606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, August 2, 2026

Construction log

Sunday, August 2, 2026

70 snapshots from the live camera.


AI digest

The site was largely quiet, with only minor repositioning of some excavators and a small yellow machine, and two white pickup trucks entered and exited the site.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. The overall scene appears quite static, with no clear shifts in the placement of machinery or materials across the site.
      9:00 PM PT

      The overall scene appears quite static, with no clear shifts in the placement of machinery or materials across the site.

    3. Construction camera frame at 8:45 PM PT. The equipment remains in largely the same positions, though the light has continued to shift across the site.
      8:45 PM PT

      The equipment remains in largely the same positions, though the light has continued to shift across the site.

  3. Construction camera frame at 8:30 PM PT. The site’s configuration holds steady, with the equipment appearing in the same locations as before.
    8:30 PM PT

    The site’s configuration holds steady, with the equipment appearing in the same locations as before.

  4. Construction camera frame at 8:15 PM PT. The scene is largely unchanged, though the shadows cast by the equipment have lengthened slightly.
    8:15 PM PT

    The scene is largely unchanged, though the shadows cast by the equipment have lengthened slightly.

  5. Construction camera frame at 8:00 PM PT. The arrangement of equipment across the site remains remarkably consistent between these views.
    8:00 PM PT

    The arrangement of equipment across the site remains remarkably consistent between these views.

  6. Construction camera frame at 7:45 PM PT. The scene shows a minimal difference, with the positions of the machines and materials remaining largely unchanged.
    7:45 PM PT

    The scene shows a minimal difference, with the positions of the machines and materials remaining largely unchanged.

  7. Construction camera frame at 7:30 PM PT. The site presents a largely similar view, with no noticeable repositioning of the heavy equipment or stockpiled materials.
    7:30 PM PT

    The site presents a largely similar view, with no noticeable repositioning of the heavy equipment or stockpiled materials.

  8. 2 similar no-change frames7:00 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The layout of machinery and materials appears static, though the angle of sunlight across the site has altered.
      7:15 PM PT

      The layout of machinery and materials appears static, though the angle of sunlight across the site has altered.

    2. Construction camera frame at 7:00 PM PT. The scene maintains a steady state, with no apparent shifts in equipment positioning or material placement.
      7:00 PM PT

      The scene maintains a steady state, with no apparent shifts in equipment positioning or material placement.

  9. Construction camera frame at 6:45 PM PT. The equipment layout remains consistent, though the light has shifted slightly across the site.
    6:45 PM PT

    The equipment layout remains consistent, though the light has shifted slightly across the site.

  10. 3 similar no-change frames6:00 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. A white vehicle has entered the site from the driveway on the left side of the frame. Otherwise, the equipment and materials across the site remain in the same positions as before.
      6:30 PM PT

      A white vehicle has entered the site from the driveway on the left side of the frame. Otherwise, the equipment and materials across the site remain in the same positions as before.

    2. Construction camera frame at 6:15 PM PT. The scene is stable, with no discernible movement of equipment or materials between the two views.
      6:15 PM PT

      The scene is stable, with no discernible movement of equipment or materials between the two views.

    3. Construction camera frame at 6:00 PM PT. The site’s appearance is remarkably unchanged, with equipment remaining in the same positions.
      6:00 PM PT

      The site’s appearance is remarkably unchanged, with equipment remaining in the same positions.

  11. Construction camera frame at 5:45 PM PT. The site presents a consistent picture, with the positions of the machines and materials remaining as they were.
    5:45 PM PT

    The site presents a consistent picture, with the positions of the machines and materials remaining as they were.

  12. Construction camera frame at 5:30 PM PT. The arrangement of the machinery across the site appears largely the same as it was moments ago.
    5:30 PM PT

    The arrangement of the machinery across the site appears largely the same as it was moments ago.

  13. Construction camera frame at 5:15 PM PT. The scene is holding steady, with no notable shifts in the placement of equipment or materials visible across the site.
    5:15 PM PT

    The scene is holding steady, with no notable shifts in the placement of equipment or materials visible across the site.

  14. Construction camera frame at 5:00 PM PT. The site shows little alteration, with the arrangement of equipment appearing consistent across both views.
    5:00 PM PT

    The site shows little alteration, with the arrangement of equipment appearing consistent across both views.

  15. Construction camera frame at 4:45 PM PT. The site remains quite still, with no apparent changes in the location of the machinery or materials.
    4:45 PM PT

    The site remains quite still, with no apparent changes in the location of the machinery or materials.

  16. Construction camera frame at 4:30 PM PT. The scene is holding a stable appearance, with no immediately discernible shifts in equipment placement.
    4:30 PM PT

    The scene is holding a stable appearance, with no immediately discernible shifts in equipment placement.

  17. 3 similar no-change frames3:45 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The layout of the site appears unchanged, with all visible equipment remaining in the same positions.
      4:15 PM PT

      The layout of the site appears unchanged, with all visible equipment remaining in the same positions.

    2. Construction camera frame at 4:00 PM PT. No visible activity or movement has occurred across the site since the last update.
      4:00 PM PT

      No visible activity or movement has occurred across the site since the last update.

    3. Construction camera frame at 3:45 PM PT. The site presents a largely static picture, with the positions of the heavy machinery appearing consistent between views.
      3:45 PM PT

      The site presents a largely static picture, with the positions of the heavy machinery appearing consistent between views.

  18. Construction camera frame at 3:30 PM PT. The scene is holding steady, with the equipment largely unmoved from the previous view.
    3:30 PM PT

    The scene is holding steady, with the equipment largely unmoved from the previous view.

  19. Construction camera frame at 3:15 PM PT. The arrangement of the equipment across the site is nearly identical, showing no appreciable movement in this interval.
    3:15 PM PT

    The arrangement of the equipment across the site is nearly identical, showing no appreciable movement in this interval.

  20. Construction camera frame at 3:00 PM PT. The site remains remarkably consistent, with the positions of the tracked equipment appearing virtually unchanged.
    3:00 PM PT

    The site remains remarkably consistent, with the positions of the tracked equipment appearing virtually unchanged.

  21. Construction camera frame at 2:45 PM PT. The scene shows a very similar layout, with the machines remaining in largely the same spots.
    2:45 PM PT

    The scene shows a very similar layout, with the machines remaining in largely the same spots.

  22. Construction camera frame at 2:30 PM PT. The view across the site is very similar, with the heavy equipment maintaining roughly the same placements.
    2:30 PM PT

    The view across the site is very similar, with the heavy equipment maintaining roughly the same placements.

  23. Construction camera frame at 2:15 PM PT. The arrangement of machines across the site appears stable, with only very minor adjustments to their positions.
    2:15 PM PT

    The arrangement of machines across the site appears stable, with only very minor adjustments to their positions.

  24. 3 similar no-change frames1:30 PM–2:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:00 PM PT. The site presents a largely static view, with the positions of the machines appearing consistent between these observations.
      2:00 PM PT

      The site presents a largely static view, with the positions of the machines appearing consistent between these observations.

    2. Construction camera frame at 1:45 PM PT. The machinery on site appears to be holding steady, with no significant shifts in position visible between these views.
      1:45 PM PT

      The machinery on site appears to be holding steady, with no significant shifts in position visible between these views.

    3. Construction camera frame at 1:30 PM PT. The equipment arrangement is largely unchanged, though a white vehicle has entered the site via the driveway on the left.
      1:30 PM PT

      The equipment arrangement is largely unchanged, though a white vehicle has entered the site via the driveway on the left.

  25. Construction camera frame at 1:15 PM PT. The scene remains remarkably consistent, with the machinery largely holding its positions.
    1:15 PM PT

    The scene remains remarkably consistent, with the machinery largely holding its positions.

  26. Construction camera frame at 1:00 PM PT. A small yellow vehicle has moved from the lower-right to the center of the site, and one of the excavators near the bottom of the frame has rotated its boom.
    1:00 PM PT

    A small yellow vehicle has moved from the lower-right to the center of the site, and one of the excavators near the bottom of the frame has rotated its boom.

  27. Construction camera frame at 12:45 PM PT. The site’s machinery maintains its layout, with no readily apparent repositioning of equipment during this interval.
    12:45 PM PT

    The site’s machinery maintains its layout, with no readily apparent repositioning of equipment during this interval.

  28. Construction camera frame at 12:30 PM PT. The arrangement of machinery appears stable, with no discernible movement of equipment between the two views.
    12:30 PM PT

    The arrangement of machinery appears stable, with no discernible movement of equipment between the two views.

  29. Construction camera frame at 12:15 PM PT. A subtle repositioning of equipment is visible, as one of the excavators near the lower-left corner appears to have turned slightly.
    12:15 PM PT

    A subtle repositioning of equipment is visible, as one of the excavators near the lower-left corner appears to have turned slightly.

  30. Construction camera frame at 12:00 PM PT. The position of one of the excavators near the center of the frame has shifted slightly, and a smaller machine is visible moving along the right side.
    12:00 PM PT

    The position of one of the excavators near the center of the frame has shifted slightly, and a smaller machine is visible moving along the right side.

  31. Construction camera frame at 11:45 AM PT. The site presents a largely unchanged view, with equipment maintaining its positions across the work area.
    11:45 AM PT

    The site presents a largely unchanged view, with equipment maintaining its positions across the work area.

  32. Construction camera frame at 11:30 AM PT. Equipment across the site is positioned nearly identically to the previous view, with no obvious shifts or new arrivals.
    11:30 AM PT

    Equipment across the site is positioned nearly identically to the previous view, with no obvious shifts or new arrivals.

  33. Construction camera frame at 11:15 AM PT. The scene remains remarkably consistent, showing no significant alterations in equipment placement or activity.
    11:15 AM PT

    The scene remains remarkably consistent, showing no significant alterations in equipment placement or activity.

  34. Construction camera frame at 11:00 AM PT. The overall layout of equipment on site holds steady, though a small yellow machine has moved further into the work area near the bottom-right corner.
    11:00 AM PT

    The overall layout of equipment on site holds steady, though a small yellow machine has moved further into the work area near the bottom-right corner.

  35. Construction camera frame at 10:45 AM PT. The site’s equipment remains in mostly the same positions, although a small orange vehicle has appeared near the bottom-right corner.
    10:45 AM PT

    The site’s equipment remains in mostly the same positions, although a small orange vehicle has appeared near the bottom-right corner.

  36. Construction camera frame at 10:30 AM PT. The arrangement of machinery across the site remains largely the same, though one excavator near the lower-center edge has rotated slightly.
    10:30 AM PT

    The arrangement of machinery across the site remains largely the same, though one excavator near the lower-center edge has rotated slightly.

  37. Construction camera frame at 10:15 AM PT. The scene appears static, with no discernible movement of equipment or vehicles over the last quarter hour.
    10:15 AM PT

    The scene appears static, with no discernible movement of equipment or vehicles over the last quarter hour.

  38. Construction camera frame at 10:00 AM PT. A lone white pickup truck has entered the site via the driveway on the left side of the frame.
    10:00 AM PT

    A lone white pickup truck has entered the site via the driveway on the left side of the frame.

  39. Construction camera frame at 9:51 AM PT. The stark color split from the previous view has resolved, revealing that one of the excavators near the center of the site has shifted its position slightly.
    9:51 AM PT

    The stark color split from the previous view has resolved, revealing that one of the excavators near the center of the site has shifted its position slightly.

  40. Construction camera frame at 9:45 AM PT. Despite the unusual color split in the view, the site’s layout and equipment positions appear unchanged from the last check-in.
    9:45 AM PT

    Despite the unusual color split in the view, the site’s layout and equipment positions appear unchanged from the last check-in.

  41. Construction camera frame at 9:43 AM PT. The image quality has shifted dramatically, presenting a split view with altered color representation, but the placement of equipment appears consistent.
    9:43 AM PT

    The image quality has shifted dramatically, presenting a split view with altered color representation, but the placement of equipment appears consistent.

  42. Construction camera frame at 9:00 AM PT. The overall scene is holding steady, with no noticeable changes in the positions of equipment or vehicles.
    9:00 AM PT

    The overall scene is holding steady, with no noticeable changes in the positions of equipment or vehicles.

  43. Construction camera frame at 8:45 AM PT. The site remains much as it was fifteen minutes ago, with no visible equipment relocation or vehicle activity.
    8:45 AM PT

    The site remains much as it was fifteen minutes ago, with no visible equipment relocation or vehicle activity.

  44. 2 similar no-change frames8:15 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. The site shows no discernible shifts in equipment or vehicle positioning over the last fifteen minutes.
      8:30 AM PT

      The site shows no discernible shifts in equipment or vehicle positioning over the last fifteen minutes.

    2. Construction camera frame at 8:15 AM PT. The scene presents a stable picture, with all equipment remaining in the same locations as fifteen minutes ago.
      8:15 AM PT

      The scene presents a stable picture, with all equipment remaining in the same locations as fifteen minutes ago.

  45. Construction camera frame at 8:00 AM PT. The arrangement of machinery across the site remains consistent between these views.
    8:00 AM PT

    The arrangement of machinery across the site remains consistent between these views.

  46. 6 similar no-change frames6:30 AM–7:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:45 AM PT. The site appears largely unchanged, with machinery holding its positions from the earlier view.
      7:45 AM PT

      The site appears largely unchanged, with machinery holding its positions from the earlier view.

    2. Construction camera frame at 7:30 AM PT. Equipment positions appear static, and no vehicle movement is apparent during this interval.
      7:30 AM PT

      Equipment positions appear static, and no vehicle movement is apparent during this interval.

    3. Construction camera frame at 7:15 AM PT. No construction activity — the site is quiet.
      7:15 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 7:00 AM PT. No construction activity — the site is quiet.
      7:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 6:45 AM PT. The site shows no noticeable alterations in equipment placement or activity over the past fifteen minutes.
      6:45 AM PT

      The site shows no noticeable alterations in equipment placement or activity over the past fifteen minutes.

    6. Construction camera frame at 6:30 AM PT. The scene presents a consistent appearance, with equipment remaining in the same positions as observed earlier.
      6:30 AM PT

      The scene presents a consistent appearance, with equipment remaining in the same positions as observed earlier.

  47. Construction camera frame at 6:15 AM PT. The scene remains stable, with all equipment appearing in the same locations as fifteen minutes ago.
    6:15 AM PT

    The scene remains stable, with all equipment appearing in the same locations as fifteen minutes ago.

  48. Construction camera frame at 6:00 AM PT. The arrangement of equipment across the site appears largely unchanged, and no vehicles have entered or departed in the last quarter of an hour.
    6:00 AM PT

    The arrangement of equipment across the site appears largely unchanged, and no vehicles have entered or departed in the last quarter of an hour.

  49. 7 similar no-change frames12:00 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. The site is now visible with the increasing light, showing several pieces of heavy equipment positioned across the graded area. Activity remains quiet, with no discernible movement of machines or vehicles in the last fifteen minutes.
      5:45 AM PT

      The site is now visible with the increasing light, showing several pieces of heavy equipment positioned across the graded area. Activity remains quiet, with no discernible movement of machines or vehicles in the last fifteen minutes.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 1All daysAug 3 →