Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Thursday, August 13, 2026

Construction log

Thursday, August 13, 2026

69 snapshots from the live camera.


AI digest

The site’s broad graded layout and central cut look much the same as a week earlier, with no clear substantial change in the ground shape. Equipment and trucks shifted around during the day, and a red container was placed near the center; otherwise, activity was limited.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. The site’s appearance is stable, with equipment maintaining its positions from the previous view.
    8:30 PM PT

    The site’s appearance is stable, with equipment maintaining its positions from the previous view.

  4. 4 similar no-change frames7:30 PM–8:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 PM PT. The overall scene appears unchanged, and the arrangement of equipment remains as it was fifteen minutes ago.
      8:15 PM PT

      The overall scene appears unchanged, and the arrangement of equipment remains as it was fifteen minutes ago.

    2. Construction camera frame at 8:00 PM PT. The site shows no significant alterations in the last fifteen minutes, with all visible equipment remaining in the same locations.
      8:00 PM PT

      The site shows no significant alterations in the last fifteen minutes, with all visible equipment remaining in the same locations.

    3. Construction camera frame at 7:45 PM PT. The view across the site is nearly identical, with no visible alterations in equipment positions or activity.
      7:45 PM PT

      The view across the site is nearly identical, with no visible alterations in equipment positions or activity.

    4. Construction camera frame at 7:30 PM PT. The scene remains remarkably consistent, with the positioning of machinery appearing static over the last fifteen minutes.
      7:30 PM PT

      The scene remains remarkably consistent, with the positioning of machinery appearing static over the last fifteen minutes.

  5. Construction camera frame at 7:15 PM PT. Equipment remains in largely the same arrangement as observed earlier, with no noticeable repositioning or new arrivals.
    7:15 PM PT

    Equipment remains in largely the same arrangement as observed earlier, with no noticeable repositioning or new arrivals.

  6. Construction camera frame at 7:00 PM PT. The site presents a very similar view to fifteen minutes ago, with no clear changes in the positions of equipment or materials.
    7:00 PM PT

    The site presents a very similar view to fifteen minutes ago, with no clear changes in the positions of equipment or materials.

  7. 4 similar no-change frames6:00 PM–6:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 PM PT. The site’s appearance is stable, with no discernible shifts in equipment placement or activity during the last fifteen minutes.
      6:45 PM PT

      The site’s appearance is stable, with no discernible shifts in equipment placement or activity during the last fifteen minutes.

    2. Construction camera frame at 6:30 PM PT. The scene is holding steady, with no apparent movement of equipment or materials in the last quarter hour.
      6:30 PM PT

      The scene is holding steady, with no apparent movement of equipment or materials in the last quarter hour.

    3. Construction camera frame at 6:15 PM PT. The layout of the site appears largely unchanged, with the same equipment visible in the same positions.
      6:15 PM PT

      The layout of the site appears largely unchanged, with the same equipment visible in the same positions.

    4. Construction camera frame at 6:00 PM PT. A red container has appeared near the center of the site, seemingly placed in the open area. Otherwise, the equipment and overall scene are unchanged from fifteen minutes ago.
      6:00 PM PT

      A red container has appeared near the center of the site, seemingly placed in the open area. Otherwise, the equipment and overall scene are unchanged from fifteen minutes ago.

  8. Construction camera frame at 5:45 PM PT. The scene remains remarkably consistent, with all visible machinery and materials staying put.
    5:45 PM PT

    The scene remains remarkably consistent, with all visible machinery and materials staying put.

  9. 2 similar no-change frames5:15 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. Equipment positions appear consistent, with no noticeable changes in the layout of the site over the past fifteen minutes.
      5:30 PM PT

      Equipment positions appear consistent, with no noticeable changes in the layout of the site over the past fifteen minutes.

    2. Construction camera frame at 5:15 PM PT. The site presents a largely static picture, with equipment appearing to remain in the same locations.
      5:15 PM PT

      The site presents a largely static picture, with equipment appearing to remain in the same locations.

  10. Construction camera frame at 5:00 PM PT. The site maintains a similar appearance, with equipment largely stationary between the two views.
    5:00 PM PT

    The site maintains a similar appearance, with equipment largely stationary between the two views.

  11. 3 similar no-change frames4:15 PM–4:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:45 PM PT. The scene shows no appreciable differences, with all equipment and vehicles remaining in the same positions as observed previously.
      4:45 PM PT

      The scene shows no appreciable differences, with all equipment and vehicles remaining in the same positions as observed previously.

    2. Construction camera frame at 4:30 PM PT. The site appears much the same as it did moments ago, with no discernible movement of equipment or vehicles.
      4:30 PM PT

      The site appears much the same as it did moments ago, with no discernible movement of equipment or vehicles.

    3. Construction camera frame at 4:15 PM PT. The overall layout of the site remains unchanged, with all visible equipment and vehicles holding their previous positions.
      4:15 PM PT

      The overall layout of the site remains unchanged, with all visible equipment and vehicles holding their previous positions.

  12. Construction camera frame at 4:00 PM PT. The view is consistent, with no detectable shifts in equipment placement or vehicle activity over the last quarter hour.
    4:00 PM PT

    The view is consistent, with no detectable shifts in equipment placement or vehicle activity over the last quarter hour.

  13. Construction camera frame at 3:45 PM PT. The scene remains remarkably stable, with all visible machinery and vehicles holding their positions.
    3:45 PM PT

    The scene remains remarkably stable, with all visible machinery and vehicles holding their positions.

  14. 3 similar no-change frames3:00 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The site presents a nearly identical view, with equipment remaining in the same locations as before.
      3:30 PM PT

      The site presents a nearly identical view, with equipment remaining in the same locations as before.

    2. Construction camera frame at 3:15 PM PT. The site maintains a static appearance, with the equipment positions remaining unchanged in the latest view.
      3:15 PM PT

      The site maintains a static appearance, with the equipment positions remaining unchanged in the latest view.

    3. Construction camera frame at 3:00 PM PT. The scene holds a consistent appearance, with no noticeable changes in the placement of equipment or vehicles.
      3:00 PM PT

      The scene holds a consistent appearance, with no noticeable changes in the placement of equipment or vehicles.

  15. Construction camera frame at 2:45 PM PT. The site appears largely as it was moments ago, with no significant repositioning of equipment or vehicles apparent.
    2:45 PM PT

    The site appears largely as it was moments ago, with no significant repositioning of equipment or vehicles apparent.

  16. 2 similar no-change frames2:15 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The site displays minimal alteration, with the arrangement of equipment largely unchanged from the earlier view.
      2:30 PM PT

      The site displays minimal alteration, with the arrangement of equipment largely unchanged from the earlier view.

    2. Construction camera frame at 2:15 PM PT. No movement is visible across the site, with all machinery and vehicles remaining in place.
      2:15 PM PT

      No movement is visible across the site, with all machinery and vehicles remaining in place.

  17. Construction camera frame at 2:00 PM PT. The overall scene remains stable, with the positions of the heavy equipment and materials appearing consistent between views.
    2:00 PM PT

    The overall scene remains stable, with the positions of the heavy equipment and materials appearing consistent between views.

  18. Construction camera frame at 1:45 PM PT. The arrangement of machines and materials across the site appears to be holding steady, with no obvious shifts in position.
    1:45 PM PT

    The arrangement of machines and materials across the site appears to be holding steady, with no obvious shifts in position.

  19. Construction camera frame at 1:30 PM PT. The equipment layout remains consistent, though a white van is now positioned near the center of the site.
    1:30 PM PT

    The equipment layout remains consistent, though a white van is now positioned near the center of the site.

  20. 4 similar no-change frames12:30 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. The scene presents a consistent view, with no discernible movement of equipment or materials since the last check.
      1:15 PM PT

      The scene presents a consistent view, with no discernible movement of equipment or materials since the last check.

    2. Construction camera frame at 1:00 PM PT. The scene appears largely static, with equipment holding its positions from the previous view.
      1:00 PM PT

      The scene appears largely static, with equipment holding its positions from the previous view.

    3. Construction camera frame at 12:45 PM PT. A yellow machine has shifted its position slightly near the center of the site. The rest of the scene, including the arrangement of other equipment and materials, appears static.
      12:45 PM PT

      A yellow machine has shifted its position slightly near the center of the site. The rest of the scene, including the arrangement of other equipment and materials, appears static.

    4. Construction camera frame at 12:30 PM PT. A white truck is now visible near the center of the site, having moved into the frame from the left. Otherwise, the arrangement of the yellow machines and the overall scene remains largely unchanged.
      12:30 PM PT

      A white truck is now visible near the center of the site, having moved into the frame from the left. Otherwise, the arrangement of the yellow machines and the overall scene remains largely unchanged.

  21. Construction camera frame at 12:15 PM PT. The configuration of machinery and materials on the site remains remarkably similar to the previous view.
    12:15 PM PT

    The configuration of machinery and materials on the site remains remarkably similar to the previous view.

  22. Construction camera frame at 12:00 PM PT. The site’s equipment appears to be in the same locations as it was moments ago, with no obvious shifts in position.
    12:00 PM PT

    The site’s equipment appears to be in the same locations as it was moments ago, with no obvious shifts in position.

  23. Construction camera frame at 11:45 AM PT. A white car has appeared near the center of the site, having entered from the left side. The overall arrangement of heavy equipment and materials looks consistent with the last view.
    11:45 AM PT

    A white car has appeared near the center of the site, having entered from the left side. The overall arrangement of heavy equipment and materials looks consistent with the last view.

  24. Construction camera frame at 11:30 AM PT. A small blue vehicle is now positioned near the red inflatable structure in the northwest corner, having moved from the lower-right. The rest of the site’s configuration looks consistent with the previous view.
    11:30 AM PT

    A small blue vehicle is now positioned near the red inflatable structure in the northwest corner, having moved from the lower-right. The rest of the site’s configuration looks consistent with the previous view.

  25. Construction camera frame at 11:15 AM PT. The red inflatable structure in the northwest corner is now smaller in size. The rest of the site’s layout and equipment positions appear to be holding steady.
    11:15 AM PT

    The red inflatable structure in the northwest corner is now smaller in size. The rest of the site’s layout and equipment positions appear to be holding steady.

  26. Construction camera frame at 11:00 AM PT. A blue truck has entered the site from the driveway on the left, and is now positioned near the center of the block. The rest of the scene appears largely as it did a few minutes ago.
    11:00 AM PT

    A blue truck has entered the site from the driveway on the left, and is now positioned near the center of the block. The rest of the scene appears largely as it did a few minutes ago.

  27. Construction camera frame at 10:45 AM PT. The arrangement of equipment and materials across the site appears largely unchanged in the last quarter hour.
    10:45 AM PT

    The arrangement of equipment and materials across the site appears largely unchanged in the last quarter hour.

  28. Construction camera frame at 10:30 AM PT. The yellow excavator near the center of the site has shifted its position slightly to the left. Otherwise, the overall scene remains very much as it was fifteen minutes ago.
    10:30 AM PT

    The yellow excavator near the center of the site has shifted its position slightly to the left. Otherwise, the overall scene remains very much as it was fifteen minutes ago.

  29. Construction camera frame at 10:15 AM PT. A small, dark-colored vehicle has moved from the lower-right to the upper-right corner of the site. Otherwise, the scene appears quite similar to the previous view.
    10:15 AM PT

    A small, dark-colored vehicle has moved from the lower-right to the upper-right corner of the site. Otherwise, the scene appears quite similar to the previous view.

  30. Construction camera frame at 10:00 AM PT. The scene remains stable, with no discernible shifts in equipment or material placement across the site.
    10:00 AM PT

    The scene remains stable, with no discernible shifts in equipment or material placement across the site.

  31. Construction camera frame at 9:45 AM PT. The red inflatable structure in the northwest corner of the site appears to have deflated somewhat. Otherwise, the layout of equipment and materials across the block remains consistent.
    9:45 AM PT

    The red inflatable structure in the northwest corner of the site appears to have deflated somewhat. Otherwise, the layout of equipment and materials across the block remains consistent.

  32. Construction camera frame at 9:30 AM PT. Activity on the site appears minimal, with the positioning of equipment remaining remarkably consistent over the last fifteen minutes.
    9:30 AM PT

    Activity on the site appears minimal, with the positioning of equipment remaining remarkably consistent over the last fifteen minutes.

  33. Construction camera frame at 9:15 AM PT. The scene presents a consistent picture, with equipment and materials maintaining their positions across the site.
    9:15 AM PT

    The scene presents a consistent picture, with equipment and materials maintaining their positions across the site.

  34. Construction camera frame at 9:00 AM PT. The arrangement of machines and materials across the site appears largely unchanged from the previous view.
    9:00 AM PT

    The arrangement of machines and materials across the site appears largely unchanged from the previous view.

  35. Construction camera frame at 8:45 AM PT. The cluster of dark-colored trucks near the center of the site has shifted position slightly, now appearing more spread out. The rest of the scene maintains a similar appearance to the previous view.
    8:45 AM PT

    The cluster of dark-colored trucks near the center of the site has shifted position slightly, now appearing more spread out. The rest of the scene maintains a similar appearance to the previous view.

  36. Construction camera frame at 8:30 AM PT. A yellow truck is now visible moving along the dark pathway in the lower-center of the site. Apart from that, the arrangement of equipment and material across the block appears stable.
    8:30 AM PT

    A yellow truck is now visible moving along the dark pathway in the lower-center of the site. Apart from that, the arrangement of equipment and material across the block appears stable.

  37. Construction camera frame at 8:15 AM PT. The yellow excavator near the center of the site has rotated slightly, now facing a different direction. The overall scene remains quite still otherwise.
    8:15 AM PT

    The yellow excavator near the center of the site has rotated slightly, now facing a different direction. The overall scene remains quite still otherwise.

  38. Construction camera frame at 8:00 AM PT. The arrangement of equipment and vehicles on site remains largely as it was fifteen minutes ago, with no apparent shifts in position.
    8:00 AM PT

    The arrangement of equipment and vehicles on site remains largely as it was fifteen minutes ago, with no apparent shifts in position.

  39. Construction camera frame at 7:45 AM PT. A light-colored van has moved along the service road on the right side of the site, now positioned further from the entrance. Otherwise, the scene's arrangement of machinery and parked vehicles appears consistent.
    7:45 AM PT

    A light-colored van has moved along the service road on the right side of the site, now positioned further from the entrance. Otherwise, the scene's arrangement of machinery and parked vehicles appears consistent.

  40. Construction camera frame at 7:30 AM PT. A long, dark-colored vehicle has entered the site from the service road on the right, positioning itself alongside other parked trucks. The rest of the scene presents a similar arrangement of equipment to what was visible fifteen minutes ago.
    7:30 AM PT

    A long, dark-colored vehicle has entered the site from the service road on the right, positioning itself alongside other parked trucks. The rest of the scene presents a similar arrangement of equipment to what was visible fifteen minutes ago.

  41. 2 similar no-change frames7:00 AM–7:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 AM PT. Several dark-colored trucks are now positioned in the lower portion of the site, having moved from the far side of the graded area. The rest of the equipment and surrounding streetscape appear static.
      7:15 AM PT

      Several dark-colored trucks are now positioned in the lower portion of the site, having moved from the far side of the graded area. The rest of the equipment and surrounding streetscape appear static.

    2. Construction camera frame at 7:00 AM PT. The scene appears largely unchanged, though a small white vehicle has moved further into the site from the lower-left corner.
      7:00 AM PT

      The scene appears largely unchanged, though a small white vehicle has moved further into the site from the lower-left corner.

  42. Construction camera frame at 6:45 AM PT. The red container near the street has shifted slightly, and a white pickup truck is now visible near the center of the site. Otherwise, the arrangement of equipment across the graded area remains consistent.
    6:45 AM PT

    The red container near the street has shifted slightly, and a white pickup truck is now visible near the center of the site. Otherwise, the arrangement of equipment across the graded area remains consistent.

  43. 2 similar no-change frames6:15 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. A couple of small, dark-colored vehicles have appeared near the right edge of the site, while the rest of the area shows no discernible changes.
      6:30 AM PT

      A couple of small, dark-colored vehicles have appeared near the right edge of the site, while the rest of the area shows no discernible changes.

    2. Construction camera frame at 6:15 AM PT. The scene remains stable, with the equipment largely in the same positions as fifteen minutes ago.
      6:15 AM PT

      The scene remains stable, with the equipment largely in the same positions as fifteen minutes ago.

  44. Construction camera frame at 6:00 AM PT. A yellow machine has shifted position in the central area of the site, while another appears to be moving near the driveway on the left. Otherwise, the graded area and surrounding streetscape remain largely as they were fifteen minutes ago.
    6:00 AM PT

    A yellow machine has shifted position in the central area of the site, while another appears to be moving near the driveway on the left. Otherwise, the graded area and surrounding streetscape remain largely as they were fifteen minutes ago.

  45. Construction camera frame at 5:45 AM PT. The site is now visible with the increasing light, showing a largely undisturbed graded area. Visibility is still limited, but the scene appears much the same as it did a few minutes ago.
    5:45 AM PT

    The site is now visible with the increasing light, showing a largely undisturbed graded area. Visibility is still limited, but the scene appears much the same as it did a few minutes ago.

  46. 6 similar no-change frames12:00 AM–5:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 12All daysAug 14 →