Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, June 5, 2026

Construction log

Friday, June 5, 2026

46 snapshots from the live camera.


AI digest

A significant section of the roof collapsed, and excavators actively worked to reposition and dig into the growing rubble pile throughout the day. Flatbed and dump trucks entered and exited the site, and a yellow loader moved debris in the staging area, while pooling water was observed and later receded.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. Darkness continues to dominate the view, and no changes are apparent in the equipment or debris layout.
    11:00 PM PT

    Darkness continues to dominate the view, and no changes are apparent in the equipment or debris layout.

  2. 2 similar no-change frames9:15 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. Visibility is low and the site is quiet, with darkness obscuring any potential activity.
      10:00 PM PT

      Visibility is low and the site is quiet, with darkness obscuring any potential activity.

    2. Construction camera frame at 9:15 PM PT. The site presents a similar view as before, with no noticeable alterations to the machinery or debris.
      9:15 PM PT

      The site presents a similar view as before, with no noticeable alterations to the machinery or debris.

  3. Construction camera frame at 9:00 PM PT. The scene is holding steady, with no obvious shifts in equipment or the accumulation of debris.
    9:00 PM PT

    The scene is holding steady, with no obvious shifts in equipment or the accumulation of debris.

  4. Construction camera frame at 8:45 PM PT. The demolition site remains relatively static, showing no significant movement of machinery or changes to the debris field.
    8:45 PM PT

    The demolition site remains relatively static, showing no significant movement of machinery or changes to the debris field.

  5. Construction camera frame at 8:30 PM PT. A white pickup truck has entered the site from the street on the left.
    8:30 PM PT

    A white pickup truck has entered the site from the street on the left.

  6. Construction camera frame at 8:15 PM PT. The site appears quiet, with no discernible changes in equipment positions or the size of the rubble pile.
    8:15 PM PT

    The site appears quiet, with no discernible changes in equipment positions or the size of the rubble pile.

  7. Construction camera frame at 8:00 PM PT. Activity remains minimal, with the site appearing largely as it was a few moments ago.
    8:00 PM PT

    Activity remains minimal, with the site appearing largely as it was a few moments ago.

  8. Construction camera frame at 7:45 PM PT. The rubble pile has grown slightly, with the excavator continuing to feed debris into it.
    7:45 PM PT

    The rubble pile has grown slightly, with the excavator continuing to feed debris into it.

  9. Construction camera frame at 7:30 PM PT. The scene presents a largely unchanged view, with equipment remaining in the same positions as before.
    7:30 PM PT

    The scene presents a largely unchanged view, with equipment remaining in the same positions as before.

  10. Construction camera frame at 7:15 PM PT. A small lift truck has entered the site via the service road on the right.
    7:15 PM PT

    A small lift truck has entered the site via the service road on the right.

  11. Construction camera frame at 7:00 PM PT. The staging area shows a slight rearrangement of dumpsters and smaller debris piles, though the main equipment positions haven't shifted.
    7:00 PM PT

    The staging area shows a slight rearrangement of dumpsters and smaller debris piles, though the main equipment positions haven't shifted.

  12. Construction camera frame at 6:45 PM PT. The excavator appears to be pausing its work, now stationary near the center of the rubble pile.
    6:45 PM PT

    The excavator appears to be pausing its work, now stationary near the center of the rubble pile.

  13. Construction camera frame at 6:30 PM PT. The scene appears stable, with no obvious shifts in equipment or the debris field since the last check-in.
    6:30 PM PT

    The scene appears stable, with no obvious shifts in equipment or the debris field since the last check-in.

  14. Construction camera frame at 6:15 PM PT. Despite the ongoing work, the overall scene remains quite similar to the previous view.
    6:15 PM PT

    Despite the ongoing work, the overall scene remains quite similar to the previous view.

  15. Construction camera frame at 6:00 PM PT. The rubble pile has grown noticeably, with the excavator continuing to break down the remaining structure.
    6:00 PM PT

    The rubble pile has grown noticeably, with the excavator continuing to break down the remaining structure.

  16. Construction camera frame at 5:45 PM PT. A dump truck is pulling out of the driveway on the left, heading onto the street.
    5:45 PM PT

    A dump truck is pulling out of the driveway on the left, heading onto the street.

  17. Construction camera frame at 5:30 PM PT. A loader is now actively moving debris within the upper-left staging area, while a second vehicle waits near the driveway.
    5:30 PM PT

    A loader is now actively moving debris within the upper-left staging area, while a second vehicle waits near the driveway.

  18. Construction camera frame at 5:15 PM PT. The excavator has shifted its focus again, now working on the western edge of the rubble pile.
    5:15 PM PT

    The excavator has shifted its focus again, now working on the western edge of the rubble pile.

  19. Construction camera frame at 5:00 PM PT. The scene is largely unchanged, though the water level appears to have dropped slightly across the site.
    5:00 PM PT

    The scene is largely unchanged, though the water level appears to have dropped slightly across the site.

  20. Construction camera frame at 4:45 PM PT. The excavator is now positioned differently within the rubble pile, digging at a new section of the debris.
    4:45 PM PT

    The excavator is now positioned differently within the rubble pile, digging at a new section of the debris.

  21. Construction camera frame at 4:30 PM PT. Water has pooled extensively across the demolition site, creating significant puddles in the parking lot and around the rubble.
    4:30 PM PT

    Water has pooled extensively across the demolition site, creating significant puddles in the parking lot and around the rubble.

  22. Construction camera frame at 4:15 PM PT. The site is holding steady, with equipment and the debris pile remaining in roughly the same positions as before.
    4:15 PM PT

    The site is holding steady, with equipment and the debris pile remaining in roughly the same positions as before.

  23. Construction camera frame at 4:00 PM PT. A dump truck is exiting the site via the driveway on the left, while another appears to be maneuvering into position in the upper-left staging area.
    4:00 PM PT

    A dump truck is exiting the site via the driveway on the left, while another appears to be maneuvering into position in the upper-left staging area.

  24. 2 similar no-change frames3:30 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. Despite the passage of time, the demolition site appears remarkably consistent, with no significant alterations to the equipment layout or rubble accumulation.
      3:45 PM PT

      Despite the passage of time, the demolition site appears remarkably consistent, with no significant alterations to the equipment layout or rubble accumulation.

    2. Construction camera frame at 3:30 PM PT. The overall scene remains quite static, with no apparent shifts in equipment or the debris field.
      3:30 PM PT

      The overall scene remains quite static, with no apparent shifts in equipment or the debris field.

  25. Construction camera frame at 3:15 PM PT. The rubble pile has grown slightly, with the excavator continuing to move material around within it.
    3:15 PM PT

    The rubble pile has grown slightly, with the excavator continuing to move material around within it.

  26. Construction camera frame at 3:00 PM PT. A small orange traffic cone has appeared near the driveway entrance on the left side of the frame.
    3:00 PM PT

    A small orange traffic cone has appeared near the driveway entrance on the left side of the frame.

  27. Construction camera frame at 2:45 PM PT. The scene looks largely unchanged, with the same equipment positions and rubble pile size as before.
    2:45 PM PT

    The scene looks largely unchanged, with the same equipment positions and rubble pile size as before.

  28. Construction camera frame at 2:30 PM PT. The excavator in the center of the rubble pile is now actively digging, shifting debris within the existing pile.
    2:30 PM PT

    The excavator in the center of the rubble pile is now actively digging, shifting debris within the existing pile.

  29. Construction camera frame at 2:15 PM PT. The demolition zone shows minimal change over the past fifteen minutes, with equipment remaining in largely the same positions.
    2:15 PM PT

    The demolition zone shows minimal change over the past fifteen minutes, with equipment remaining in largely the same positions.

  30. Construction camera frame at 2:00 PM PT. A dump truck is exiting the site via the driveway on the left, and another appears to be waiting to enter.
    2:00 PM PT

    A dump truck is exiting the site via the driveway on the left, and another appears to be waiting to enter.

  31. Construction camera frame at 1:45 PM PT. The site appears stable, with no discernible shifts in equipment or the height of the debris pile.
    1:45 PM PT

    The site appears stable, with no discernible shifts in equipment or the height of the debris pile.

  32. Construction camera frame at 1:30 PM PT. A yellow loader has moved into position near the rubble pile, and a second one is visible further back in the staging area.
    1:30 PM PT

    A yellow loader has moved into position near the rubble pile, and a second one is visible further back in the staging area.

  33. 6 similar no-change frames12:00 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. The demolition site remains quiet, showing no obvious progress or movement of equipment since the last view.
      1:15 PM PT

      The demolition site remains quiet, showing no obvious progress or movement of equipment since the last view.

    2. Construction camera frame at 1:00 PM PT. No significant alterations are visible in the demolition area during the last fifteen minutes.
      1:00 PM PT

      No significant alterations are visible in the demolition area during the last fifteen minutes.

    3. Construction camera frame at 12:45 PM PT. The scene presents a static view, with no apparent movement of machinery or demolition progress in the last fifteen minutes.
      12:45 PM PT

      The scene presents a static view, with no apparent movement of machinery or demolition progress in the last fifteen minutes.

    4. Construction camera frame at 12:30 PM PT. The scene remains largely unchanged, with equipment and the building’s remnants in the same positions as before.
      12:30 PM PT

      The scene remains largely unchanged, with equipment and the building’s remnants in the same positions as before.

    5. Construction camera frame at 12:15 PM PT. Everything on site appears to be holding steady, with no noticeable shifts in the debris field or equipment locations.
      12:15 PM PT

      Everything on site appears to be holding steady, with no noticeable shifts in the debris field or equipment locations.

    6. Construction camera frame at 12:00 PM PT. The rubble pile appears slightly larger, though the change is incremental, and the excavator remains in the same location.
      12:00 PM PT

      The rubble pile appears slightly larger, though the change is incremental, and the excavator remains in the same location.

  34. Construction camera frame at 11:45 AM PT. A flatbed truck has entered the site and is backing toward the debris pile. Otherwise, the scene remains consistent with the previous view.
    11:45 AM PT

    A flatbed truck has entered the site and is backing toward the debris pile. Otherwise, the scene remains consistent with the previous view.

  35. Construction camera frame at 11:30 AM PT. The demolition site shows no discernible difference in structure or equipment placement over the last quarter hour.
    11:30 AM PT

    The demolition site shows no discernible difference in structure or equipment placement over the last quarter hour.

  36. Construction camera frame at 11:15 AM PT. The site continues at a standstill, with no visible alterations to the building or the placement of the machinery.
    11:15 AM PT

    The site continues at a standstill, with no visible alterations to the building or the placement of the machinery.

  37. Construction camera frame at 11:00 AM PT. The demolition site appears stable, with machinery and the building’s remaining structure holding their positions.
    11:00 AM PT

    The demolition site appears stable, with machinery and the building’s remaining structure holding their positions.

  38. Construction camera frame at 10:45 AM PT. The scene remains largely static, with no apparent changes to the building’s structure or equipment positions.
    10:45 AM PT

    The scene remains largely static, with no apparent changes to the building’s structure or equipment positions.

  39. Construction camera frame at 10:30 AM PT. A significant section of the building’s roof has now collapsed into the rubble pile. The excavator near the debris is repositioning itself, digging into the wreckage.
    10:30 AM PT

    A significant section of the building’s roof has now collapsed into the rubble pile. The excavator near the debris is repositioning itself, digging into the wreckage.

All daysJun 6 →