largely unchanged, with the equipment still positioned in the same areas as before.
      5:15 AM PT

      The site remains largely unchanged, with the equipment still positioned in the same areas as before.

    4. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 13All daysJul 15 →