Skip to content
606Independent guide, Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, August 5, 2026

Construction log

Wednesday, August 5, 2026

70 snapshots from the live camera.


AI digest

The broad graded area and its stepped edges look much the same as a week earlier, with no clear large-scale change in the ground. Equipment shifted around during the day, and a dark truck and white pickup appeared near the left and central areas, but the site was otherwise largely quiet.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 3 similar no-change frames8:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 8:45 PM PT. The layout of equipment across the site remains stable, with no discernible shifts in position over the last fifteen minutes.
      8:45 PM PT

      The layout of equipment across the site remains stable, with no discernible shifts in position over the last fifteen minutes.

  3. Construction camera frame at 8:30 PM PT. Nothing has moved across the site between these two frames.
    8:30 PM PT

    Nothing has moved across the site between these two frames.

  4. Construction camera frame at 8:15 PM PT. The site's appearance is remarkably consistent, with the heavy equipment remaining in the same general areas.
    8:15 PM PT

    The site's appearance is remarkably consistent, with the heavy equipment remaining in the same general areas.

  5. Construction camera frame at 8:00 PM PT. The overall scene appears unchanged, with the equipment remaining in the same positions.
    8:00 PM PT

    The overall scene appears unchanged, with the equipment remaining in the same positions.

  6. Construction camera frame at 7:45 PM PT. The machines on site appear to be in the same arrangement as before, showing no obvious movement.
    7:45 PM PT

    The machines on site appear to be in the same arrangement as before, showing no obvious movement.

  7. Construction camera frame at 7:30 PM PT. The scene is largely static, with the machines and materials maintaining their positions across the site.
    7:30 PM PT

    The scene is largely static, with the machines and materials maintaining their positions across the site.

  8. Construction camera frame at 7:15 PM PT. The site presents a very similar picture now, with the machinery holding its positions across the graded area.
    7:15 PM PT

    The site presents a very similar picture now, with the machinery holding its positions across the graded area.

  9. 2 similar no-change frames6:45 PM–7:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 PM PT. The view from above shows a consistent landscape, with equipment remaining in largely the same locations.
      7:00 PM PT

      The view from above shows a consistent landscape, with equipment remaining in largely the same locations.

    2. Construction camera frame at 6:45 PM PT. The site remains in a quiet state, with no discernible changes to the positions of the machinery or materials.
      6:45 PM PT

      The site remains in a quiet state, with no discernible changes to the positions of the machinery or materials.

  10. Construction camera frame at 6:30 PM PT. The arrangement of the machines across the site seems to be holding, with no readily apparent repositioning of equipment.
    6:30 PM PT

    The arrangement of the machines across the site seems to be holding, with no readily apparent repositioning of equipment.

  11. 5 similar no-change frames5:15 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The site’s equipment appears to be holding its ground, with no significant shifts in position detected.
      6:15 PM PT

      The site’s equipment appears to be holding its ground, with no significant shifts in position detected.

    2. Construction camera frame at 6:00 PM PT. The scene appears stable, with the arrangement of equipment largely unchanged over the last quarter hour.
      6:00 PM PT

      The scene appears stable, with the arrangement of equipment largely unchanged over the last quarter hour.

    3. Construction camera frame at 5:45 PM PT. The scene remains largely static, with the positions of the heavy machinery appearing consistent between views.
      5:45 PM PT

      The scene remains largely static, with the positions of the heavy machinery appearing consistent between views.

    4. Construction camera frame at 5:30 PM PT. The site presents a largely unchanged view, with equipment remaining in nearly the same positions as before.
      5:30 PM PT

      The site presents a largely unchanged view, with equipment remaining in nearly the same positions as before.

    5. Construction camera frame at 5:15 PM PT. The machines on site maintain their positions, showing no noticeable movement in the last fifteen minutes.
      5:15 PM PT

      The machines on site maintain their positions, showing no noticeable movement in the last fifteen minutes.

  12. Construction camera frame at 5:00 PM PT. The overall arrangement of machinery on the site holds steady, with no obvious adjustments to positions.
    5:00 PM PT

    The overall arrangement of machinery on the site holds steady, with no obvious adjustments to positions.

  13. Construction camera frame at 4:45 PM PT. The layout of equipment on site looks remarkably consistent, with no major repositioning apparent in this view.
    4:45 PM PT

    The layout of equipment on site looks remarkably consistent, with no major repositioning apparent in this view.

  14. Construction camera frame at 4:30 PM PT. An excavator has moved from the upper-center to the lower-center of the graded area, while the other machines maintain their positions.
    4:30 PM PT

    An excavator has moved from the upper-center to the lower-center of the graded area, while the other machines maintain their positions.

  15. 3 similar no-change frames3:45 PM–4:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:15 PM PT. The scene appears quite similar to the previous view, with the major equipment remaining in the same general locations.
      4:15 PM PT

      The scene appears quite similar to the previous view, with the major equipment remaining in the same general locations.

    2. Construction camera frame at 4:00 PM PT. Equipment positions across the site appear stable, with no discernible shifts in placement since the last view.
      4:00 PM PT

      Equipment positions across the site appear stable, with no discernible shifts in placement since the last view.

    3. Construction camera frame at 3:45 PM PT. The scene remains relatively unchanged, though one of the excavators near the center has rotated slightly to face a different direction.
      3:45 PM PT

      The scene remains relatively unchanged, though one of the excavators near the center has rotated slightly to face a different direction.

  16. Construction camera frame at 3:30 PM PT. The scene presents a generally consistent appearance, with equipment in similar positions to the last check.
    3:30 PM PT

    The scene presents a generally consistent appearance, with equipment in similar positions to the last check.

  17. Construction camera frame at 3:15 PM PT. The arrangement of the larger machines in the central area of the site has subtly altered, with one now positioned further toward the lower edge. Otherwise, the scene remains largely as it was previously.
    3:15 PM PT

    The arrangement of the larger machines in the central area of the site has subtly altered, with one now positioned further toward the lower edge. Otherwise, the scene remains largely as it was previously.

  18. 2 similar no-change frames2:45 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. A small piece of machinery has moved from the upper-center to the lower-center of the site. The larger equipment groupings remain in roughly the same positions as before.
      3:00 PM PT

      A small piece of machinery has moved from the upper-center to the lower-center of the site. The larger equipment groupings remain in roughly the same positions as before.

    2. Construction camera frame at 2:45 PM PT. The equipment layout across the site is largely static, though a small piece of machinery has shifted position near the right edge of the frame.
      2:45 PM PT

      The equipment layout across the site is largely static, though a small piece of machinery has shifted position near the right edge of the frame.

  19. Construction camera frame at 2:30 PM PT. The site appears quiet, with the equipment maintaining its positions from the previous view.
    2:30 PM PT

    The site appears quiet, with the equipment maintaining its positions from the previous view.

  20. Construction camera frame at 2:15 PM PT. The dark pavement area in the lower portion of the site has expanded slightly, now covering more of the graded surface. Otherwise, the configuration of the machinery across the block appears to be unchanged.
    2:15 PM PT

    The dark pavement area in the lower portion of the site has expanded slightly, now covering more of the graded surface. Otherwise, the configuration of the machinery across the block appears to be unchanged.

  21. Construction camera frame at 2:00 PM PT. A light-colored vehicle has moved from the lower-left to the center-left of the site. The positions of the larger earthmoving equipment across the block otherwise appear to be holding.
    2:00 PM PT

    A light-colored vehicle has moved from the lower-left to the center-left of the site. The positions of the larger earthmoving equipment across the block otherwise appear to be holding.

  22. Construction camera frame at 1:45 PM PT. The arrangement of equipment across the site is holding steady, with no significant shifts in position visible between the frames.
    1:45 PM PT

    The arrangement of equipment across the site is holding steady, with no significant shifts in position visible between the frames.

  23. Construction camera frame at 1:30 PM PT. A white pickup truck has entered the site via the driveway on the left, parking near the equipment in that area. The arrangement of the larger machines across the central and upper portions of the site appears to have remained consistent.
    1:30 PM PT

    A white pickup truck has entered the site via the driveway on the left, parking near the equipment in that area. The arrangement of the larger machines across the central and upper portions of the site appears to have remained consistent.

  24. Construction camera frame at 1:15 PM PT. The scene remains remarkably stable, with the positions of the heavy machines appearing almost identical.
    1:15 PM PT

    The scene remains remarkably stable, with the positions of the heavy machines appearing almost identical.

  25. Construction camera frame at 1:00 PM PT. A yellow machine is now visible moving across the lower-center portion of the site. Otherwise, the equipment arrangement appears largely unchanged, maintaining a static presence across the block.
    1:00 PM PT

    A yellow machine is now visible moving across the lower-center portion of the site. Otherwise, the equipment arrangement appears largely unchanged, maintaining a static presence across the block.

  26. Construction camera frame at 12:45 PM PT. The site presents a similar appearance, with only minor adjustments to the positions of some of the smaller machines near the lower-left corner.
    12:45 PM PT

    The site presents a similar appearance, with only minor adjustments to the positions of some of the smaller machines near the lower-left corner.

  27. Construction camera frame at 12:30 PM PT. A yellow machine has shifted its position from the upper-right to the lower-center of the site. Otherwise, the scene remains consistent, with the arrangement of equipment largely holding steady.
    12:30 PM PT

    A yellow machine has shifted its position from the upper-right to the lower-center of the site. Otherwise, the scene remains consistent, with the arrangement of equipment largely holding steady.

  28. Construction camera frame at 12:15 PM PT. ALHLCC-trucks have shifted positions along the left edge and center, while an excavator in the middle of the site has moved slightly to the right.
    12:15 PM PT

    ALHLCC-trucks have shifted positions along the left edge and center, while an excavator in the middle of the site has moved slightly to the right.

  29. Construction camera frame at 12:00 PM PT. A small, orange-and-gray machine has appeared near the center of the site, seemingly having been moved into position from the southwest corner.
    12:00 PM PT

    A small, orange-and-gray machine has appeared near the center of the site, seemingly having been moved into position from the southwest corner.

  30. Construction camera frame at 11:45 AM PT. The arrangement of machinery across the site appears nearly identical to the previous view.
    11:45 AM PT

    The arrangement of machinery across the site appears nearly identical to the previous view.

  31. Construction camera frame at 11:30 AM PT. The scene remains remarkably still, with the equipment largely unmoved from its previous positions.
    11:30 AM PT

    The scene remains remarkably still, with the equipment largely unmoved from its previous positions.

  32. Construction camera frame at 11:15 AM PT. Equipment arrangements appear stable, though a small loader has moved slightly closer to the center of the site.
    11:15 AM PT

    Equipment arrangements appear stable, though a small loader has moved slightly closer to the center of the site.

  33. Construction camera frame at 11:00 AM PT. The site presents a largely unchanged view, with equipment remaining in similar locations as before.
    11:00 AM PT

    The site presents a largely unchanged view, with equipment remaining in similar locations as before.

  34. Construction camera frame at 10:45 AM PT. The machinery on site maintains its arrangement, with no noticeable repositioning of equipment in the last quarter hour.
    10:45 AM PT

    The machinery on site maintains its arrangement, with no noticeable repositioning of equipment in the last quarter hour.

  35. Construction camera frame at 10:30 AM PT. The overall layout of the site remains consistent, with the machines holding their general positions.
    10:30 AM PT

    The overall layout of the site remains consistent, with the machines holding their general positions.

  36. Construction camera frame at 10:15 AM PT. The equipment across the site holds its positions, though one of the excavators near the center has rotated slightly.
    10:15 AM PT

    The equipment across the site holds its positions, though one of the excavators near the center has rotated slightly.

  37. 4 similar no-change frames9:15 AM–10:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 AM PT. The site appears quiet, with no discernible shifts in equipment placement over the last fifteen minutes.
      10:00 AM PT

      The site appears quiet, with no discernible shifts in equipment placement over the last fifteen minutes.

    2. Construction camera frame at 9:45 AM PT. The scene remains remarkably static, with the machinery maintaining its distribution across the site.
      9:45 AM PT

      The scene remains remarkably static, with the machinery maintaining its distribution across the site.

    3. Construction camera frame at 9:30 AM PT. Equipment positions are largely unchanged, though a small yellow machine near the center now faces a slightly different direction.
      9:30 AM PT

      Equipment positions are largely unchanged, though a small yellow machine near the center now faces a slightly different direction.

    4. Construction camera frame at 9:15 AM PT. The site presents a largely unchanged view, with equipment holding its positions across the graded area.
      9:15 AM PT

      The site presents a largely unchanged view, with equipment holding its positions across the graded area.

  38. Construction camera frame at 9:00 AM PT. The arrangement of machines across the site appears stable, with only minor differences visible in their positions.
    9:00 AM PT

    The arrangement of machines across the site appears stable, with only minor differences visible in their positions.

  39. Construction camera frame at 8:45 AM PT. A lone piece of yellow machinery has moved slightly further into the site from the lower right corner. The overall layout of equipment across the graded area remains consistent.
    8:45 AM PT

    A lone piece of yellow machinery has moved slightly further into the site from the lower right corner. The overall layout of equipment across the graded area remains consistent.

  40. 5 similar no-change frames7:30 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. No construction activity — the site is quiet.
      8:30 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 8:15 AM PT. The view remains consistent, with no apparent alterations to the placement of equipment or vehicles over the past fifteen minutes.
      8:15 AM PT

      The view remains consistent, with no apparent alterations to the placement of equipment or vehicles over the past fifteen minutes.

    3. Construction camera frame at 8:00 AM PT. The scene is remarkably static, with the arrangement of equipment appearing nearly identical to the previous view.
      8:00 AM PT

      The scene is remarkably static, with the arrangement of equipment appearing nearly identical to the previous view.

    4. Construction camera frame at 7:45 AM PT. The site’s equipment appears to be holding its positions, with no noticeable movements in the last quarter of an hour.
      7:45 AM PT

      The site’s equipment appears to be holding its positions, with no noticeable movements in the last quarter of an hour.

    5. Construction camera frame at 7:30 AM PT. A small yellow machine has shifted position within the lower right corner of the site, near the trees. The rest of the scene remains largely unchanged, with equipment distributed across the graded area.
      7:30 AM PT

      A small yellow machine has shifted position within the lower right corner of the site, near the trees. The rest of the scene remains largely unchanged, with equipment distributed across the graded area.

  41. Construction camera frame at 7:15 AM PT. A dark-colored truck has entered the site from the driveway on the left and is now positioned near the center. Otherwise, the arrangement of equipment on the graded area remains as it was.
    7:15 AM PT

    A dark-colored truck has entered the site from the driveway on the left and is now positioned near the center. Otherwise, the arrangement of equipment on the graded area remains as it was.

  42. Construction camera frame at 7:00 AM PT. The site shows little discernible difference, with all visible equipment maintaining its prior placement.
    7:00 AM PT

    The site shows little discernible difference, with all visible equipment maintaining its prior placement.

  43. Construction camera frame at 6:45 AM PT. The arrangement of machinery across the site appears stable, with no obvious shifts in position over the last fifteen minutes.
    6:45 AM PT

    The arrangement of machinery across the site appears stable, with no obvious shifts in position over the last fifteen minutes.

  44. Construction camera frame at 6:30 AM PT. The overall layout of the site remains consistent, though a red vehicle has appeared near the trees on the right side of the frame.
    6:30 AM PT

    The overall layout of the site remains consistent, though a red vehicle has appeared near the trees on the right side of the frame.

  45. Construction camera frame at 6:15 AM PT. The scene presents a stable picture, with the arrangement of equipment appearing consistent across the site.
    6:15 AM PT

    The scene presents a stable picture, with the arrangement of equipment appearing consistent across the site.

  46. 8 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The site remains quiet, with equipment holding its positions across the large graded area.
      6:00 AM PT

      The site remains quiet, with equipment holding its positions across the large graded area.

    2. Construction camera frame at 5:45 AM PT. Daylight has returned to the site, revealing several pieces of heavy equipment positioned across the graded area. The scene appears largely unchanged from earlier, with machines remaining in the same positions.
      5:45 AM PT

      Daylight has returned to the site, revealing several pieces of heavy equipment positioned across the graded area. The scene appears largely unchanged from earlier, with machines remaining in the same positions.

    3. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.