Construction log
17 days on camera and 867 snapshots at 606 106th Ave NE. Each day is summarized below. Open one to see every frame.
Visibility is too low to assess construction activity.
The day opened with a blank, washed-out first frame, so the comparison rests on the last frame: the site is now dimmed by evening light, with the blue crane mast standing near center and the yellow excavator at lower center in a visibly different spot than the October 26 reference. Beyond that, most activity was minor repositioning of vehicles and machines around the edges, with no clear large-scale earth movement or new structure vis
The site was mostly quiet on November 3, with machines shifting at the edges and a blue crane boom lowered to a shallower angle over the block. The sandy area at right-center and upper-center was reworked into darker ground, and the central drill rig and parked equipment otherwise stayed in place, with no trucks clearly entering or leaving through the driveway.
Quiet day on the Onni 606 block: the drill rig, excavators and parked machines stayed essentially in place across the day, with only minor shifts such as a yellow excavator rotating slightly and a few street-side vehicles coming and going. Comparing the first and last frames against the reference from a week earlier, no new structure or significant earth movement is visible, and the lighting change (dawn-like haze to c
Quiet day at Onni 606: the central drilling rig and excavators stayed in place, with only minor repositioning and a brief box truck and van visit on the street and service road. The first and last frames are dim, low-light views, so the day's activity is judged mainly from the logged observations, and the wider site looks largely unchanged from the week-earlier reference.
Quiet day at Onni 606: the pile rig, crane, and central excavators stayed in place, with only minor vehicle and machine shifts at the block edges and no clear change to the ground or new structure. Lighting shifted from dusk to near-dark across the day, so the camera's readability varied, and the last frame compared with the baseline shows the same overall earthwork footprint.
A quiet day on the Onni 606 site: the crane, drill rigs and excavators stayed in place, with only brief soil-pile changes and minor vehicle movement on the street. Compared with the baseline from October 31, the block looks largely unchanged, with the ground still in its earthwork state and no new structure visible.
Visibility is too low to assess construction activity.
Quiet day on the Onni 606 site: traffic on the street edges came and went and the mound near the center-right was reshaped, but the central crane, equipment row and excavators stayed in place. The frames show no substantial new ground change or structure relative to the week-earlier reference.
A quiet day on the Onni 606 site: the logged changes were mostly minor repositioning of the orange and red machines along the edges and vehicles passing on the street, with the main crane, drill rig and excavators essentially in place. The first and last frames show no clear change in the ground itself, and no earth movement or new structure is visible compared with the week-earlier reference frame.
A quiet day on the Onni 606 site: the rig line, cranes and excavators held their positions across the observations, with no trucks visibly entering or leaving, and the only real changes were shifting sunlight, the swinging of a yellow excavator and vehicle movement on the street. The last frame is too dark to confirm any activity after dusk.
Quiet day at the Onni 606 site: the drilling rig, mid-block equipment cluster, lower-center excavator and blue crane stayed in their positions, with only small machines and vehicles on the street and at the edges shifting. Compared with the November 5 reference frame, no new structure or large earth movement is visible, and the site appears largely unchanged, with the lighting dimmer in the final frame.
Quiet day on the Onni 606 site: the pile-rig zone, yellow excavators and blue crane stayed largely in place, with only minor repositioning of the orange machines, loaders and vehicles on the street and service roads. No visible earth moved or new structure formed, and the frames shift to evening blue tones by close of day.
A quiet day on the Onni 606 site: machinery stayed largely in place across the frames, with only minor repositioning around the drill rig cluster and a few vehicles moving along the left street as dusk fell. Compared with the reference frame from November 7, no substantial new earthwork or structure is visible, and no trucks entered or left through either access route.
Visibility is too low to assess construction activity.
Quiet day on the Onni 606 site: the excavators, crane and drilling-rig cluster shifted position repeatedly through the day, with a temporary mound of disturbed soil formed and then flattened, but no truck arrivals or departures were visible, and the frames show no clear change in the site's overall ground shape or structure compared with the November 9 baseline.
Visibility is too low to assess construction activity.