31 days on camera and 2,057 snapshots at 606 106th Ave NE. Each day is summarized below. Open one to see every frame.
The site remained quiet with minimal activity; a dark-colored vehicle and a small white vehicle entered the site, and a small group of people were observed near the center of the graded area.
The site was largely quiet, with only minor repositioning of some excavators and a small yellow machine, and two white pickup trucks entered and exited the site.
The site remained mostly quiet through the day, with only small shifts in equipment and a few vehicles moving through the work area. Compared with the week-earlier frame, the central ground area appears lower and more cut back, though the day’s frames show no substantial change.
The site’s graded surface and equipment layout changed little over the day; a few vehicles appeared or shifted, but no substantial ground change is evident. Compared with July 28, the central area is visibly lower and more broadly cut, with machinery repositioned around it.
The broad graded area and its stepped edges look much the same as a week earlier, with no clear large-scale change in the ground. Equipment shifted around during the day, and a dark truck and white pickup appeared near the left and central areas, but the site was otherwise largely quiet.
The site was mostly quiet, with machinery holding position for much of the day; a dark truck and several other vehicles briefly moved through the central work area. Compared with July 30, the broad central cut remains in place, with only subtle changes to the worked surface and no clear large-scale change visible today.
A yellow excavator moved material in the graded area, and several trucks arrived and departed throughout the day. A small pile of material appeared near the center of the site by the end of the day.
The site was largely quiet, with excavators and other tracked equipment staying in roughly the same positions; a white pickup entered, and several smaller machines shifted slightly during the day. Compared with August 1, the broad central cut and surrounding graded areas look much the same, with no substantial ground change visible.
The site was largely quiet, with equipment mostly holding position; a small pile of light-colored material grew near the lower-left excavator, and several smaller machines and vehicles shifted around the site. Compared with the week-earlier frame, the broad graded areas and overall layout appear much the same, with no substantial ground change visible today.
Activity focused on the lower-center graded area, where a darker patch of disturbed earth expanded and shifted shape, with yellow excavators rotating and repositioning within that area. Several vehicles, including a dump truck, a dark-colored truck, and white pickup trucks, entered and moved around the site throughout the day.
A compact drill rig and a yellow excavator repositioned slightly, and several vehicles entered and exited the site throughout the day, but no substantial changes to the graded area were observed.
The site saw significant activity today, with a large pile of material appearing in the center of the site by the end of the day, and numerous trucks entering and moving around the central area. Throughout the day, excavators and a small loader shifted positions, and several white trucks and a white van arrived on site.
The site’s broad graded layout and central cut look much the same as a week earlier, with no clear substantial change in the ground shape. Equipment and trucks shifted around during the day, and a red container was placed near the center; otherwise, activity was limited.
The site’s broad layout remained much the same as a week earlier, with the large central cut and surrounding equipment still in place. Trucks and machines shifted around during the day, including a line of vehicles along the cut’s upper edge, but the final view shows no substantial change to the ground or site layout.
The site was largely quiet, with heavy equipment holding nearly the same positions throughout the day; a few machines shifted slightly, and vehicles entered from the left driveway. Compared with August 8, the central cut is visibly larger, but there was no substantial change between today’s first and last frames.
The site was largely quiet, with machinery holding its positions through the day; a red vehicle entered from the left driveway and moved farther into the site. A small pile of material appeared near the center, but there was no clear broader change to the graded ground.
The site remained largely quiet, with heavy equipment mostly holding position; a darker track spread and shifted across the central graded area, and a few machines moved slightly. Vehicles came and went, including pickups and vans, while a concrete mixer was briefly seen on the service road; no major change to the site layout is evident.
The site remained largely quiet, with heavy equipment holding its positions and only minor adjustments noted. Compared with August 11, the central ground appears more uneven, with darker disturbed patches in the lower area; a red container was also visible in the southwest, but no substantial change occurred during the day.
The site was largely quiet, with heavy equipment and stockpiles staying in place; small vehicles shifted around and several vans and trucks entered during the day. Compared with August 12, the broad graded areas and central cut look much the same, with no substantial change visible.
The site was largely quiet, with machinery holding position through most of the day; a few small machines shifted, and several trucks or vehicles appeared along the driveway and right-side service road. The ground and overall site layout show no substantial change.
The site was quiet today, with no visible activity or changes to the ground or machinery.
No construction activity — the site is quiet.
The site was largely quiet, with machinery holding position; a small red-and-white vehicle moved farther into the block during the day. Compared with the week-earlier frame, the broad graded areas and central cut look much the same, with no substantial ground change visible.
The site remained largely quiet, with equipment and vehicles mostly holding position; a few trucks and small machines shifted around during the day. Compared with August 17, the ground layout appears broadly similar, with no clear substantial change visible.
The site remained largely quiet, with machinery clustered across the upper area and only minor repositioning; several vehicles appeared at the access points during the day. Compared with August 18, the central ground area looks more uneven and cut down, though the frames do not show a clear change in the site’s overall layout.
The site remained largely quiet throughout the day, with minor shifts in equipment positions, including an excavator rotating and a small loader moving to the center. Several vehicles, including red trucks and a white vehicle, entered the site at various times.
The site remained largely quiet, with the heavy equipment clustered along the far side and the graded area showing no clear change from the week-earlier frame. Small vehicles moved around the site during the day, and a dark truck was visible near the center by the final frame.
The site was largely quiet, with the equipment layout and graded ground appearing unchanged through the day. A dark truck was visible near the right side, and a red vehicle moved across the site; no substantial ground or structural change is apparent.
The site remained largely quiet, with only brief vehicle arrivals and minor repositioning of equipment reported. Compared with August 22, the graded ground and central cut look broadly similar; no substantial change is clear in today’s frames.
No construction activity — the site is quiet.
No construction activity — the site is quiet.