Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, July 18, 2026

Construction log

Saturday, July 18, 2026

73 snapshots from the live camera.


AI digest

The site changed substantially over the week: a broad central cut is now visible, with several earthmoving machines positioned within and around it. Activity was minimal today; the equipment mostly stayed in place, with only slight repositioning noted and a small white vehicle appearing near the left driveway.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 16 similar no-change frames5:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:15 PM PT. The site shows no significant alterations, with all visible machinery and vehicles holding their positions.
      6:15 PM PT

      The site shows no significant alterations, with all visible machinery and vehicles holding their positions.

    15. Construction camera frame at 6:00 PM PT. The site holds a consistent appearance, with no discernible changes to the position of equipment or vehicles.
      6:00 PM PT

      The site holds a consistent appearance, with no discernible changes to the position of equipment or vehicles.

    16. Construction camera frame at 5:45 PM PT. The scene presents a largely static view, with equipment appearing to remain in the same locations as before.
      5:45 PM PT

      The scene presents a largely static view, with equipment appearing to remain in the same locations as before.

  3. Construction camera frame at 5:30 PM PT. The arrangement of machinery across the site has not altered in the last fifteen minutes.
    5:30 PM PT

    The arrangement of machinery across the site has not altered in the last fifteen minutes.

  4. Construction camera frame at 5:15 PM PT. The site appears quiet, with no apparent shifts in the location of any machinery or vehicles.
    5:15 PM PT

    The site appears quiet, with no apparent shifts in the location of any machinery or vehicles.

  5. Construction camera frame at 5:00 PM PT. The scene remains quite still, with no noticeable repositioning of equipment or vehicles during the last quarter-hour.
    5:00 PM PT

    The scene remains quite still, with no noticeable repositioning of equipment or vehicles during the last quarter-hour.

  6. Construction camera frame at 4:45 PM PT. EverythingSCno movement is visible across the site, with all vehicles and machinery remaining stationary.
    4:45 PM PT

    EverythingSCno movement is visible across the site, with all vehicles and machinery remaining stationary.

  7. Construction camera frame at 4:30 PM PT. The equipment remains in largely the same positions, although the excavator closest to the street on the right side has turned slightly.
    4:30 PM PT

    The equipment remains in largely the same positions, although the excavator closest to the street on the right side has turned slightly.

  8. 11 similar no-change frames1:45 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. Activity on site is minimal, as the positions of the excavators and other equipment appear to be largely unchanged.
      4:15 PM PT

      Activity on site is minimal, as the positions of the excavators and other equipment appear to be largely unchanged.

    2. Construction camera frame at 4:00 PM PT. The site presents a largely static view, with equipment positions holding steady over the last fifteen minutes.
      4:00 PM PT

      The site presents a largely static view, with equipment positions holding steady over the last fifteen minutes.

    3. Construction camera frame at 3:45 PM PT. The equipment layout is largely unchanged, though one of the excavators near the center of the site appears to have shifted slightly to the right.
      3:45 PM PT

      The equipment layout is largely unchanged, though one of the excavators near the center of the site appears to have shifted slightly to the right.

    4. Construction camera frame at 3:30 PM PT. The machines on the site appear to be holding their positions, with no observable shifts in their locations.
      3:30 PM PT

      The machines on the site appear to be holding their positions, with no observable shifts in their locations.

    5. Construction camera frame at 3:15 PM PT. The site shows no significant alterations in the last fifteen minutes, with all visible equipment maintaining its prior location.
      3:15 PM PT

      The site shows no significant alterations in the last fifteen minutes, with all visible equipment maintaining its prior location.

    6. Construction camera frame at 3:00 PM PT. The arrangement of equipment across the site remains consistent, with no noticeable changes in position over the last fifteen minutes.
      3:00 PM PT

      The arrangement of equipment across the site remains consistent, with no noticeable changes in position over the last fifteen minutes.

    7. Construction camera frame at 2:45 PM PT. The site remains quiet, with no discernible shifts in the positions of the machinery or materials.
      2:45 PM PT

      The site remains quiet, with no discernible shifts in the positions of the machinery or materials.

    8. Construction camera frame at 2:30 PM PT. The equipment on site holds its positions, showing no apparent movement in the last quarter hour.
      2:30 PM PT

      The equipment on site holds its positions, showing no apparent movement in the last quarter hour.

    9. Construction camera frame at 2:15 PM PT. The scene presents a steady state, with the positions of the machines and materials appearing virtually identical to the previous view.
      2:15 PM PT

      The scene presents a steady state, with the positions of the machines and materials appearing virtually identical to the previous view.

    10. Construction camera frame at 2:00 PM PT. The scene appears largely unchanged, with the positions of the heavy machinery consistent between these views.
      2:00 PM PT

      The scene appears largely unchanged, with the positions of the heavy machinery consistent between these views.

    11. Construction camera frame at 1:45 PM PT. Everything remains in place across the block with no new activity detected.
      1:45 PM PT

      Everything remains in place across the block with no new activity detected.

  9. Construction camera frame at 1:30 PM PT. Activity on site appears minimal, with the locations of the excavators and trucks remaining essentially the same.
    1:30 PM PT

    Activity on site appears minimal, with the locations of the excavators and trucks remaining essentially the same.

  10. Construction camera frame at 1:15 PM PT. The site displays a continuing pattern of stability, with the positions of the earthmoving equipment appearing almost identical to the last view.
    1:15 PM PT

    The site displays a continuing pattern of stability, with the positions of the earthmoving equipment appearing almost identical to the last view.

  11. Construction camera frame at 1:00 PM PT. The site remains quiet, with no discernible changes in the placement of equipment or materials.
    1:00 PM PT

    The site remains quiet, with no discernible changes in the placement of equipment or materials.

  12. Construction camera frame at 12:45 PM PT. The arrangement of equipment and materials remains consistent between these views of the site.
    12:45 PM PT

    The arrangement of equipment and materials remains consistent between these views of the site.

  13. 4 similar no-change frames11:45 AM–12:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:30 PM PT. No movement is visible across the site between these two frames.
      12:30 PM PT

      No movement is visible across the site between these two frames.

    2. Construction camera frame at 12:15 PM PT. The site's appearance is remarkably unchanged over the last fifteen minutes, with no immediately obvious shifts in equipment or activity.
      12:15 PM PT

      The site's appearance is remarkably unchanged over the last fifteen minutes, with no immediately obvious shifts in equipment or activity.

    3. Construction camera frame at 12:00 PM PT. The site presents a similar view as before, with the positioning of the heavy machinery appearing largely static.
      12:00 PM PT

      The site presents a similar view as before, with the positioning of the heavy machinery appearing largely static.

    4. Construction camera frame at 11:45 AM PT. The scene is holding steady, with the machines and materials remaining in roughly the same locations as before.
      11:45 AM PT

      The scene is holding steady, with the machines and materials remaining in roughly the same locations as before.

  14. Construction camera frame at 11:30 AM PT. Activity on site is minimal, though a small, dark-colored piece of equipment has appeared near the center of the frame.
    11:30 AM PT

    Activity on site is minimal, though a small, dark-colored piece of equipment has appeared near the center of the frame.

  15. Construction camera frame at 11:15 AM PT. The overall picture at the site is largely similar to what we observed a few minutes prior.
    11:15 AM PT

    The overall picture at the site is largely similar to what we observed a few minutes prior.

  16. Construction camera frame at 11:00 AM PT. The site appears quite stable, with no discernible movement of equipment or vehicles in the last quarter of an hour.
    11:00 AM PT

    The site appears quite stable, with no discernible movement of equipment or vehicles in the last quarter of an hour.

  17. Construction camera frame at 10:45 AM PT. The arrangement of equipment across the site remains consistent, although one of the excavators near the center appears to have shifted its position slightly.
    10:45 AM PT

    The arrangement of equipment across the site remains consistent, although one of the excavators near the center appears to have shifted its position slightly.

  18. Construction camera frame at 10:30 AM PT. The scene appears largely unchanged, though a small white vehicle has entered the site via the driveway on the left.
    10:30 AM PT

    The scene appears largely unchanged, though a small white vehicle has entered the site via the driveway on the left.

  19. Construction camera frame at 10:15 AM PT. The site continues to show minimal variation, with the positions of the machines appearing constant.
    10:15 AM PT

    The site continues to show minimal variation, with the positions of the machines appearing constant.

  20. Construction camera frame at 10:00 AM PT. The site remains remarkably static, with no obvious shifts in equipment placement or activity.
    10:00 AM PT

    The site remains remarkably static, with no obvious shifts in equipment placement or activity.

  21. Construction camera frame at 9:45 AM PT. The heavy equipment remains in essentially the same arrangement as it was moments ago.
    9:45 AM PT

    The heavy equipment remains in essentially the same arrangement as it was moments ago.

  22. 2 similar no-change frames9:15 AM–9:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:30 AM PT. The site presents a consistent picture, with all visible machinery remaining in the same positions as before.
      9:30 AM PT

      The site presents a consistent picture, with all visible machinery remaining in the same positions as before.

    2. Construction camera frame at 9:15 AM PT. The site's appearance is nearly identical to the last view, with no noticeable shifts in the positions of the heavy machinery.
      9:15 AM PT

      The site's appearance is nearly identical to the last view, with no noticeable shifts in the positions of the heavy machinery.

  23. Construction camera frame at 9:00 AM PT. Nothing has moved across the site since the previous frame.
    9:00 AM PT

    Nothing has moved across the site since the previous frame.

  24. Construction camera frame at 8:45 AM PT. The scene is largely unchanged, with machines appearing to remain in the same locations as they were fifteen minutes ago.
    8:45 AM PT

    The scene is largely unchanged, with machines appearing to remain in the same locations as they were fifteen minutes ago.

  25. Construction camera frame at 8:30 AM PT. Activity on the site appears minimal, with equipment holding its positions from the previous view.
    8:30 AM PT

    Activity on the site appears minimal, with equipment holding its positions from the previous view.

  26. Construction camera frame at 8:15 AM PT. The view of the site remains remarkably static, showing no clear movement of equipment or materials in the last fifteen minutes.
    8:15 AM PT

    The view of the site remains remarkably static, showing no clear movement of equipment or materials in the last fifteen minutes.

  27. Construction camera frame at 8:00 AM PT. The overall layout of the site remains consistent, with no obvious changes to equipment positioning during the last fifteen minutes.
    8:00 AM PT

    The overall layout of the site remains consistent, with no obvious changes to equipment positioning during the last fifteen minutes.

  28. Construction camera frame at 7:45 AM PT. The site presents a similar picture as fifteen minutes ago, with no readily apparent alterations in equipment locations.
    7:45 AM PT

    The site presents a similar picture as fifteen minutes ago, with no readily apparent alterations in equipment locations.

  29. 16 similar no-change frames12:00 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The arrangement of machinery on site appears stable, with no significant movement detected in the past fifteen minutes.
      7:30 AM PT

      The arrangement of machinery on site appears stable, with no significant movement detected in the past fifteen minutes.

    2. Construction camera frame at 7:15 AM PT. The equipment arrangement remains consistent, with no noticeable shifts in position over the last quarter hour.
      7:15 AM PT

      The equipment arrangement remains consistent, with no noticeable shifts in position over the last quarter hour.

    3. Construction camera frame at 7:00 AM PT. The scene appears largely unchanged in the last fifteen minutes.
      7:00 AM PT

      The scene appears largely unchanged in the last fifteen minutes.

    4. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 5:15 AM PT. No construction activity — the site is quiet.
      5:15 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.