Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, July 16, 2026

Construction log

Thursday, July 16, 2026

72 snapshots from the live camera.


AI digest

A broad central area of the site is visibly darker and more uneven by day’s end, with several machines positioned along its edge; compared with July 9, the central cut is larger. During the day, vehicles arrived and pooled water gradually receded, while most equipment remained in place.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. The site appears quiet, with no noticeable shifts in equipment positions or water levels over the last fifteen minutes.
      9:00 PM PT

      The site appears quiet, with no noticeable shifts in equipment positions or water levels over the last fifteen minutes.

  3. Construction camera frame at 8:45 PM PT. Activity on the site is minimal, though a white vehicle is now visible positioned along the right edge, near the service road.
    8:45 PM PT

    Activity on the site is minimal, though a white vehicle is now visible positioned along the right edge, near the service road.

  4. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  5. Construction camera frame at 8:15 PM PT. The site remains much as it was, though a small amount of water appears to have drained from the lower-right quadrant.
    8:15 PM PT

    The site remains much as it was, though a small amount of water appears to have drained from the lower-right quadrant.

  6. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  7. Construction camera frame at 7:45 PM PT. The arrangement of equipment remains largely unchanged, although the water appears to have receded slightly in the lower portion of the site.
    7:45 PM PT

    The arrangement of equipment remains largely unchanged, although the water appears to have receded slightly in the lower portion of the site.

  8. Construction camera frame at 7:30 PM PT. The scene is holding steady, with equipment in the same positions and water levels appearing consistent.
    7:30 PM PT

    The scene is holding steady, with equipment in the same positions and water levels appearing consistent.

  9. Construction camera frame at 7:15 PM PT. The site appears quite similar, though a white truck now sits near the center of the block where none was visible before.
    7:15 PM PT

    The site appears quite similar, though a white truck now sits near the center of the block where none was visible before.

  10. Construction camera frame at 7:00 PM PT. The site shows a largely similar arrangement, with the water level appearing stable across the cleared areas.
    7:00 PM PT

    The site shows a largely similar arrangement, with the water level appearing stable across the cleared areas.

  11. Construction camera frame at 6:45 PM PT. The equipment arrangement appears consistent, though the pooled water has subtly shifted across the site.
    6:45 PM PT

    The equipment arrangement appears consistent, though the pooled water has subtly shifted across the site.

  12. Construction camera frame at 6:30 PM PT. No detectable movement or changes have occurred across the block.
    6:30 PM PT

    No detectable movement or changes have occurred across the block.

  13. 2 similar no-change frames6:00 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The site presents a static view, with no noticeable changes in equipment positions or water levels between these frames.
      6:15 PM PT

      The site presents a static view, with no noticeable changes in equipment positions or water levels between these frames.

    2. Construction camera frame at 6:00 PM PT. The scene remains largely unchanged, though the standing water appears slightly reduced across the cleared area.
      6:00 PM PT

      The scene remains largely unchanged, though the standing water appears slightly reduced across the cleared area.

  14. Construction camera frame at 5:45 PM PT. The machinery on site maintains its prior arrangement, with only negligible alterations to the pooled water.
    5:45 PM PT

    The machinery on site maintains its prior arrangement, with only negligible alterations to the pooled water.

  15. Construction camera frame at 5:30 PM PT. The site’s appearance is remarkably consistent, with the machinery remaining in the same locations.
    5:30 PM PT

    The site’s appearance is remarkably consistent, with the machinery remaining in the same locations.

  16. Construction camera frame at 5:15 PM PT. Nothing has shifted across the site between these two frames.
    5:15 PM PT

    Nothing has shifted across the site between these two frames.

  17. Construction camera frame at 5:00 PM PT. The scene shows little alteration, although the water level seems to have decreased very slightly in the central area.
    5:00 PM PT

    The scene shows little alteration, although the water level seems to have decreased very slightly in the central area.

  18. Construction camera frame at 4:45 PM PT. Equipment appears to be holding its positions, with only minor variations in the standing water across the site.
    4:45 PM PT

    Equipment appears to be holding its positions, with only minor variations in the standing water across the site.

  19. Construction camera frame at 4:30 PM PT. The site appears quiet, with no readily visible differences in equipment placement or water levels between the two views.
    4:30 PM PT

    The site appears quiet, with no readily visible differences in equipment placement or water levels between the two views.

  20. 2 similar no-change frames4:00 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The scene remains largely unchanged, though the water appears slightly lower in some areas.
      4:15 PM PT

      The scene remains largely unchanged, though the water appears slightly lower in some areas.

    2. Construction camera frame at 4:00 PM PT. The overall scene presents a stable picture, with no visible shifts in equipment positions or water levels.
      4:00 PM PT

      The overall scene presents a stable picture, with no visible shifts in equipment positions or water levels.

  21. Construction camera frame at 3:45 PM PT. The water level has continued to fall, exposing more of the surface across the site’s lower areas.
    3:45 PM PT

    The water level has continued to fall, exposing more of the surface across the site’s lower areas.

  22. Construction camera frame at 3:30 PM PT. A white truck has entered the site via the driveway on the left side of the frame.
    3:30 PM PT

    A white truck has entered the site via the driveway on the left side of the frame.

  23. Construction camera frame at 3:15 PM PT. The scene is remarkably steady, with no apparent movement of equipment or significant changes in water levels.
    3:15 PM PT

    The scene is remarkably steady, with no apparent movement of equipment or significant changes in water levels.

  24. Construction camera frame at 3:00 PM PT. The site looks much the same as before, though the water level continues a gradual decline.
    3:00 PM PT

    The site looks much the same as before, though the water level continues a gradual decline.

  25. Construction camera frame at 2:45 PM PT. The water level across the site has noticeably decreased, revealing more of the surface below.
    2:45 PM PT

    The water level across the site has noticeably decreased, revealing more of the surface below.

  26. Construction camera frame at 2:30 PM PT. The equipment arrangement remains largely unchanged, although the water level seems to have dropped a bit further across the lower section of the site.
    2:30 PM PT

    The equipment arrangement remains largely unchanged, although the water level seems to have dropped a bit further across the lower section of the site.

  27. Construction camera frame at 2:15 PM PT. The site presents a very similar picture, though the water appears to have receded slightly from the lower portion.
    2:15 PM PT

    The site presents a very similar picture, though the water appears to have receded slightly from the lower portion.

  28. Construction camera frame at 2:00 PM PT. The overall appearance of the site is consistent between the two views, with no significant shifts in equipment positions or water levels.
    2:00 PM PT

    The overall appearance of the site is consistent between the two views, with no significant shifts in equipment positions or water levels.

  29. Construction camera frame at 1:45 PM PT. The site remains relatively still, though a dump truck now occupies a space previously empty near the center.
    1:45 PM PT

    The site remains relatively still, though a dump truck now occupies a space previously empty near the center.

  30. Construction camera frame at 1:30 PM PT. The scene appears quite stable, with only minor variations in the amount of standing water visible.
    1:30 PM PT

    The scene appears quite stable, with only minor variations in the amount of standing water visible.

  31. Construction camera frame at 1:15 PM PT. A white van has entered the site via the driveway on the left and is now parked near the street.
    1:15 PM PT

    A white van has entered the site via the driveway on the left and is now parked near the street.

  32. Construction camera frame at 1:00 PM PT. A subtle shift in the water level reveals a bit more of the surface across the site’s lower section.
    1:00 PM PT

    A subtle shift in the water level reveals a bit more of the surface across the site’s lower section.

  33. Construction camera frame at 12:45 PM PT. The scene is largely unchanged, though a slight decrease in standing water is visible across the site.
    12:45 PM PT

    The scene is largely unchanged, though a slight decrease in standing water is visible across the site.

  34. Construction camera frame at 12:30 PM PT. The site shows a continued lowering of the water level, with a slightly larger area of the underlying surface now exposed.
    12:30 PM PT

    The site shows a continued lowering of the water level, with a slightly larger area of the underlying surface now exposed.

  35. Construction camera frame at 12:15 PM PT. The water level has receded further, revealing more of the surface beneath across the site.
    12:15 PM PT

    The water level has receded further, revealing more of the surface beneath across the site.

  36. Construction camera frame at 12:00 PM PT. The overall scene remains consistent, though the water level continues a gradual reduction across the cleared area.
    12:00 PM PT

    The overall scene remains consistent, though the water level continues a gradual reduction across the cleared area.

  37. Construction camera frame at 11:45 AM PT. The scene appears stable, with no visible alterations to equipment placement or water levels since the last view.
    11:45 AM PT

    The scene appears stable, with no visible alterations to equipment placement or water levels since the last view.

  38. Construction camera frame at 11:30 AM PT. The water has continued to drain from the site, exposing a larger area of the underlying surface.
    11:30 AM PT

    The water has continued to drain from the site, exposing a larger area of the underlying surface.

  39. Construction camera frame at 11:15 AM PT. A yellow truck has pulled into the site from the left driveway, and an excavator in the center has shifted its position.
    11:15 AM PT

    A yellow truck has pulled into the site from the left driveway, and an excavator in the center has shifted its position.

  40. Construction camera frame at 11:00 AM PT. Equipment locations appear unchanged, but the pooled water has noticeably diminished across the site.
    11:00 AM PT

    Equipment locations appear unchanged, but the pooled water has noticeably diminished across the site.

  41. Construction camera frame at 10:45 AM PT. The site maintains a similar appearance to the previous view, with no obvious shifts in equipment or water levels.
    10:45 AM PT

    The site maintains a similar appearance to the previous view, with no obvious shifts in equipment or water levels.

  42. Construction camera frame at 10:30 AM PT. The arrangement of machinery remains largely the same, although the water level seems to have shifted slightly across the site.
    10:30 AM PT

    The arrangement of machinery remains largely the same, although the water level seems to have shifted slightly across the site.

  43. Construction camera frame at 10:15 AM PT. The water level across the site appears to have dropped further, revealing more of the surface below.
    10:15 AM PT

    The water level across the site appears to have dropped further, revealing more of the surface below.

  44. Construction camera frame at 10:00 AM PT. The overall layout of the site is consistent, though the pooled water appears to have slightly receded.
    10:00 AM PT

    The overall layout of the site is consistent, though the pooled water appears to have slightly receded.

  45. Construction camera frame at 9:45 AM PT. The site's appearance is stable, with machines and scattered materials maintaining their positions from the previous view.
    9:45 AM PT

    The site's appearance is stable, with machines and scattered materials maintaining their positions from the previous view.

  46. Construction camera frame at 9:30 AM PT. The scene presents a quiet continuation of work, with no discernible changes to equipment positions or material layouts.
    9:30 AM PT

    The scene presents a quiet continuation of work, with no discernible changes to equipment positions or material layouts.

  47. Construction camera frame at 9:15 AM PT. A white pickup truck has entered the site via the driveway on the left and is now parked near the other vehicles.
    9:15 AM PT

    A white pickup truck has entered the site via the driveway on the left and is now parked near the other vehicles.

  48. 3 similar no-change frames8:30 AM–9:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 AM PT. The scene remains remarkably still, with the arrangement of equipment and materials appearing unchanged.
      9:00 AM PT

      The scene remains remarkably still, with the arrangement of equipment and materials appearing unchanged.

    2. Construction camera frame at 8:45 AM PT. The equipment layout remains consistent, with no visible movement of machines or materials in the last quarter hour.
      8:45 AM PT

      The equipment layout remains consistent, with no visible movement of machines or materials in the last quarter hour.

    3. Construction camera frame at 8:30 AM PT. The scene is holding steady, with no apparent shifts in the placement of machines or materials across the site.
      8:30 AM PT

      The scene is holding steady, with no apparent shifts in the placement of machines or materials across the site.

  49. Construction camera frame at 8:15 AM PT. The site appears largely the same as before, with machinery and piles of material holding their positions.
    8:15 AM PT

    The site appears largely the same as before, with machinery and piles of material holding their positions.

  50. Construction camera frame at 8:00 AM PT. The arrangement of equipment and materials appears to be static, showing no noticeable changes in the last fifteen minutes.
    8:00 AM PT

    The arrangement of equipment and materials appears to be static, showing no noticeable changes in the last fifteen minutes.

  51. Construction camera frame at 7:45 AM PT. The site shows little alteration in the last fifteen minutes, with the machines and material piles appearing in the same arrangement.
    7:45 AM PT

    The site shows little alteration in the last fifteen minutes, with the machines and material piles appearing in the same arrangement.

  52. Construction camera frame at 7:30 AM PT. A couple of trucks are now visible near the driveway on the left side of the frame, having arrived since the last view.
    7:30 AM PT

    A couple of trucks are now visible near the driveway on the left side of the frame, having arrived since the last view.

  53. 2 similar no-change frames7:00 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. Conditions at the site appear unchanged from the previous view, with all equipment remaining in the same positions.
      7:15 AM PT

      Conditions at the site appear unchanged from the previous view, with all equipment remaining in the same positions.

    2. Construction camera frame at 7:00 AM PT. The view remains remarkably consistent, with no visible movement of equipment or vehicles in the last quarter hour.
      7:00 AM PT

      The view remains remarkably consistent, with no visible movement of equipment or vehicles in the last quarter hour.

  54. Construction camera frame at 6:45 AM PT. The scene presents a stable picture, with the machinery maintaining its positions from the earlier view.
    6:45 AM PT

    The scene presents a stable picture, with the machinery maintaining its positions from the earlier view.

  55. Construction camera frame at 6:30 AM PT. The equipment across the site holds steady, with no apparent shifts in position over the last fifteen minutes.
    6:30 AM PT

    The equipment across the site holds steady, with no apparent shifts in position over the last fifteen minutes.

  56. Construction camera frame at 6:15 AM PT. A white van has entered the site from the driveway on the left and is now parked near the equipment in the center.
    6:15 AM PT

    A white van has entered the site from the driveway on the left and is now parked near the equipment in the center.

  57. Construction camera frame at 6:00 AM PT. The machines are in the same locations as before, though the light has subtly altered the scene’s appearance.
    6:00 AM PT

    The machines are in the same locations as before, though the light has subtly altered the scene’s appearance.

  58. Construction camera frame at 5:45 AM PT. The scene looks largely the same, with equipment holding its positions across the site.
    5:45 AM PT

    The scene looks largely the same, with equipment holding its positions across the site.

  59. Construction camera frame at 5:30 AM PT. The arrangement of equipment remains consistent between these views, though the light has shifted slightly.
    5:30 AM PT

    The arrangement of equipment remains consistent between these views, though the light has shifted slightly.

  60. Construction camera frame at 5:15 AM PT. The site is brighter now, revealing several machines that were dimly visible before, but the overall arrangement appears unchanged.
    5:15 AM PT

    The site is brighter now, revealing several machines that were dimly visible before, but the overall arrangement appears unchanged.

  61. 6 similar no-change frames12:00 AM–5:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 15All daysJul 17 →