Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, July 30, 2026

Construction log

Thursday, July 30, 2026

71 snapshots from the live camera.


AI digest

The site remained largely quiet, with most equipment holding position and only minor repositioning and vehicle movements during the day. Compared with July 23, the central graded area appears more uniformly leveled, though no major new change is evident between today’s first and last frames.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Construction camera frame at 9:00 PM PT. The overall scene remains remarkably consistent, with equipment and materials holding their positions.
    9:00 PM PT

    The overall scene remains remarkably consistent, with equipment and materials holding their positions.

  4. 3 similar no-change frames8:15 PM–8:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 PM PT. The site maintains a stable appearance, with no apparent shifts in equipment positions or material stockpiles.
      8:45 PM PT

      The site maintains a stable appearance, with no apparent shifts in equipment positions or material stockpiles.

    2. Construction camera frame at 8:30 PM PT. The site presents a consistent view, with no discernible movement of machinery or materials in the last fifteen minutes.
      8:30 PM PT

      The site presents a consistent view, with no discernible movement of machinery or materials in the last fifteen minutes.

    3. Construction camera frame at 8:15 PM PT. The scene appears largely static, with the machines and materials remaining in their previous locations.
      8:15 PM PT

      The scene appears largely static, with the machines and materials remaining in their previous locations.

  5. Construction camera frame at 8:00 PM PT. The arrangement of equipment on site seems to have held steady, though the shadows have shifted with the sun.
    8:00 PM PT

    The arrangement of equipment on site seems to have held steady, though the shadows have shifted with the sun.

  6. Construction camera frame at 7:45 PM PT. The equipment arrangement appears nearly unchanged, though a white trailer now sits near the center of the site.
    7:45 PM PT

    The equipment arrangement appears nearly unchanged, though a white trailer now sits near the center of the site.

  7. Construction camera frame at 7:30 PM PT. A single white van has entered the site via the driveway on the left side of the frame.
    7:30 PM PT

    A single white van has entered the site via the driveway on the left side of the frame.

  8. Construction camera frame at 7:15 PM PT. NoCranes and equipment remain in the same positions across the site.
    7:15 PM PT

    NoCranes and equipment remain in the same positions across the site.

  9. Construction camera frame at 7:00 PM PT. The site maintains its current appearance, with no obvious shifts in equipment or materials over the last quarter of an hour.
    7:00 PM PT

    The site maintains its current appearance, with no obvious shifts in equipment or materials over the last quarter of an hour.

  10. Construction camera frame at 6:45 PM PT. The site’s layout remains consistent, with the heavy equipment holding its positions across the graded area.
    6:45 PM PT

    The site’s layout remains consistent, with the heavy equipment holding its positions across the graded area.

  11. Construction camera frame at 6:30 PM PT. The scene appears largely static, with no discernible changes to the equipment positions or site layout.
    6:30 PM PT

    The scene appears largely static, with no discernible changes to the equipment positions or site layout.

  12. Construction camera frame at 6:15 PM PT. The machines on site haven't shifted position, maintaining the same layout as before.
    6:15 PM PT

    The machines on site haven't shifted position, maintaining the same layout as before.

  13. Construction camera frame at 6:00 PM PT. The site presents a consistent view, as the positions of the equipment and materials appear unchanged from the last check-in.
    6:00 PM PT

    The site presents a consistent view, as the positions of the equipment and materials appear unchanged from the last check-in.

  14. Construction camera frame at 5:45 PM PT. The arrangement of machinery across the site continues without apparent alteration.
    5:45 PM PT

    The arrangement of machinery across the site continues without apparent alteration.

  15. 3 similar no-change frames5:00 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The scene remains remarkably still, with no noticeable movement of equipment or vehicles in the last fifteen minutes.
      5:30 PM PT

      The scene remains remarkably still, with no noticeable movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 5:15 PM PT. The equipment arrangement on site is holding steady, with no visible shifts in position over the past fifteen minutes.
      5:15 PM PT

      The equipment arrangement on site is holding steady, with no visible shifts in position over the past fifteen minutes.

    3. Construction camera frame at 5:00 PM PT. The overall layout of the site appears unchanged, with all visible machinery holding its previous location.
      5:00 PM PT

      The overall layout of the site appears unchanged, with all visible machinery holding its previous location.

  16. Construction camera frame at 4:45 PM PT. An orange utility vehicle has appeared near the right edge of the site, having not been present in the previous view.
    4:45 PM PT

    An orange utility vehicle has appeared near the right edge of the site, having not been present in the previous view.

  17. Construction camera frame at 4:30 PM PT. The scene appears largely static, with the heavy equipment maintaining its previous positions across the site.
    4:30 PM PT

    The scene appears largely static, with the heavy equipment maintaining its previous positions across the site.

  18. Construction camera frame at 4:15 PM PT. Two excavators have moved into the left-hand trench area near the bottom of the frame, shifting positions since the last view.
    4:15 PM PT

    Two excavators have moved into the left-hand trench area near the bottom of the frame, shifting positions since the last view.

  19. Construction camera frame at 4:00 PM PT. The arrangement of equipment across the site remains consistent, showing no apparent repositioning in the last quarter hour.
    4:00 PM PT

    The arrangement of equipment across the site remains consistent, showing no apparent repositioning in the last quarter hour.

  20. Construction camera frame at 3:45 PM PT. A lone white pickup truck has entered the site through the driveway on the left side of the frame.
    3:45 PM PT

    A lone white pickup truck has entered the site through the driveway on the left side of the frame.

  21. Construction camera frame at 3:30 PM PT. The site continues to show a consistent appearance, with the positions of equipment and materials largely unchanged.
    3:30 PM PT

    The site continues to show a consistent appearance, with the positions of equipment and materials largely unchanged.

  22. Construction camera frame at 3:15 PM PT. A few figures are now visible near the center of the site, though the machinery positions have not altered.
    3:15 PM PT

    A few figures are now visible near the center of the site, though the machinery positions have not altered.

  23. 2 similar no-change frames2:45 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The overall scene remains quite similar, with no significant movement of equipment or materials readily apparent.
      3:00 PM PT

      The overall scene remains quite similar, with no significant movement of equipment or materials readily apparent.

    2. Construction camera frame at 2:45 PM PT. The site appears remarkably static, with no evident shifts in equipment or material placement over the last fifteen minutes.
      2:45 PM PT

      The site appears remarkably static, with no evident shifts in equipment or material placement over the last fifteen minutes.

  24. Construction camera frame at 2:30 PM PT. The scene presents a stable view, with machinery and materials holding their positions from the prior frame.
    2:30 PM PT

    The scene presents a stable view, with machinery and materials holding their positions from the prior frame.

  25. Construction camera frame at 2:15 PM PT. The equipment layout appears largely unchanged, though one smaller machine near the center of the site has turned slightly.
    2:15 PM PT

    The equipment layout appears largely unchanged, though one smaller machine near the center of the site has turned slightly.

  26. Construction camera frame at 2:00 PM PT. A white truck has repositioned along the central transit path, and one excavator near the center has adjusted its stance slightly — all other machinery and materials remain stationary.
    2:00 PM PT

    A white truck has repositioned along the central transit path, and one excavator near the center has adjusted its stance slightly — all other machinery and materials remain stationary.

  27. Construction camera frame at 1:45 PM PT. AnCSone excavator in the center of the site has shifted position, and a white truck has moved further along the central transit path. All other equipment and materials remain in place.
    1:45 PM PT

    AnCSone excavator in the center of the site has shifted position, and a white truck has moved further along the central transit path. All other equipment and materials remain in place.

  28. 5 similar no-change frames12:30 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The arrangement of equipment on the site remains consistent, with no discernible alterations in the positions of the machines or stockpiled materials.
      1:30 PM PT

      The arrangement of equipment on the site remains consistent, with no discernible alterations in the positions of the machines or stockpiled materials.

    2. Construction camera frame at 1:15 PM PT. The arrangement of machinery across the site holds steady, with no noticeable changes in position over the last quarter hour.
      1:15 PM PT

      The arrangement of machinery across the site holds steady, with no noticeable changes in position over the last quarter hour.

    3. Construction camera frame at 1:00 PM PT. Equipment positions across the site look consistent, with no observable shifts in machinery or material placement.
      1:00 PM PT

      Equipment positions across the site look consistent, with no observable shifts in machinery or material placement.

    4. Construction camera frame at 12:45 PM PT. The scene remains stable, with no apparent movement of equipment or vehicles during the last fifteen minutes.
      12:45 PM PT

      The scene remains stable, with no apparent movement of equipment or vehicles during the last fifteen minutes.

    5. Construction camera frame at 12:30 PM PT. The site appears largely unchanged, though sunlight has shifted slightly across the graded area.
      12:30 PM PT

      The site appears largely unchanged, though sunlight has shifted slightly across the graded area.

  29. Construction camera frame at 12:15 PM PT. The position of an excavator near the lower-center of the site appears to have been adjusted slightly. Otherwise, the machines and materials across the block maintain their previous arrangement.
    12:15 PM PT

    The position of an excavator near the lower-center of the site appears to have been adjusted slightly. Otherwise, the machines and materials across the block maintain their previous arrangement.

  30. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. A large dump truck is now exiting the site via the driveway on the left. Otherwise, the equipment and materials on site remain in largely the same positions.
      12:00 PM PT

      A large dump truck is now exiting the site via the driveway on the left. Otherwise, the equipment and materials on site remain in largely the same positions.

    2. Construction camera frame at 11:45 AM PT. The site presents a largely static view, with equipment remaining in the same general locations as before.
      11:45 AM PT

      The site presents a largely static view, with equipment remaining in the same general locations as before.

  31. Construction camera frame at 11:30 AM PT. The arrangement of equipment across the site remains remarkably consistent, with only subtle shifts in shadow positions visible.
    11:30 AM PT

    The arrangement of equipment across the site remains remarkably consistent, with only subtle shifts in shadow positions visible.

  32. Construction camera frame at 11:15 AM PT. Shadows have lengthened across the site, but the arrangement of equipment appears to be holding steady.
    11:15 AM PT

    Shadows have lengthened across the site, but the arrangement of equipment appears to be holding steady.

  33. Construction camera frame at 11:00 AM PT. The position of one of the excavators near the center of the site has shifted slightly. Otherwise, the arrangement of equipment and materials remains largely unchanged between the two views.
    11:00 AM PT

    The position of one of the excavators near the center of the site has shifted slightly. Otherwise, the arrangement of equipment and materials remains largely unchanged between the two views.

  34. Construction camera frame at 10:45 AM PT. The layout of machines and materials appears nearly identical to the prior view, though the sunlight continues to shift across the site.
    10:45 AM PT

    The layout of machines and materials appears nearly identical to the prior view, though the sunlight continues to shift across the site.

  35. Construction camera frame at 10:30 AM PT. The scene remains quite stable, with no noticeable changes in the positions of equipment or vehicles.
    10:30 AM PT

    The scene remains quite stable, with no noticeable changes in the positions of equipment or vehicles.

  36. Construction camera frame at 10:15 AM PT. The sun's angle has altered the shadows across the site, but the placement of equipment and materials appears consistent between the views.
    10:15 AM PT

    The sun's angle has altered the shadows across the site, but the placement of equipment and materials appears consistent between the views.

  37. Construction camera frame at 10:00 AM PT. The site presents a similar appearance to the previous view, with no obvious repositioning of heavy equipment or vehicles.
    10:00 AM PT

    The site presents a similar appearance to the previous view, with no obvious repositioning of heavy equipment or vehicles.

  38. Construction camera frame at 9:45 AM PT. Equipment locations are largely static, with only minor shifts in shadow patterns across the site.
    9:45 AM PT

    Equipment locations are largely static, with only minor shifts in shadow patterns across the site.

  39. Construction camera frame at 9:30 AM PT. A small, blue vehicle has moved from the lower-left to the center of the site. Otherwise, the equipment and materials across the block remain in similar positions.
    9:30 AM PT

    A small, blue vehicle has moved from the lower-left to the center of the site. Otherwise, the equipment and materials across the block remain in similar positions.

  40. Construction camera frame at 9:15 AM PT. The arrangement of machinery across the site appears largely unchanged, though shadows have shifted with the sun's movement.
    9:15 AM PT

    The arrangement of machinery across the site appears largely unchanged, though shadows have shifted with the sun's movement.

  41. Construction camera frame at 9:00 AM PT. A white van has entered the site from the driveway on the left and is now positioned near the center.
    9:00 AM PT

    A white van has entered the site from the driveway on the left and is now positioned near the center.

  42. Construction camera frame at 8:45 AM PT. The scene remains remarkably consistent, showing no discernible changes in equipment placement or site activity.
    8:45 AM PT

    The scene remains remarkably consistent, showing no discernible changes in equipment placement or site activity.

  43. Construction camera frame at 8:30 AM PT. The yellow excavator closest to the bottom of the frame has noticeably moved to the right.
    8:30 AM PT

    The yellow excavator closest to the bottom of the frame has noticeably moved to the right.

  44. 4 similar no-change frames7:30 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The site presents a stable picture, with all visible machinery remaining in the same positions as before.
      8:15 AM PT

      The site presents a stable picture, with all visible machinery remaining in the same positions as before.

    2. Construction camera frame at 8:00 AM PT. No significant shifts in the site's layout are apparent between these frames, though a small, dark-colored object has become visible near the center.
      8:00 AM PT

      No significant shifts in the site's layout are apparent between these frames, though a small, dark-colored object has become visible near the center.

    3. Construction camera frame at 7:45 AM PT. The site holds a steady appearance, with no apparent movement of equipment or vehicles in the last fifteen minutes.
      7:45 AM PT

      The site holds a steady appearance, with no apparent movement of equipment or vehicles in the last fifteen minutes.

    4. Construction camera frame at 7:30 AM PT. The scene appears largely unchanged, with equipment holding its positions across the block.
      7:30 AM PT

      The scene appears largely unchanged, with equipment holding its positions across the block.

  45. Construction camera frame at 7:15 AM PT. A yellow excavator near the center of the site has shifted its position slightly.
    7:15 AM PT

    A yellow excavator near the center of the site has shifted its position slightly.

  46. Construction camera frame at 7:00 AM PT. The arrangement of machinery across the site remains consistent, though a small white vehicle has appeared near the bottom of the frame.
    7:00 AM PT

    The arrangement of machinery across the site remains consistent, though a small white vehicle has appeared near the bottom of the frame.

  47. Construction camera frame at 6:45 AM PT. Everything on site remains in the same location as fifteen minutes ago, with no visible changes in equipment positioning.
    6:45 AM PT

    Everything on site remains in the same location as fifteen minutes ago, with no visible changes in equipment positioning.

  48. Construction camera frame at 6:30 AM PT. The scene presents a consistent view, and the arrangement of equipment across the site hasn't altered in the last quarter hour.
    6:30 AM PT

    The scene presents a consistent view, and the arrangement of equipment across the site hasn't altered in the last quarter hour.

  49. 10 similar no-change frames12:00 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The equipment across the site appears to be holding its positions, with no discernible shifts in placement during the last fifteen minutes.
      6:15 AM PT

      The equipment across the site appears to be holding its positions, with no discernible shifts in placement during the last fifteen minutes.

    2. Construction camera frame at 6:00 AM PT. NoLCSno activity is visible across the block, with all machinery and vehicles remaining stationary.
      6:00 AM PT

      NoLCSno activity is visible across the block, with all machinery and vehicles remaining stationary.

    3. Construction camera frame at 5:45 AM PT. The scene remains largely unchanged, with equipment still positioned across the site’s surface.
      5:45 AM PT

      The scene remains largely unchanged, with equipment still positioned across the site’s surface.

    4. Construction camera frame at 5:30 AM PT. The site is now visible with increased light, revealing several pieces of heavy equipment scattered across the graded area. There is no apparent movement between the two frames, and the machines remain in the same positions.
      5:30 AM PT

      The site is now visible with increased light, revealing several pieces of heavy equipment scattered across the graded area. There is no apparent movement between the two frames, and the machines remain in the same positions.

    5. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jul 29All daysJul 31 →