Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, July 29, 2026

Construction log

Wednesday, July 29, 2026

69 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

Across the day, several excavators on the site shifted positions and orientations, with one excavator in the foreground moving slightly back and extending its arm, and another near the center moving forward to work a new area. A small amount of material was moved from the center towards the northeast corner, and various vehicles entered and exited the driveway on the left.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  7. The scene remains remarkably still, with no discernible shifts in machine placement or material distribution.
    7:45 PM PT

    The scene remains remarkably still, with no discernible shifts in machine placement or material distribution.

  8. The site presents a largely unchanged view, with machines and stockpiles holding their positions.
    7:30 PM PT

    The site presents a largely unchanged view, with machines and stockpiles holding their positions.

  9. The overall scene holds steady, with equipment and material arrangements appearing consistent between views.
    7:15 PM PT

    The overall scene holds steady, with equipment and material arrangements appearing consistent between views.

  10. EverythingPSno movement is detected, as the machinery and material piles remain in their previous positions.
    7:00 PM PT

    EverythingPSno movement is detected, as the machinery and material piles remain in their previous positions.

  11. NoLSSno significant movement is visible across the site, and all machinery remains in place.
    6:45 PM PT

    NoLSSno significant movement is visible across the site, and all machinery remains in place.

  12. Activity on site is minimal, with the machines maintaining their prior locations and orientations.
    6:30 PM PT

    Activity on site is minimal, with the machines maintaining their prior locations and orientations.

  13. The equipment arrangement appears static, with no noticeable repositioning of machines or materials across the site.
    6:15 PM PT

    The equipment arrangement appears static, with no noticeable repositioning of machines or materials across the site.

  14. The scene remains stable, with the machinery and material layout appearing unchanged from the previous view.
    6:00 PM PT

    The scene remains stable, with the machinery and material layout appearing unchanged from the previous view.

  15. The site appears quiet, with no discernible shifts in equipment positions or material stockpiles.
    5:45 PM PT

    The site appears quiet, with no discernible shifts in equipment positions or material stockpiles.

  16. The scene shows minimal alteration, as the machines and material distribution appear stable.
    5:30 PM PT

    The scene shows minimal alteration, as the machines and material distribution appear stable.

  17. The arrangement of equipment across the site remains largely as it was, with no significant movement visible.
    5:15 PM PT

    The arrangement of equipment across the site remains largely as it was, with no significant movement visible.

  18. The scene is remarkably consistent, with the heavy equipment remaining in essentially the same positions.
    4:45 PM PT

    The scene is remarkably consistent, with the heavy equipment remaining in essentially the same positions.

  19. A white van has entered the site via the driveway on the left, parking among other vehicles.
    4:30 PM PT

    A white van has entered the site via the driveway on the left, parking among other vehicles.

  20. The site presents a nearly identical view, with the equipment maintaining its previous distribution.
    4:15 PM PT

    The site presents a nearly identical view, with the equipment maintaining its previous distribution.

  21. The equipment arrangement appears unchanged, though a small amount of material has been moved from the center toward the northeast corner.
    4:00 PM PT

    The equipment arrangement appears unchanged, though a small amount of material has been moved from the center toward the northeast corner.

  22. The site appears largely static, with the positions of the machines remaining consistent between views.
    3:45 PM PT

    The site appears largely static, with the positions of the machines remaining consistent between views.

  23. The overall layout of the site remains stable, with no readily apparent shifts in the positions of the larger machines.
    3:30 PM PT

    The overall layout of the site remains stable, with no readily apparent shifts in the positions of the larger machines.

  24. The scene shows minimal alteration, with the equipment largely remaining in the same positions as previously observed.
    3:15 PM PT

    The scene shows minimal alteration, with the equipment largely remaining in the same positions as previously observed.

  25. The scene remains remarkably similar, with the machines holding their positions across the site.
    3:00 PM PT

    The scene remains remarkably similar, with the machines holding their positions across the site.

  26. The arrangement of the heavy equipment remains consistent, though one excavator near the bottom of the frame appears to have shifted its position slightly.
    2:45 PM PT

    The arrangement of the heavy equipment remains consistent, though one excavator near the bottom of the frame appears to have shifted its position slightly.

  27. The tracked machine near the center of the site has rotated slightly to the right.
    2:30 PM PT

    The tracked machine near the center of the site has rotated slightly to the right.

  28. The site presents a similar view as before, with the arrangement of equipment appearing largely unchanged.
    2:15 PM PT

    The site presents a similar view as before, with the arrangement of equipment appearing largely unchanged.

  29. The site appears largely static, with the positions of the tracked machines and vehicles holding steady.
    2:00 PM PT

    The site appears largely static, with the positions of the tracked machines and vehicles holding steady.

  30. The heavy machinery maintains its current layout, with no apparent shifts in position during the last fifteen minutes.
    1:45 PM PT

    The heavy machinery maintains its current layout, with no apparent shifts in position during the last fifteen minutes.

  31. The equipment arrangement appears stable, with no significant changes to the positions of the excavators or the dozer.
    1:30 PM PT

    The equipment arrangement appears stable, with no significant changes to the positions of the excavators or the dozer.

  32. The scene remains consistent, with the equipment largely holding its positions from the previous view.
    1:15 PM PT

    The scene remains consistent, with the equipment largely holding its positions from the previous view.

  33. The excavator closest to the bottom of the frame has shifted its position slightly, now angled a bit more towards the center of the site.
    1:00 PM PT

    The excavator closest to the bottom of the frame has shifted its position slightly, now angled a bit more towards the center of the site.

  34. The arrangement of heavy equipment remains largely unchanged, though a small white vehicle has joined the line near the driveway on the left.
    12:45 PM PT

    The arrangement of heavy equipment remains largely unchanged, though a small white vehicle has joined the line near the driveway on the left.

  35. A red and black truck has entered the site via the driveway on the left and is positioned near the center.
    12:30 PM PT

    A red and black truck has entered the site via the driveway on the left and is positioned near the center.

  36. A slight repositioning of the excavator near the center shows it now facing more directly towards the northeast corner of the site.
    12:15 PM PT

    A slight repositioning of the excavator near the center shows it now facing more directly towards the northeast corner of the site.

  37. The scene is holding steady, with no noticeable shifts in equipment positions or vehicle traffic over the past few minutes.
    12:00 PM PT

    The scene is holding steady, with no noticeable shifts in equipment positions or vehicle traffic over the past few minutes.

  38. The arrangement of machines across the site appears remarkably static, though a few more vehicles are now lined up near the left-side driveway.
    11:45 AM PT

    The arrangement of machines across the site appears remarkably static, though a few more vehicles are now lined up near the left-side driveway.

  39. One of the excavators closer to the center of the site has clearly moved forward, and appears to be working a new area. Otherwise, the arrangement of equipment and vehicles remains consistent.
    11:30 AM PT

    One of the excavators closer to the center of the site has clearly moved forward, and appears to be working a new area. Otherwise, the arrangement of equipment and vehicles remains consistent.

  40. The excavator closest to the foreground is now positioned slightly further back from where it was, and a few additional vehicles are visible near the driveway on the left.
    11:15 AM PT

    The excavator closest to the foreground is now positioned slightly further back from where it was, and a few additional vehicles are visible near the driveway on the left.

  41. The excavator in the foreground is now angled more sharply towards the center of the site, and its arm is extended.
    11:00 AM PT

    The excavator in the foreground is now angled more sharply towards the center of the site, and its arm is extended.

  42. The excavator near the center of the frame has rotated slightly to the left, and a truck is now exiting the driveway on the left side of the image.
    10:45 AM PT

    The excavator near the center of the frame has rotated slightly to the left, and a truck is now exiting the driveway on the left side of the image.

  43. The scene remains stable, with the positions of equipment and vehicles appearing largely unchanged over the last quarter of an hour.
    10:30 AM PT

    The scene remains stable, with the positions of equipment and vehicles appearing largely unchanged over the last quarter of an hour.

  44. A handful of vehicles have gathered near the driveway on the left, and the excavator closest to the foreground appears to have shifted its orientation slightly.
    10:15 AM PT

    A handful of vehicles have gathered near the driveway on the left, and the excavator closest to the foreground appears to have shifted its orientation slightly.

  45. Activity on the site remains minimal, with the machinery largely holding steady in their previous positions.
    10:00 AM PT

    Activity on the site remains minimal, with the machinery largely holding steady in their previous positions.

  46. The central excavator that was facing slightly left has now turned further to the right, and a small blue vehicle is visible near the driveway on the left.
    9:45 AM PT

    The central excavator that was facing slightly left has now turned further to the right, and a small blue vehicle is visible near the driveway on the left.

  47. The site appears much the same as before, with the machines maintaining their general locations within the work area.
    9:30 AM PT

    The site appears much the same as before, with the machines maintaining their general locations within the work area.

  48. The equipment across the site holds its positions, with no immediately apparent shifts in the last fifteen minutes.
    9:15 AM PT

    The equipment across the site holds its positions, with no immediately apparent shifts in the last fifteen minutes.

  49. A light-colored truck has entered the driveway on the left side of the frame, and one of the excavators near the center has rotated slightly to the right.
    9:00 AM PT

    A light-colored truck has entered the driveway on the left side of the frame, and one of the excavators near the center has rotated slightly to the right.

  50. AS aH-2000 a small red vehicle has entered the parking area on the left, and anB-2000 one of the central excavators has shifted its position slightly.
    8:45 AM PT

    AS aH-2000 a small red vehicle has entered the parking area on the left, and anB-2000 one of the central excavators has shifted its position slightly.

  51. The arrangement of equipment across the site appears stable, with no obvious movements in the last quarter of an hour.
    8:30 AM PT

    The arrangement of equipment across the site appears stable, with no obvious movements in the last quarter of an hour.

  52. The scene remains remarkably consistent, with the machines all holding their earlier positions across the work area.
    8:15 AM PT

    The scene remains remarkably consistent, with the machines all holding their earlier positions across the work area.

  53. The site presents a largely static view, with the machinery appearing to remain in the same locations.
    8:00 AM PT

    The site presents a largely static view, with the machinery appearing to remain in the same locations.

  54. The work area shows no noticeable differences, with the machines all appearing to stay put since the last view.
    7:45 AM PT

    The work area shows no noticeable differences, with the machines all appearing to stay put since the last view.

  55. The large work area appears unchanged, with the machines maintaining their positions from the previous view.
    7:30 AM PT

    The large work area appears unchanged, with the machines maintaining their positions from the previous view.

  56. The equipment on the site remains in essentially the same arrangement as it was fifteen minutes ago.
    7:15 AM PT

    The equipment on the site remains in essentially the same arrangement as it was fifteen minutes ago.

  57. The machinery across the site maintains its earlier positions, showing no discernible shifts in the last fifteen minutes.
    7:00 AM PT

    The machinery across the site maintains its earlier positions, showing no discernible shifts in the last fifteen minutes.

  58. The equipment arrangement across the site holds its earlier pattern, with no visible shifts in position over the last quarter hour.
    6:45 AM PT

    The equipment arrangement across the site holds its earlier pattern, with no visible shifts in position over the last quarter hour.

  59. The scene remains remarkably consistent, with the machinery holding steady in its positions across the site.
    6:30 AM PT

    The scene remains remarkably consistent, with the machinery holding steady in its positions across the site.

  60. The site presents a consistent view, with the heavy equipment remaining in the same locations as before.
    6:15 AM PT

    The site presents a consistent view, with the heavy equipment remaining in the same locations as before.

  61. The scene appears static, with equipment holding its positions across the work area.
    6:00 AM PT

    The scene appears static, with equipment holding its positions across the work area.

  62. The arrangement of machinery on site remains largely unchanged over the past fifteen minutes.
    5:45 AM PT

    The arrangement of machinery on site remains largely unchanged over the past fifteen minutes.

  63. The site is now visible in daylight, revealing several pieces of heavy machinery across the graded area. Conditions appear stable with no apparent movement of equipment or vehicles between the frames.
    5:30 AM PT

    The site is now visible in daylight, revealing several pieces of heavy machinery across the graded area. Conditions appear stable with no apparent movement of equipment or vehicles between the frames.

  64. No construction activity — the site is quiet.
    5:00 AM PT

    No construction activity — the site is quiet.

  65. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  66. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  67. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  68. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  69. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jul 28All daysJul 30 →