Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, July 17, 2026

Construction log

Friday, July 17, 2026

73 snapshots from the live camera.


AI digest

The central cut is visibly larger and deeper than in the July 10 frame, with several excavators working around it. Activity was otherwise intermittent and light today: trucks and small vehicles came and went, while machinery mostly stayed in place; no major change is apparent between the day’s first and last frames.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 11 similar no-change frames7:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 6:45 PM PT. Shadows have lengthened across the site, but the positions of the machinery and materials haven’t noticeably altered.
    6:45 PM PT

    Shadows have lengthened across the site, but the positions of the machinery and materials haven’t noticeably altered.

  4. Construction camera frame at 6:30 PM PT. The arrangement of equipment across the site appears stable, though shadows have shifted with the sun's movement.
    6:30 PM PT

    The arrangement of equipment across the site appears stable, though shadows have shifted with the sun's movement.

  5. Construction camera frame at 6:15 PM PT. The site shows minimal alteration over the last fifteen minutes, with the machinery remaining in the same general areas.
    6:15 PM PT

    The site shows minimal alteration over the last fifteen minutes, with the machinery remaining in the same general areas.

  6. Construction camera frame at 6:00 PM PT. The site presents a similar picture to the last check-in, with no apparent repositioning of the heavy machinery.
    6:00 PM PT

    The site presents a similar picture to the last check-in, with no apparent repositioning of the heavy machinery.

  7. 6 similar no-change frames4:30 PM–5:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 PM PT. Equipment remains in largely the same positions as before, though sunlight has altered the shadows across the site.
      5:45 PM PT

      Equipment remains in largely the same positions as before, though sunlight has altered the shadows across the site.

    2. Construction camera frame at 5:30 PM PT. The scene remains remarkably consistent, with equipment and material distribution appearing unchanged.
      5:30 PM PT

      The scene remains remarkably consistent, with equipment and material distribution appearing unchanged.

    3. Construction camera frame at 5:15 PM PT. The site maintains a static appearance, with no discernible changes in the location of equipment or the distribution of materials.
      5:15 PM PT

      The site maintains a static appearance, with no discernible changes in the location of equipment or the distribution of materials.

    4. Construction camera frame at 5:00 PM PT. The site appears largely as it was fifteen minutes ago, with no noticeable shifts in equipment positions or material stockpiles.
      5:00 PM PT

      The site appears largely as it was fifteen minutes ago, with no noticeable shifts in equipment positions or material stockpiles.

    5. Construction camera frame at 4:45 PM PT. The arrangement of equipment appears unchanged, though shadows have shifted slightly across the site.
      4:45 PM PT

      The arrangement of equipment appears unchanged, though shadows have shifted slightly across the site.

    6. Construction camera frame at 4:30 PM PT. No movement is visible across the site, with all machinery and vehicles remaining in their previous positions.
      4:30 PM PT

      No movement is visible across the site, with all machinery and vehicles remaining in their previous positions.

  8. Construction camera frame at 4:15 PM PT. The site presents a familiar view, with equipment largely unmoved from the previous check.
    4:15 PM PT

    The site presents a familiar view, with equipment largely unmoved from the previous check.

  9. Construction camera frame at 4:00 PM PT. A small white vehicle has moved slightly further into the central area of the site. Otherwise, the arrangement of machinery and the extent of the cleared area are consistent between the two views.
    4:00 PM PT

    A small white vehicle has moved slightly further into the central area of the site. Otherwise, the arrangement of machinery and the extent of the cleared area are consistent between the two views.

  10. Construction camera frame at 3:45 PM PT. The scene holds a consistent appearance, with the positioning of the excavators and the overall layout of the site remaining stable.
    3:45 PM PT

    The scene holds a consistent appearance, with the positioning of the excavators and the overall layout of the site remaining stable.

  11. Construction camera frame at 3:30 PM PT. The scene remains quite static, with the arrangement of equipment and the extent of the cleared area appearing nearly identical to the last check.
    3:30 PM PT

    The scene remains quite static, with the arrangement of equipment and the extent of the cleared area appearing nearly identical to the last check.

  12. Construction camera frame at 3:15 PM PT. A white pickup truck is now visible near the center of the site, having entered from the driveway on the left. The overall scene otherwise shows little discernible difference.
    3:15 PM PT

    A white pickup truck is now visible near the center of the site, having entered from the driveway on the left. The overall scene otherwise shows little discernible difference.

  13. 2 similar no-change frames2:45 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The layout of equipment across the site is holding, with no apparent shifts in position over the last fifteen minutes.
      3:00 PM PT

      The layout of equipment across the site is holding, with no apparent shifts in position over the last fifteen minutes.

    2. Construction camera frame at 2:45 PM PT. The scene appears largely unchanged, with equipment maintaining its positions across the site.
      2:45 PM PT

      The scene appears largely unchanged, with equipment maintaining its positions across the site.

  14. Construction camera frame at 2:30 PM PT. The site presents a largely stable picture, with the positions of the heavy machinery and the extent of the cleared area holding steady.
    2:30 PM PT

    The site presents a largely stable picture, with the positions of the heavy machinery and the extent of the cleared area holding steady.

  15. Construction camera frame at 2:15 PM PT. The excavator closest to the bottom of the frame is now positioned with its boom extended, appearing to be moving material within the cut. Otherwise, the scene’s overall appearance remains consistent.
    2:15 PM PT

    The excavator closest to the bottom of the frame is now positioned with its boom extended, appearing to be moving material within the cut. Otherwise, the scene’s overall appearance remains consistent.

  16. Construction camera frame at 2:00 PM PT. A small dark-colored vehicle has entered the site via the driveway on the left, positioning itself near the center of the frame. The rest of the scene remains remarkably similar to the previous view.
    2:00 PM PT

    A small dark-colored vehicle has entered the site via the driveway on the left, positioning itself near the center of the frame. The rest of the scene remains remarkably similar to the previous view.

  17. Construction camera frame at 1:45 PM PT. The site remains quiet, with the positions of the earthmoving equipment appearing consistent between views.
    1:45 PM PT

    The site remains quiet, with the positions of the earthmoving equipment appearing consistent between views.

  18. Construction camera frame at 1:30 PM PT. A cluster of workers in high-visibility vests is now visible near the center of the site, close to one of the excavators. The rest of the scene shows a consistent pattern of equipment and cleared earth.
    1:30 PM PT

    A cluster of workers in high-visibility vests is now visible near the center of the site, close to one of the excavators. The rest of the scene shows a consistent pattern of equipment and cleared earth.

  19. Construction camera frame at 1:15 PM PT. A dump truck is now departing the site via the driveway on the left, having been positioned near the center in the prior view. Otherwise, the equipment and cleared ground maintain their positions.
    1:15 PM PT

    A dump truck is now departing the site via the driveway on the left, having been positioned near the center in the prior view. Otherwise, the equipment and cleared ground maintain their positions.

  20. 3 similar no-change frames12:30 PM–1:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:00 PM PT. The arrangement of equipment across the site appears largely unchanged, though one of the excavators near the lower right corner seems to have shifted slightly.
      1:00 PM PT

      The arrangement of equipment across the site appears largely unchanged, though one of the excavators near the lower right corner seems to have shifted slightly.

    2. Construction camera frame at 12:45 PM PT. The scene presents a nearly identical view, with no discernible movement of equipment or personnel in the last fifteen minutes.
      12:45 PM PT

      The scene presents a nearly identical view, with no discernible movement of equipment or personnel in the last fifteen minutes.

    3. Construction camera frame at 12:30 PM PT. The overall scene is holding steady, with the heavy equipment remaining in roughly the same locations.
      12:30 PM PT

      The overall scene is holding steady, with the heavy equipment remaining in roughly the same locations.

  21. Construction camera frame at 12:15 PM PT. A truck has entered the site from the driveway on the left, and is now positioned near the center of the cleared area. Beyond that, the scene appears remarkably similar to the previous view.
    12:15 PM PT

    A truck has entered the site from the driveway on the left, and is now positioned near the center of the cleared area. Beyond that, the scene appears remarkably similar to the previous view.

  22. Construction camera frame at 12:00 PM PT. A small group of people has appeared near the center of the site, standing alongside a yellow vehicle. Otherwise, the layout of machinery and the cleared area remain consistent between these views.
    12:00 PM PT

    A small group of people has appeared near the center of the site, standing alongside a yellow vehicle. Otherwise, the layout of machinery and the cleared area remain consistent between these views.

  23. Construction camera frame at 11:45 AM PT. The scene is stable, with the arrangement of equipment and the expanse of cleared ground remaining consistent.
    11:45 AM PT

    The scene is stable, with the arrangement of equipment and the expanse of cleared ground remaining consistent.

  24. Construction camera frame at 11:30 AM PT. The scene remains quiet, with no obvious shifts in equipment positions or activity over the past fifteen minutes.
    11:30 AM PT

    The scene remains quiet, with no obvious shifts in equipment positions or activity over the past fifteen minutes.

  25. Construction camera frame at 11:15 AM PT. The site’s appearance is largely unchanged, with the equipment remaining in the same positions as before.
    11:15 AM PT

    The site’s appearance is largely unchanged, with the equipment remaining in the same positions as before.

  26. Construction camera frame at 11:00 AM PT. A yellow excavator near the center of the frame has rotated slightly to the right.
    11:00 AM PT

    A yellow excavator near the center of the frame has rotated slightly to the right.

  27. Construction camera frame at 10:45 AM PT. The site shows very little alteration in the last fifteen minutes, with all visible machinery remaining in the same locations.
    10:45 AM PT

    The site shows very little alteration in the last fifteen minutes, with all visible machinery remaining in the same locations.

  28. Construction camera frame at 10:30 AM PT. The scene is holding steady, with the equipment and exposed ground appearing much as they did moments ago.
    10:30 AM PT

    The scene is holding steady, with the equipment and exposed ground appearing much as they did moments ago.

  29. Construction camera frame at 10:15 AM PT. The site presents a remarkably similar picture to the last check, with the machines and materials staying put.
    10:15 AM PT

    The site presents a remarkably similar picture to the last check, with the machines and materials staying put.

  30. Construction camera frame at 10:00 AM PT. The arrangement of equipment across the site appears stable, with no discernible movement in the last quarter hour.
    10:00 AM PT

    The arrangement of equipment across the site appears stable, with no discernible movement in the last quarter hour.

  31. Construction camera frame at 9:45 AM PT. The overall layout of the site remains consistent, with no obvious shifts in equipment or material placement.
    9:45 AM PT

    The overall layout of the site remains consistent, with no obvious shifts in equipment or material placement.

  32. Construction camera frame at 9:30 AM PT. The site remains largely unchanged, with the heavy equipment holding its positions across the cleared area.
    9:30 AM PT

    The site remains largely unchanged, with the heavy equipment holding its positions across the cleared area.

  33. Construction camera frame at 9:15 AM PT. A yellow excavator has shifted position slightly in the lower center of the site, now angled toward the pile of debris.
    9:15 AM PT

    A yellow excavator has shifted position slightly in the lower center of the site, now angled toward the pile of debris.

  34. Construction camera frame at 9:00 AM PT. The site shows a consistent state, with equipment remaining in largely the same locations as before.
    9:00 AM PT

    The site shows a consistent state, with equipment remaining in largely the same locations as before.

  35. Construction camera frame at 8:45 AM PT. Everything on site appears to be holding its position, with no readily apparent alterations in the last fifteen minutes.
    8:45 AM PT

    Everything on site appears to be holding its position, with no readily apparent alterations in the last fifteen minutes.

  36. 2 similar no-change frames8:15 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. The scene presents a static view, with the positions of the machinery and materials appearing consistent between the two captures.
      8:30 AM PT

      The scene presents a static view, with the positions of the machinery and materials appearing consistent between the two captures.

    2. Construction camera frame at 8:15 AM PT. No significant movement or changes are visible across the site.
      8:15 AM PT

      No significant movement or changes are visible across the site.

  37. Construction camera frame at 8:00 AM PT. The arrangement of equipment on site shows very little variation from the previous view.
    8:00 AM PT

    The arrangement of equipment on site shows very little variation from the previous view.

  38. Construction camera frame at 7:45 AM PT. The equipment layout is remarkably stable, with no clear movement of machines or vehicles in the last quarter of an hour.
    7:45 AM PT

    The equipment layout is remarkably stable, with no clear movement of machines or vehicles in the last quarter of an hour.

  39. Construction camera frame at 7:30 AM PT. The site remains quiet, with no noticeable shifts in equipment positions over the last fifteen minutes.
    7:30 AM PT

    The site remains quiet, with no noticeable shifts in equipment positions over the last fifteen minutes.

  40. Construction camera frame at 7:15 AM PT. A white dump truck has pulled into the site from the left driveway and is now positioned near the excavator in the lower-left quadrant.
    7:15 AM PT

    A white dump truck has pulled into the site from the left driveway and is now positioned near the excavator in the lower-left quadrant.

  41. Construction camera frame at 7:00 AM PT. The site appears largely unchanged, with the arrangement of machinery staying consistent over the last fifteen minutes.
    7:00 AM PT

    The site appears largely unchanged, with the arrangement of machinery staying consistent over the last fifteen minutes.

  42. Construction camera frame at 6:45 AM PT. The site displays a largely consistent picture, with equipment remaining in similar positions.
    6:45 AM PT

    The site displays a largely consistent picture, with equipment remaining in similar positions.

  43. Construction camera frame at 6:30 AM PT. The scene is holding steady, with the equipment appearing in the same arrangement as before.
    6:30 AM PT

    The scene is holding steady, with the equipment appearing in the same arrangement as before.

  44. Construction camera frame at 6:15 AM PT. The overall scene presents a very similar appearance to the previous view.
    6:15 AM PT

    The overall scene presents a very similar appearance to the previous view.

  45. 2 similar no-change frames5:45 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. Activity on site is minimal, with the equipment remaining in roughly the same locations as before.
      6:00 AM PT

      Activity on site is minimal, with the equipment remaining in roughly the same locations as before.

    2. Construction camera frame at 5:45 AM PT. The scene remains quite static, with no apparent movement of equipment or vehicles.
      5:45 AM PT

      The scene remains quite static, with no apparent movement of equipment or vehicles.

  46. Construction camera frame at 5:30 AM PT. One of the excavators near the center of the site has shifted its position slightly.
    5:30 AM PT

    One of the excavators near the center of the site has shifted its position slightly.

  47. 7 similar no-change frames12:00 AM–5:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 AM PT. The site appears largely unchanged, though visibility has improved with the increasing light.
      5:15 AM PT

      The site appears largely unchanged, though visibility has improved with the increasing light.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.