Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, August 3, 2026

Construction log

Monday, August 3, 2026

71 snapshots from the live camera.


AI digest

The site remained mostly quiet through the day, with only small shifts in equipment and a few vehicles moving through the work area. Compared with the week-earlier frame, the central ground area appears lower and more cut back, though the day’s frames show no substantial change.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 4 similar no-change frames8:30 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. Visibility is low and the site is quiet, with little definition of equipment or activity in the darkness.
      9:00 PM PT

      Visibility is low and the site is quiet, with little definition of equipment or activity in the darkness.

    3. Construction camera frame at 8:45 PM PT. The construction site appears quiet, with no visible alterations to the positions of the equipment or vehicles.
      8:45 PM PT

      The construction site appears quiet, with no visible alterations to the positions of the equipment or vehicles.

    4. Construction camera frame at 8:30 PM PT. The construction site shows no discernible movement in equipment or vehicle activity during the last fifteen minutes.
      8:30 PM PT

      The construction site shows no discernible movement in equipment or vehicle activity during the last fifteen minutes.

  3. Construction camera frame at 8:15 PM PT. The scene appears stable, with the arrangement of heavy machinery remaining consistent over the last fifteen minutes.
    8:15 PM PT

    The scene appears stable, with the arrangement of heavy machinery remaining consistent over the last fifteen minutes.

  4. Construction camera frame at 8:00 PM PT. The site remains remarkably still, with no apparent shifts in the locations of the tracked equipment.
    8:00 PM PT

    The site remains remarkably still, with no apparent shifts in the locations of the tracked equipment.

  5. Construction camera frame at 7:45 PM PT. The site’s machinery maintains its positions, and no new vehicles have entered or exited during this interval.
    7:45 PM PT

    The site’s machinery maintains its positions, and no new vehicles have entered or exited during this interval.

  6. Construction camera frame at 7:30 PM PT. The construction site displays a largely unchanged appearance, with equipment holding its previous positions.
    7:30 PM PT

    The construction site displays a largely unchanged appearance, with equipment holding its previous positions.

  7. Construction camera frame at 7:15 PM PT. The arrangement of the construction site’s machinery appears nearly identical to the previous view.
    7:15 PM PT

    The arrangement of the construction site’s machinery appears nearly identical to the previous view.

  8. Construction camera frame at 7:00 PM PT. The site presents a static view, with all visible equipment remaining in the same positions as before.
    7:00 PM PT

    The site presents a static view, with all visible equipment remaining in the same positions as before.

  9. Construction camera frame at 6:45 PM PT. The overall layout of the site remains consistent, with no obvious repositioning of machinery or materials noted.
    6:45 PM PT

    The overall layout of the site remains consistent, with no obvious repositioning of machinery or materials noted.

  10. 4 similar no-change frames5:45 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. The scene is holding a stable appearance, with no discernible movement of equipment or vehicles within the frame.
      6:30 PM PT

      The scene is holding a stable appearance, with no discernible movement of equipment or vehicles within the frame.

    2. Construction camera frame at 6:15 PM PT. The site’s equipment remains in the same positions, showing no alterations in placement during the last fifteen minutes.
      6:15 PM PT

      The site’s equipment remains in the same positions, showing no alterations in placement during the last fifteen minutes.

    3. Construction camera frame at 6:00 PM PT. The site’s arrangement of equipment and materials shows no observable shift in position over the last fifteen minutes.
      6:00 PM PT

      The site’s arrangement of equipment and materials shows no observable shift in position over the last fifteen minutes.

    4. Construction camera frame at 5:45 PM PT. The site appears largely unchanged, with the arrangement of machinery and materials holding steady over the last quarter hour.
      5:45 PM PT

      The site appears largely unchanged, with the arrangement of machinery and materials holding steady over the last quarter hour.

  11. Construction camera frame at 5:30 PM PT. The scene remains remarkably still, with equipment holding its positions from the previous view.
    5:30 PM PT

    The scene remains remarkably still, with equipment holding its positions from the previous view.

  12. 5 similar no-change frames4:15 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The site presents a consistent view, with all visible equipment remaining in the same locations as before.
      5:15 PM PT

      The site presents a consistent view, with all visible equipment remaining in the same locations as before.

    2. Construction camera frame at 5:00 PM PT. The layout of equipment on the site appears static, with no apparent repositioning of machines or materials.
      5:00 PM PT

      The layout of equipment on the site appears static, with no apparent repositioning of machines or materials.

    3. Construction camera frame at 4:45 PM PT. The construction site maintains a stable state, with no discernible movement of equipment or materials in the last fifteen minutes.
      4:45 PM PT

      The construction site maintains a stable state, with no discernible movement of equipment or materials in the last fifteen minutes.

    4. Construction camera frame at 4:30 PM PT. No movement is visible across the site, and all equipment remains in place.
      4:30 PM PT

      No movement is visible across the site, and all equipment remains in place.

    5. Construction camera frame at 4:15 PM PT. The site displays a very similar picture, with the positions of the machines and materials appearing largely unchanged.
      4:15 PM PT

      The site displays a very similar picture, with the positions of the machines and materials appearing largely unchanged.

  13. Construction camera frame at 4:00 PM PT. Equipment appears to be holding steady, with no obvious shifts in position across the site.
    4:00 PM PT

    Equipment appears to be holding steady, with no obvious shifts in position across the site.

  14. 3 similar no-change frames3:15 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
      3:45 PM PT

      The scene remains largely unchanged, with equipment holding its positions across the site.

    2. Construction camera frame at 3:30 PM PT. The site holds a consistent appearance, with no noticeable alterations in the placement of equipment or materials.
      3:30 PM PT

      The site holds a consistent appearance, with no noticeable alterations in the placement of equipment or materials.

    3. Construction camera frame at 3:15 PM PT. The site presents a static view, with machinery maintaining its current placement.
      3:15 PM PT

      The site presents a static view, with machinery maintaining its current placement.

  15. Construction camera frame at 3:00 PM PT. The arrangement of machinery on site looks remarkably similar to the previous view.
    3:00 PM PT

    The arrangement of machinery on site looks remarkably similar to the previous view.

  16. Construction camera frame at 2:45 PM PT. The overall layout of equipment across the site remains consistent, with no significant repositioning apparent.
    2:45 PM PT

    The overall layout of equipment across the site remains consistent, with no significant repositioning apparent.

  17. Construction camera frame at 2:30 PM PT. The site appears quiet, with no discernible changes in equipment locations or activity over the last fifteen minutes.
    2:30 PM PT

    The site appears quiet, with no discernible changes in equipment locations or activity over the last fifteen minutes.

  18. Construction camera frame at 2:15 PM PT. Equipment positions appear to be holding steady across the site, with no obvious shifts or movements.
    2:15 PM PT

    Equipment positions appear to be holding steady across the site, with no obvious shifts or movements.

  19. Construction camera frame at 2:00 PM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
    2:00 PM PT

    The scene remains largely unchanged, with equipment holding its positions across the site.

  20. Construction camera frame at 1:45 PM PT. The tracked dozer near the center of the site has moved a short distance to the right.
    1:45 PM PT

    The tracked dozer near the center of the site has moved a short distance to the right.

  21. Construction camera frame at 1:30 PM PT. A yellow excavator has rotated its boom and house toward the lower-right corner of the site.
    1:30 PM PT

    A yellow excavator has rotated its boom and house toward the lower-right corner of the site.

  22. Construction camera frame at 1:15 PM PT. A small, light-colored vehicle has moved from the driveway on the left into the work area, near the center of the frame.
    1:15 PM PT

    A small, light-colored vehicle has moved from the driveway on the left into the work area, near the center of the frame.

  23. Construction camera frame at 1:00 PM PT. The equipment arrangement remains quite similar, though one of the excavators near the lower-left corner has shifted its position slightly.
    1:00 PM PT

    The equipment arrangement remains quite similar, though one of the excavators near the lower-left corner has shifted its position slightly.

  24. Construction camera frame at 12:45 PM PT. The site presents a very similar picture, with the arrangement of heavy equipment appearing stable.
    12:45 PM PT

    The site presents a very similar picture, with the arrangement of heavy equipment appearing stable.

  25. Construction camera frame at 12:30 PM PT. The layout of equipment across the site appears consistent, with no significant repositioning visible in this view.
    12:30 PM PT

    The layout of equipment across the site appears consistent, with no significant repositioning visible in this view.

  26. 2 similar no-change frames12:00 PM–12:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:15 PM PT. The site’s overall appearance is similar to the previous view, with machinery remaining in largely the same locations.
      12:15 PM PT

      The site’s overall appearance is similar to the previous view, with machinery remaining in largely the same locations.

    2. Construction camera frame at 12:00 PM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
      12:00 PM PT

      The scene remains largely unchanged, with equipment holding its positions across the site.

  27. Construction camera frame at 11:45 AM PT. Equipment appears to be in generally the same arrangement as before, though a dark-colored machine has moved slightly toward the center of the site.
    11:45 AM PT

    Equipment appears to be in generally the same arrangement as before, though a dark-colored machine has moved slightly toward the center of the site.

  28. Construction camera frame at 11:30 AM PT. A yellow machine near the lower edge has advanced a short distance into the site, and a white truck is now positioned further toward the center.
    11:30 AM PT

    A yellow machine near the lower edge has advanced a short distance into the site, and a white truck is now positioned further toward the center.

  29. Construction camera frame at 11:15 AM PT. A dark-colored truck is now visible traveling along the driveway on the left side of the frame, heading toward the interior of the site.
    11:15 AM PT

    A dark-colored truck is now visible traveling along the driveway on the left side of the frame, heading toward the interior of the site.

  30. Construction camera frame at 11:00 AM PT. The site presents a static view, with no apparent shifts in equipment or vehicle positions.
    11:00 AM PT

    The site presents a static view, with no apparent shifts in equipment or vehicle positions.

  31. Construction camera frame at 10:45 AM PT. The equipment layout is mostly consistent between views, though a small, dark machine has moved slightly further into the site from the lower-left corner.
    10:45 AM PT

    The equipment layout is mostly consistent between views, though a small, dark machine has moved slightly further into the site from the lower-left corner.

  32. Construction camera frame at 10:30 AM PT. AS a white dump truck has pulled forward toward the center of the site, and a yellow machine has shifted position in the lower-left area.
    10:30 AM PT

    AS a white dump truck has pulled forward toward the center of the site, and a yellow machine has shifted position in the lower-left area.

  33. Construction camera frame at 10:15 AM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
    10:15 AM PT

    The scene remains largely unchanged, with equipment holding its positions across the site.

  34. Construction camera frame at 10:00 AM PT. Activity on site is minimal, but one of the excavators near the center has rotated slightly.
    10:00 AM PT

    Activity on site is minimal, but one of the excavators near the center has rotated slightly.

  35. Construction camera frame at 9:45 AM PT. The central area of the site shows a new, dark-colored vehicle positioned between two larger yellow machines.
    9:45 AM PT

    The central area of the site shows a new, dark-colored vehicle positioned between two larger yellow machines.

  36. Construction camera frame at 9:30 AM PT. The arrangement of equipment across the site appears stable, though a small blue vehicle has shifted position on the lower right side.
    9:30 AM PT

    The arrangement of equipment across the site appears stable, though a small blue vehicle has shifted position on the lower right side.

  37. Construction camera frame at 9:15 AM PT. A red and white truck is now visible near the driveway on the left side of the frame, having arrived since the last view.
    9:15 AM PT

    A red and white truck is now visible near the driveway on the left side of the frame, having arrived since the last view.

  38. Construction camera frame at 9:00 AM PT. The overall layout of the site remains consistent, with no significant alterations to equipment placement visible in this comparison.
    9:00 AM PT

    The overall layout of the site remains consistent, with no significant alterations to equipment placement visible in this comparison.

  39. Construction camera frame at 8:45 AM PT. The site presents a similar view to the last check-in, with no readily apparent movement of machinery or materials.
    8:45 AM PT

    The site presents a similar view to the last check-in, with no readily apparent movement of machinery or materials.

  40. Construction camera frame at 8:30 AM PT. The scene is largely unchanged, though the position of the dozer near the center of the site appears to have subtly shifted.
    8:30 AM PT

    The scene is largely unchanged, though the position of the dozer near the center of the site appears to have subtly shifted.

  41. Construction camera frame at 8:15 AM PT. A dark-colored truck has moved from the right side of the work area toward the center.
    8:15 AM PT

    A dark-colored truck has moved from the right side of the work area toward the center.

  42. Construction camera frame at 8:00 AM PT. Equipment remains largely in the same positions as fifteen minutes ago, though a small white vehicle has entered the site via the driveway on the left.
    8:00 AM PT

    Equipment remains largely in the same positions as fifteen minutes ago, though a small white vehicle has entered the site via the driveway on the left.

  43. Construction camera frame at 7:45 AM PT. The position of one of the excavators near the center of the site has shifted slightly between these views.
    7:45 AM PT

    The position of one of the excavators near the center of the site has shifted slightly between these views.

  44. 5 similar no-change frames6:30 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The site maintains a static appearance, with no obvious repositioning of equipment or materials.
      7:30 AM PT

      The site maintains a static appearance, with no obvious repositioning of equipment or materials.

    2. Construction camera frame at 7:15 AM PT. The arrangement of equipment across the site appears to be holding, with no visible changes in position.
      7:15 AM PT

      The arrangement of equipment across the site appears to be holding, with no visible changes in position.

    3. Construction camera frame at 7:00 AM PT. The layout of machinery on the site is stable, with no discernible movement over the past fifteen minutes.
      7:00 AM PT

      The layout of machinery on the site is stable, with no discernible movement over the past fifteen minutes.

    4. Construction camera frame at 6:45 AM PT. The site shows no noticeable alteration in the positions of equipment or materials over the last fifteen minutes.
      6:45 AM PT

      The site shows no noticeable alteration in the positions of equipment or materials over the last fifteen minutes.

    5. Construction camera frame at 6:30 AM PT. The site presents a similar picture, with no apparent shifts in equipment positions.
      6:30 AM PT

      The site presents a similar picture, with no apparent shifts in equipment positions.

  45. Construction camera frame at 6:15 AM PT. The equipment arrangement across the site remains consistent between these views.
    6:15 AM PT

    The equipment arrangement across the site remains consistent between these views.

  46. Construction camera frame at 6:00 AM PT. The view across the site holds steady, with all the same machinery in place as before.
    6:00 AM PT

    The view across the site holds steady, with all the same machinery in place as before.

  47. 8 similar no-change frames12:00 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. The scene appears largely unchanged, with the same equipment visible across the site.
      5:45 AM PT

      The scene appears largely unchanged, with the same equipment visible across the site.

    2. Construction camera frame at 5:30 AM PT. The site remains quiet, though visibility has improved with the changing light.
      5:30 AM PT

      The site remains quiet, though visibility has improved with the changing light.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 2All daysAug 4 →