Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Progress
  • Towers
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, August 6, 2026

Construction log

Thursday, August 6, 2026

71 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

Equipment worked across the graded area throughout the day, with excavators and dozers reshaping the ground, particularly in the central and southern portions of the site. Several trucks and smaller vehicles entered and moved within the site.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  4. The site appears quiet, with the position of the equipment holding steady over the past fifteen minutes.
    8:45 PM PT

    The site appears quiet, with the position of the equipment holding steady over the past fifteen minutes.

  5. The machines on site hold their positions, with no discernible movement over the last quarter hour.
    8:30 PM PT

    The machines on site hold their positions, with no discernible movement over the last quarter hour.

  6. The arrangement of equipment appears unchanged, with the same machines visible in similar locations.
    8:15 PM PT

    The arrangement of equipment appears unchanged, with the same machines visible in similar locations.

  7. Activity on the right side of the site has increased, as a piece of machinery is now visible near the service road that wasn't there before.
    8:00 PM PT

    Activity on the right side of the site has increased, as a piece of machinery is now visible near the service road that wasn't there before.

  8. The scene presents a stable picture, with the equipment remaining in the same positions as before.
    7:45 PM PT

    The scene presents a stable picture, with the equipment remaining in the same positions as before.

  9. The placement of machines across the site remains virtually identical to the last check.
    7:30 PM PT

    The placement of machines across the site remains virtually identical to the last check.

  10. A small, yellow piece of equipment has moved slightly further into the graded area near the center of the site.
    7:15 PM PT

    A small, yellow piece of equipment has moved slightly further into the graded area near the center of the site.

  11. The equipment arrangement remains consistent, though the angle of sunlight continues to alter the shadows across the site.
    7:00 PM PT

    The equipment arrangement remains consistent, though the angle of sunlight continues to alter the shadows across the site.

  12. The site appears quiet, with no noticeable repositioning of equipment or materials over the last fifteen minutes.
    6:45 PM PT

    The site appears quiet, with no noticeable repositioning of equipment or materials over the last fifteen minutes.

  13. The scene is holding steady, with no discernible shifts in equipment or material placement.
    6:30 PM PT

    The scene is holding steady, with no discernible shifts in equipment or material placement.

  14. The overall scene is largely unchanged, though sunlight now casts slightly different shadows across the graded area.
    6:15 PM PT

    The overall scene is largely unchanged, though sunlight now casts slightly different shadows across the graded area.

  15. The scene remains remarkably similar, with only subtle variations in the light and shadow across the graded area.
    6:00 PM PT

    The scene remains remarkably similar, with only subtle variations in the light and shadow across the graded area.

  16. The arrangement of machines and stockpiled materials appears static, though shadows have shifted with the sun.
    5:45 PM PT

    The arrangement of machines and stockpiled materials appears static, though shadows have shifted with the sun.

  17. No movements or changes are visible across the site.
    5:30 PM PT

    No movements or changes are visible across the site.

  18. The layout of the equipment and materials remains consistent between the two views, with only slight shifts in shadow patterns.
    5:15 PM PT

    The layout of the equipment and materials remains consistent between the two views, with only slight shifts in shadow patterns.

  19. The site presents a largely consistent picture, with no obvious repositioning of the heavy equipment.
    5:00 PM PT

    The site presents a largely consistent picture, with no obvious repositioning of the heavy equipment.

  20. The patterns of disturbed earth in the central area show a slight refinement, with more defined ridges and tracks visible.
    4:45 PM PT

    The patterns of disturbed earth in the central area show a slight refinement, with more defined ridges and tracks visible.

  21. The overall layout of the site appears unchanged, though the patterns in the disturbed earth continue to evolve slightly.
    4:30 PM PT

    The overall layout of the site appears unchanged, though the patterns in the disturbed earth continue to evolve slightly.

  22. The scene remains remarkably stable, with no visible alterations in machinery positions or ground features.
    4:15 PM PT

    The scene remains remarkably stable, with no visible alterations in machinery positions or ground features.

  23. The site displays a static scene, with the positions of the machinery and ground patterns remaining consistent.
    4:00 PM PT

    The site displays a static scene, with the positions of the machinery and ground patterns remaining consistent.

  24. The site’s appearance is nearly identical to the previous view, with no apparent movement of equipment or material.
    3:45 PM PT

    The site’s appearance is nearly identical to the previous view, with no apparent movement of equipment or material.

  25. The site maintains a consistent appearance, with no immediately noticeable shifts in equipment placement or ground conditions.
    3:30 PM PT

    The site maintains a consistent appearance, with no immediately noticeable shifts in equipment placement or ground conditions.

  26. The ground disturbance pattern in the central area appears subtly different, showing a new ridged texture.
    3:15 PM PT

    The ground disturbance pattern in the central area appears subtly different, showing a new ridged texture.

  27. The arrangement of equipment appears largely unchanged, though the texture of the worked ground in the center has subtle variations.
    3:00 PM PT

    The arrangement of equipment appears largely unchanged, though the texture of the worked ground in the center has subtle variations.

  28. A small yellow machine has shifted position in the southwestern corner of the site, moving slightly closer to the center.
    2:45 PM PT

    A small yellow machine has shifted position in the southwestern corner of the site, moving slightly closer to the center.

  29. The scene presents a remarkably stable picture, with the equipment and worked areas holding their positions.
    2:30 PM PT

    The scene presents a remarkably stable picture, with the equipment and worked areas holding their positions.

  30. The equipment arrangement remains consistent, although the texture of the worked area in the lower center of the site has been further refined.
    2:15 PM PT

    The equipment arrangement remains consistent, although the texture of the worked area in the lower center of the site has been further refined.

  31. The pattern of disturbed soil in the central area seems to have shifted slightly, with some areas appearing more compacted than before.
    2:00 PM PT

    The pattern of disturbed soil in the central area seems to have shifted slightly, with some areas appearing more compacted than before.

  32. The central area shows a continuation of surface work, with a slightly altered pattern in the disturbed soil.
    1:45 PM PT

    The central area shows a continuation of surface work, with a slightly altered pattern in the disturbed soil.

  33. The worked surface displays a slight alteration in form, with a small area appearing more defined near the center of the site.
    1:30 PM PT

    The worked surface displays a slight alteration in form, with a small area appearing more defined near the center of the site.

  34. The arrangement of equipment across the site appears largely unchanged, though the worked surface shows subtle shifts in texture.
    1:15 PM PT

    The arrangement of equipment across the site appears largely unchanged, though the worked surface shows subtle shifts in texture.

  35. The worked area near the lower-right corner now includes a small yellow machine that wasn't present in the earlier view. Beyond that, the scene holds a similar arrangement of equipment and materials.
    1:00 PM PT

    The worked area near the lower-right corner now includes a small yellow machine that wasn't present in the earlier view. Beyond that, the scene holds a similar arrangement of equipment and materials.

  36. The graded area near the center of the site shows continued reshaping, with a slightly different contour to the worked surface.
    12:45 PM PT

    The graded area near the center of the site shows continued reshaping, with a slightly different contour to the worked surface.

  37. A yellow machine near the center has advanced slightly further into the graded area. The overall layout of equipment and materials remains otherwise stable.
    12:30 PM PT

    A yellow machine near the center has advanced slightly further into the graded area. The overall layout of equipment and materials remains otherwise stable.

  38. The worked area shows some further disturbance, with a noticeable reshaping of the graded surface near the center of the site.
    12:15 PM PT

    The worked area shows some further disturbance, with a noticeable reshaping of the graded surface near the center of the site.

  39. The scene presents a largely static picture, with the arrangement of heavy equipment appearing consistent across the site.
    12:00 PM PT

    The scene presents a largely static picture, with the arrangement of heavy equipment appearing consistent across the site.

  40. A small yellow machine has moved from the upper-center to the lower-center of the worked area. Otherwise, the scene remains much as it was, with the same distribution of equipment and materials.
    11:45 AM PT

    A small yellow machine has moved from the upper-center to the lower-center of the worked area. Otherwise, the scene remains much as it was, with the same distribution of equipment and materials.

  41. The arrangement of equipment appears consistent between these views, though subtle shifts in the worked area are visible.
    11:30 AM PT

    The arrangement of equipment appears consistent between these views, though subtle shifts in the worked area are visible.

  42. Equipment arrangements across the site remain largely unchanged in this latest view.
    11:15 AM PT

    Equipment arrangements across the site remain largely unchanged in this latest view.

  43. Two white trucks have arrived at the drivewayL-shaped driveway on the left, and a piece of equipment has shifted positionC position in the southern area.
    11:00 AM PT

    Two white trucks have arrived at the drivewayL-shaped driveway on the left, and a piece of equipment has shifted positionC position in the southern area.

  44. The site appears remarkably stable, with no immediately visible shifts in equipment positions or material arrangements.
    10:45 AM PT

    The site appears remarkably stable, with no immediately visible shifts in equipment positions or material arrangements.

  45. The worked area shows a slight shift in patterns, with some re-shaping of the material across the site.
    10:30 AM PT

    The worked area shows a slight shift in patterns, with some re-shaping of the material across the site.

  46. No construction activity — the site is quiet.
    10:15 AM PT

    No construction activity — the site is quiet.

  47. The patterns in the worked area have been reshaped, indicating activity across the site.
    10:00 AM PT

    The patterns in the worked area have been reshaped, indicating activity across the site.

  48. An additional piece of equipment is now visible working in the southern portion of the graded area.
    9:45 AM PT

    An additional piece of equipment is now visible working in the southern portion of the graded area.

  49. The scene remains largely unchanged, though the patterns within the worked area appear subtly different.
    9:30 AM PT

    The scene remains largely unchanged, though the patterns within the worked area appear subtly different.

  50. A small dark-colored vehicle has moved further into the worked area from the left side of the frame.
    9:15 AM PT

    A small dark-colored vehicle has moved further into the worked area from the left side of the frame.

  51. The excavator near the center of the frame is now positioned further to the south, actively working in the graded area.
    9:00 AM PT

    The excavator near the center of the frame is now positioned further to the south, actively working in the graded area.

  52. The tracked dozer near the center has shifted slightly to the right, and a small white vehicle is now visible moving along the worked area.
    8:45 AM PT

    The tracked dozer near the center has shifted slightly to the right, and a small white vehicle is now visible moving along the worked area.

  53. The equipment layout is consistent between these views, with no obvious repositioning of machines or materials.
    8:30 AM PT

    The equipment layout is consistent between these views, with no obvious repositioning of machines or materials.

  54. The scene appears remarkably static, with no discernible changes in machine placement or activity during this period.
    8:15 AM PT

    The scene appears remarkably static, with no discernible changes in machine placement or activity during this period.

  55. The arrangement of equipment appears stable, though the worked area in the center shows further subtle reshaping of the soil.
    8:00 AM PT

    The arrangement of equipment appears stable, though the worked area in the center shows further subtle reshaping of the soil.

  56. The central area of the site displays a subtle shift in the pattern of worked earth, indicating some continued movement of material.
    7:45 AM PT

    The central area of the site displays a subtle shift in the pattern of worked earth, indicating some continued movement of material.

  57. A dark-colored truck has entered the site via the driveway on the left side of the frame, and is now positioned along the central area. Otherwise, the overall scene remains largely unchanged, with the equipment holding its positions.
    7:30 AM PT

    A dark-colored truck has entered the site via the driveway on the left side of the frame, and is now positioned along the central area. Otherwise, the overall scene remains largely unchanged, with the equipment holding its positions.

  58. The area near the center of the site shows a slight darkening of the earth, suggesting some recent activity in that location.
    7:15 AM PT

    The area near the center of the site shows a slight darkening of the earth, suggesting some recent activity in that location.

  59. The site maintains a similar appearance, with the positions of the machines and materials holding relatively constant.
    7:00 AM PT

    The site maintains a similar appearance, with the positions of the machines and materials holding relatively constant.

  60. The equipment layout remains consistent, with no apparent movement of the larger machines during this interval.
    6:45 AM PT

    The equipment layout remains consistent, with no apparent movement of the larger machines during this interval.

  61. The site shows little in the way of alteration, and the heavy equipment remains in the same general locations.
    6:30 AM PT

    The site shows little in the way of alteration, and the heavy equipment remains in the same general locations.

  62. The arrangement of equipment across the site appears stable, with no noticeable shifts in position over the last fifteen minutes.
    6:15 AM PT

    The arrangement of equipment across the site appears stable, with no noticeable shifts in position over the last fifteen minutes.

  63. The scene is holding steady, with the arrangement of machinery appearing consistent between the two views.
    6:00 AM PT

    The scene is holding steady, with the arrangement of machinery appearing consistent between the two views.

  64. The site is largely unchanged, with equipment remaining in the same positions as fifteen minutes ago.
    5:45 AM PT

    The site is largely unchanged, with equipment remaining in the same positions as fifteen minutes ago.

  65. Visibility remains low, and the site appears quiet during the night.
    5:30 AM PT

    Visibility remains low, and the site appears quiet during the night.

  66. No construction activity — the site is quiet.
    5:00 AM PT

    No construction activity — the site is quiet.

  67. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  68. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  69. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  70. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  71. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.