Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, July 13, 2026

Construction log

Monday, July 13, 2026

73 snapshots from the live camera.


AI digest

A broad area of the central pad is visibly darker and rougher in the last frame than in the week-earlier view, with several machines positioned around it; the low-light frames make the extent of any ground change during the day unclear. Activity was otherwise limited: equipment shifted slightly, and small vehicles entered and left, while the site remained largely still.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Construction camera frame at 9:15 PM PT. The view remains remarkably still, with the equipment on site holding its positions over the last quarter of an hour.
    9:15 PM PT

    The view remains remarkably still, with the equipment on site holding its positions over the last quarter of an hour.

  4. Construction camera frame at 9:00 PM PT. The site presents a consistent view, with no visible alterations to the positioning of equipment or ground conditions.
    9:00 PM PT

    The site presents a consistent view, with no visible alterations to the positioning of equipment or ground conditions.

  5. Construction camera frame at 8:45 PM PT. Nothing appears to have shifted on the site in the last fifteen minutes, and the equipment remains stationary.
    8:45 PM PT

    Nothing appears to have shifted on the site in the last fifteen minutes, and the equipment remains stationary.

  6. 5 similar no-change frames7:30 PM–8:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 PM PT. The arrangement of equipment on the site appears unchanged from fifteen minutes ago.
      8:30 PM PT

      The arrangement of equipment on the site appears unchanged from fifteen minutes ago.

    2. Construction camera frame at 8:15 PM PT. The scene is stable, with no noticeable changes to the equipment arrangement or site conditions in the last fifteen minutes.
      8:15 PM PT

      The scene is stable, with no noticeable changes to the equipment arrangement or site conditions in the last fifteen minutes.

    3. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 7:45 PM PT. The site remains largely as it was, with no visible shifts in equipment or activity during the last fifteen minutes.
      7:45 PM PT

      The site remains largely as it was, with no visible shifts in equipment or activity during the last fifteen minutes.

    5. Construction camera frame at 7:30 PM PT. The machinery on the flat site remains in the same positions, showing no discernible shifts in placement.
      7:30 PM PT

      The machinery on the flat site remains in the same positions, showing no discernible shifts in placement.

  7. Construction camera frame at 7:15 PM PT. The equipment grouping on the pad hasn't altered its arrangement over the past fifteen minutes.
    7:15 PM PT

    The equipment grouping on the pad hasn't altered its arrangement over the past fifteen minutes.

  8. 2 similar no-change frames6:45 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. The site presents a consistent view, with the machinery remaining in the same locations as before.
      7:00 PM PT

      The site presents a consistent view, with the machinery remaining in the same locations as before.

    2. Construction camera frame at 6:45 PM PT. The equipment on the pad appears to be holding its place, with no noticeable movement in the last quarter hour.
      6:45 PM PT

      The equipment on the pad appears to be holding its place, with no noticeable movement in the last quarter hour.

  9. Construction camera frame at 6:30 PM PT. The scene is holding steady, with the equipment cluster maintaining its positions on the dirt pad.
    6:30 PM PT

    The scene is holding steady, with the equipment cluster maintaining its positions on the dirt pad.

  10. Construction camera frame at 6:15 PM PT. A small white pickup has exited the driveway on the left, leaving the site’s equipment and layout otherwise unchanged.
    6:15 PM PT

    A small white pickup has exited the driveway on the left, leaving the site’s equipment and layout otherwise unchanged.

  11. Construction camera frame at 6:00 PM PT. The scene remains remarkably similar, with the equipment maintaining its previous positions on the pad.
    6:00 PM PT

    The scene remains remarkably similar, with the equipment maintaining its previous positions on the pad.

  12. Construction camera frame at 5:45 PM PT. The arrangement of machinery on the pad appears largely static, though a small vehicle has shifted position near the center of the site.
    5:45 PM PT

    The arrangement of machinery on the pad appears largely static, though a small vehicle has shifted position near the center of the site.

  13. Construction camera frame at 5:30 PM PT. The overall layout of the site remains consistent, though a small white pickup has entered from the driveway on the left.
    5:30 PM PT

    The overall layout of the site remains consistent, though a small white pickup has entered from the driveway on the left.

  14. Construction camera frame at 5:15 PM PT. The equipment arrangement appears stable, showing no clear shifts in position over the last fifteen minutes.
    5:15 PM PT

    The equipment arrangement appears stable, showing no clear shifts in position over the last fifteen minutes.

  15. 2 similar no-change frames4:45 PM–5:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 PM PT. The view across the site is largely unchanged, with equipment appearing in the same arrangement as before.
      5:00 PM PT

      The view across the site is largely unchanged, with equipment appearing in the same arrangement as before.

    2. Construction camera frame at 4:45 PM PT. The site presents a virtually identical view to the last check, with no noticeable shifts in equipment or activity.
      4:45 PM PT

      The site presents a virtually identical view to the last check, with no noticeable shifts in equipment or activity.

  16. Construction camera frame at 4:30 PM PT. The site holds steady, with no apparent adjustments to the positions of equipment or materials.
    4:30 PM PT

    The site holds steady, with no apparent adjustments to the positions of equipment or materials.

  17. Construction camera frame at 4:15 PM PT. Everything remains in place across the site.
    4:15 PM PT

    Everything remains in place across the site.

  18. 4 similar no-change frames3:15 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The scene remains remarkably consistent, with no discernible changes to equipment placement or activity.
      4:00 PM PT

      The scene remains remarkably consistent, with no discernible changes to equipment placement or activity.

    2. Construction camera frame at 3:45 PM PT. No visible movement or changes have occurred across the site.
      3:45 PM PT

      No visible movement or changes have occurred across the site.

    3. Construction camera frame at 3:30 PM PT. The site appears static, with all equipment remaining in the same positions as before.
      3:30 PM PT

      The site appears static, with all equipment remaining in the same positions as before.

    4. Construction camera frame at 3:15 PM PT. The arrangement of equipment across the pad remains largely unchanged from the previous view.
      3:15 PM PT

      The arrangement of equipment across the pad remains largely unchanged from the previous view.

  19. Construction camera frame at 3:00 PM PT. The excavators on the lower half of the pad have shifted their positions, and a yellow machine in the upper center has moved slightly.
    3:00 PM PT

    The excavators on the lower half of the pad have shifted their positions, and a yellow machine in the upper center has moved slightly.

  20. Construction camera frame at 2:45 PM PT. The equipment grouping in the center of the pad seems to have shifted slightly, with one excavator now angled differently.
    2:45 PM PT

    The equipment grouping in the center of the pad seems to have shifted slightly, with one excavator now angled differently.

  21. Construction camera frame at 2:30 PM PT. The machines on the pad haven’t altered their positions in the last quarter of an hour.
    2:30 PM PT

    The machines on the pad haven’t altered their positions in the last quarter of an hour.

  22. Construction camera frame at 2:15 PM PT. The cluster of yellow equipment in the lower-left has slightly rearranged itself, with one machine now facing toward the street.
    2:15 PM PT

    The cluster of yellow equipment in the lower-left has slightly rearranged itself, with one machine now facing toward the street.

  23. Construction camera frame at 2:00 PM PT. The equipment on the pad appears to be in the same locations as it was a few minutes ago.
    2:00 PM PT

    The equipment on the pad appears to be in the same locations as it was a few minutes ago.

  24. Construction camera frame at 1:45 PM PT. The scene on the pad is remarkably still, with the positions of the larger machines appearing consistent.
    1:45 PM PT

    The scene on the pad is remarkably still, with the positions of the larger machines appearing consistent.

  25. Construction camera frame at 1:30 PM PT. A yellow vehicle has entered the site from the left and is positioned near the disturbed area in the lower-left corner.
    1:30 PM PT

    A yellow vehicle has entered the site from the left and is positioned near the disturbed area in the lower-left corner.

  26. Construction camera frame at 1:15 PM PT. The arrangement of equipment on the pad remains stable, with no noticeable shifts in position.
    1:15 PM PT

    The arrangement of equipment on the pad remains stable, with no noticeable shifts in position.

  27. Construction camera frame at 1:00 PM PT. The excavators in the lower half of the frame have shifted positions, and a yellow vehicle has pulled onto the site from the left.
    1:00 PM PT

    The excavators in the lower half of the frame have shifted positions, and a yellow vehicle has pulled onto the site from the left.

  28. Construction camera frame at 12:45 PM PT. A small yellow machine has moved from the upper center of the pad to the right, near the edge.
    12:45 PM PT

    A small yellow machine has moved from the upper center of the pad to the right, near the edge.

  29. Construction camera frame at 12:30 PM PT. The equipment arrangement on the pad looks consistent with the view from earlier.
    12:30 PM PT

    The equipment arrangement on the pad looks consistent with the view from earlier.

  30. Construction camera frame at 12:15 PM PT. The site appears largely unchanged from fifteen minutes ago, with equipment remaining in similar positions.
    12:15 PM PT

    The site appears largely unchanged from fifteen minutes ago, with equipment remaining in similar positions.

  31. Construction camera frame at 12:00 PM PT. One of the excavators closer to the bottom of the frame has rotated, now facing more directly toward the right side of the pad.
    12:00 PM PT

    One of the excavators closer to the bottom of the frame has rotated, now facing more directly toward the right side of the pad.

  32. Construction camera frame at 11:45 AM PT. The excavator near the center of the pad is now angled to the right, having shifted its position slightly.
    11:45 AM PT

    The excavator near the center of the pad is now angled to the right, having shifted its position slightly.

  33. Construction camera frame at 11:30 AM PT. The arrangement of equipment on the pad hasn't shifted noticeably in the last fifteen minutes.
    11:30 AM PT

    The arrangement of equipment on the pad hasn't shifted noticeably in the last fifteen minutes.

  34. Construction camera frame at 11:15 AM PT. A yellow vehicle has appeared near the bottom right corner of the pad.
    11:15 AM PT

    A yellow vehicle has appeared near the bottom right corner of the pad.

  35. Construction camera frame at 11:00 AM PT. Everything on the pad remains in roughly the same arrangement as it was a few minutes ago.
    11:00 AM PT

    Everything on the pad remains in roughly the same arrangement as it was a few minutes ago.

  36. Construction camera frame at 10:45 AM PT. The excavator at the lower left corner is now oriented differently, with its arm extended toward the center of the pad.
    10:45 AM PT

    The excavator at the lower left corner is now oriented differently, with its arm extended toward the center of the pad.

  37. Construction camera frame at 10:30 AM PT. The site appears largely unchanged, with equipment remaining in the same positions as before.
    10:30 AM PT

    The site appears largely unchanged, with equipment remaining in the same positions as before.

  38. Construction camera frame at 10:15 AM PT. The excavator near the bottom left has swung its boom across the pad, and a yellow vehicle has moved closer to it.
    10:15 AM PT

    The excavator near the bottom left has swung its boom across the pad, and a yellow vehicle has moved closer to it.

  39. Construction camera frame at 10:00 AM PT. A red vehicle has moved onto the pad from the left side, now parking among the other equipment near the center.
    10:00 AM PT

    A red vehicle has moved onto the pad from the left side, now parking among the other equipment near the center.

  40. Construction camera frame at 9:45 AM PT. The excavator in the center of the pad has shifted its position and angled its arm toward the left.
    9:45 AM PT

    The excavator in the center of the pad has shifted its position and angled its arm toward the left.

  41. Construction camera frame at 9:30 AM PT. The excavator near the bottom of the frame has shifted its position slightly, now facing more directly toward the lower edge.
    9:30 AM PT

    The excavator near the bottom of the frame has shifted its position slightly, now facing more directly toward the lower edge.

  42. Construction camera frame at 9:15 AM PT. A vehicle has entered the site from the left side driveway and is now positioned near the center of the pad.
    9:15 AM PT

    A vehicle has entered the site from the left side driveway and is now positioned near the center of the pad.

  43. Construction camera frame at 9:00 AM PT. A small piece of equipment has moved from the center of the pad down toward the bottom right corner of the frame.
    9:00 AM PT

    A small piece of equipment has moved from the center of the pad down toward the bottom right corner of the frame.

  44. Construction camera frame at 8:45 AM PT. The machinery on the cleared site remains in roughly the same spots, with no noticeable repositioning of the larger equipment.
    8:45 AM PT

    The machinery on the cleared site remains in roughly the same spots, with no noticeable repositioning of the larger equipment.

  45. Construction camera frame at 8:30 AM PT. The equipment on the pad maintains its general position, although one of the dozers has moved a short distance toward the upper right corner.
    8:30 AM PT

    The equipment on the pad maintains its general position, although one of the dozers has moved a short distance toward the upper right corner.

  46. Construction camera frame at 8:15 AM PT. The equipment grouping toward the center of the site is now oriented slightly differently, with the excavator angled more towards the upper edge of the frame.
    8:15 AM PT

    The equipment grouping toward the center of the site is now oriented slightly differently, with the excavator angled more towards the upper edge of the frame.

  47. Construction camera frame at 8:00 AM PT. The arrangement of the machinery on the pad appears consistent, though a small red vehicle has entered the site via the driveway on the left.
    8:00 AM PT

    The arrangement of the machinery on the pad appears consistent, though a small red vehicle has entered the site via the driveway on the left.

  48. Construction camera frame at 7:45 AM PT. The layout of the equipment on the pad remains mostly unchanged between these views.
    7:45 AM PT

    The layout of the equipment on the pad remains mostly unchanged between these views.

  49. Construction camera frame at 7:30 AM PT. The equipment appears to be in largely the same arrangement, though the excavator seems to have rotated slightly.
    7:30 AM PT

    The equipment appears to be in largely the same arrangement, though the excavator seems to have rotated slightly.

  50. Construction camera frame at 7:15 AM PT. The cluster of equipment toward the center of the site has shifted slightly to the right.
    7:15 AM PT

    The cluster of equipment toward the center of the site has shifted slightly to the right.

  51. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The site shows no alterations, with the equipment remaining in the same positions as the previous view.
      7:00 AM PT

      The site shows no alterations, with the equipment remaining in the same positions as the previous view.

    2. Construction camera frame at 6:45 AM PT. The site remains quiet, with no noticeable alterations in equipment placement or activity during this interval.
      6:45 AM PT

      The site remains quiet, with no noticeable alterations in equipment placement or activity during this interval.

  52. Construction camera frame at 6:30 AM PT. The site presents a similar view as before, and no equipment appears to have moved in the last fifteen minutes.
    6:30 AM PT

    The site presents a similar view as before, and no equipment appears to have moved in the last fifteen minutes.

  53. 5 similar no-change frames5:15 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The scene holds steady, with equipment remaining in the same locations as before.
      6:15 AM PT

      The scene holds steady, with equipment remaining in the same locations as before.

    2. Construction camera frame at 6:00 AM PT. The equipment arrangement looks consistent, with no observable changes in position or activity across the site.
      6:00 AM PT

      The equipment arrangement looks consistent, with no observable changes in position or activity across the site.

    3. Construction camera frame at 5:45 AM PT. The scene appears stable, with no discernible shifts in the positions of equipment or vehicles.
      5:45 AM PT

      The scene appears stable, with no discernible shifts in the positions of equipment or vehicles.

    4. Construction camera frame at 5:30 AM PT. The site remains still, with no visible movement of equipment or vehicles between frames.
      5:30 AM PT

      The site remains still, with no visible movement of equipment or vehicles between frames.

    5. Construction camera frame at 5:15 AM PT. The excavator has shifted position slightly, now facing more towards the center of the site. Otherwise, the scene remains largely unchanged, with low visibility and no other apparent activity.
      5:15 AM PT

      The excavator has shifted position slightly, now facing more towards the center of the site. Otherwise, the scene remains largely unchanged, with low visibility and no other apparent activity.

  54. Construction camera frame at 5:00 AM PT. Visibility remains low, but the site appears quiet with no noticeable changes in equipment positions.
    5:00 AM PT

    Visibility remains low, but the site appears quiet with no noticeable changes in equipment positions.

  55. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 12All daysJul 14 →