Construction log
54 snapshots from the live camera.
A quiet day on the Onni 606 site: the rig line, cranes and excavators held their positions across the observations, with no trucks visibly entering or leaving, and the only real changes were shifting sunlight, the swinging of a yellow excavator and vehicle movement on the street. The last frame is too dark to confirm any activity after dusk.

Frame saved. Automated comparison was skipped; activity has not been assessed.
The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is reduced by the blue cast and dim light, so changes are hard to judge. The rig line, cranes and excavators appear in similar positions, with no trucks visibly entering or leaving through the left driveway or right service road. A few small items near the left street edge look slightly different, but this is not clear enough to call activity.

Small changes: the blue crane at lower-left appears to have shifted position, and the yellow excavator near upper-center has moved slightly. Other rigs, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road. Frame color is shifted blue, so comparison confidence is reduced.

Small changes: the yellow excavator at upper-center now sits slightly rotated and a blue machine near its base has shifted, while the rig line, cranes and other excavators hold their positions. No trucks are visibly entering or leaving through the left driveway or right service road.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes: the yellow excavator near the upper-center has swung slightly toward the right, and a small orange-clad figure has appeared near the left edge by the street. The rig line, cranes and other excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes: a white van is now visible on the left street near the site driveway, and a dark vehicle at the upper-left street has moved. A small orange-clad figure is near the left edge, and the yellow excavator near the upper-center holds its position. The main rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes: the yellow excavator near the upper-center has swung slightly, and a yellow machine near the mid-right edge is no longer visible. The main rig line, cranes and other excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

A yellow excavator near the center-right of the block has moved from its earlier spot to a new position near the upper-center, and a yellow excavator near the mid-right edge is no longer where it was. A white pickup has appeared on the left street near the site driveway, and an orange-clad figure is visible near the left edge. Other rigs and cranes hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

A yellow excavator near the center-right of the block has swung to a new position, now angled toward the right edge, while the rest of the rig line and cranes hold their positions. A red vehicle is visible near the upper-right edge outside the site fence, and a white van appears on the left street. No trucks are visibly entering or leaving through the left driveway or right service road.

Sunlight patches on the block have shifted, and a small figure near the upper-center appears to have moved. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes at the edges: a dark vehicle on the left street has shifted position, and the red vehicle near the lower-right corner of the site is no longer visible. The main rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes at the edges: a red vehicle appears near the lower-right corner of the site, and a dark vehicle on the left street has shifted position. The main rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. Sunlight patches on the block have shifted slightly, while the rig line, cranes and excavators hold their positions and no trucks are visibly entering or leaving.

Sunlight has shifted across the block, with the upper-center and right side now darker. Small figures near the top-center and mid-right appear to be people on site, but the rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. Sunlight has shifted, with the upper-center and right side of the block now darker, while the rig line, cranes and excavators hold their positions and no trucks are visibly entering or leaving through the left driveway or right service road.

Sunlight has shifted, with the left side of the block now lit and the right side darker, but the rig line, cranes and excavators hold their positions. No trucks are visibly entering or leaving through the left driveway or right service road.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

No visible change between these frames. Sunlight patches on the right side of the block have shifted slightly, while the rig line, cranes and excavators hold their positions and no trucks are entering or leaving.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Sunlight has shifted and the right side of the block is now largely in shade, with the lighter patches on the ground gone from the center-right. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Sunlight has shifted, now covering the right half of the site. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change in equipment or vehicles between these frames. The sunlit patch has shifted, now covering the right half of the site, and the rig line, cranes and excavators hold their positions. No trucks are visibly entering or leaving through the left driveway or right service road.

The sunlit patch has largely faded from the site, leaving the lighting flatter across the block. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Several machines have shifted between frames: the yellow excavator near the upper left street edge has moved, and the excavator at upper center has rotated toward the rig line. The sunlit patch has moved across the center and left of the site. The rig line and crane hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The sunlit patch has shifted across the left half of the site, and the rig, cranes and excavators hold their positions.

Small changes only: the lighting across the site has shifted, with a bright sunlit patch now covering the left half. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes only: a red machine near the upper center of the site has moved, and a few vehicles on the left street edge have shifted position. The rig line, cranes and excavators otherwise hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes only: the red machine near the left street edge has moved slightly, and a few vehicles on the left road have shifted position. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes only: the yellow excavator near the lower center of the site has shifted slightly, and a few vehicles on the left street edge have moved along the road. The rig line, cranes and other excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

Small changes only: a worker in an orange vest is visible walking near the center of the site, and the red machine at upper left has moved closer to the left-side street edge. The rig line, cranes and excavators otherwise hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

A white box truck and a small blue vehicle are visible on the left side street edge near the site driveway, and a red machine appears near the left edge of the site; otherwise the cranes, excavators and rig line hold their positions.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

No visible change between these frames.

No visible change between these frames. Rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road. A bus is visible on the street at upper left in the current frame, outside the site.

No visible change between these frames. Rig line, cranes and excavators hold their positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. The rig line, cranes and excavators are in the same positions, and no trucks are visibly entering or leaving through the left driveway or right service road.

No visible change between these frames. Frames are readable, with the rig line, cranes and excavators in place, but nothing clearly moved between captures.
The images were too unclear to assess activity. Expand to inspect each dated frame; darkness is not evidence of inactivity.

Visibility has improved since the earlier dark frame, so the site is now readable. Compared with the earlier frame, which was too dark to assess, the current view shows the block with equipment and excavated ground in place, but I can't confirm any movement between the two frames, so I'm not reporting activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.

Visibility is too low to assess construction activity.