Construction log
26 days on camera and 1,833 snapshots at 606 106th Ave NE. Each day is summarized below. Open one to see every frame.
A significant section of the roof collapsed, and excavators actively worked to reposition and dig into the growing rubble pile throughout the day. Flatbed and dump trucks entered and exited the site, and a yellow loader moved debris in the staging area, while pooling water was observed and later receded.
A crane swung a load, an excavator shifted positions and continued working, and the rubble pile grew throughout the day. A small yellow vehicle, a black pickup truck, and a small blue vehicle entered the site, while multiple dump trucks arrived, loaded, and departed. A yellow loader and a second loader moved debris in the staging area, and a boom lift was added to the staging area.
No construction activity — the site is quiet.
The excavator worked on the rubble pile throughout the day, digging into debris, breaking down a remaining wall, and adding to the pile. A boom lift was raised and lowered, and a small crane was raised in the upper-left staging area. A dark-colored truck, a red truck, and a large white truck entered the site at various times.
Crews demolished the remaining section of the low-rise building across the center of the lot, reducing it to a broad field of concrete rubble, and then proceeded to tear down the northern building, leaving a pile of orange steel along the back of the lot. Excavators spent the rest of the day processing and sorting the debris from both structures.
Throughout the day, excavators worked on the remaining structures, visibly increasing the central debris pile, and a new orange excavator arrived on site. Several dump trucks entered and exited, and various pieces of equipment, including loaders and a mini-excavator, repositioned within the staging and work areas.
The debris field was noticeably rearranged during the day: the broad upper area appears clearer, while material is shifted around the central remaining structure. A white vehicle is parked beside it by the last frame; otherwise, visible activity was limited and no major change to the remaining structure is apparent.
The remaining structure was further reduced over the week, with debris spread across the center of the site; during the day, the main excavator worked intermittently and added to the debris pile, while trucks and a loader shifted around the staging areas. Activity was mostly quiet later, with no major change visible between the day’s first and last frames.
A substantial change is visible compared with June 6: most of the standing wall is now gone, leaving a broad debris field and a smaller remnant near the center. Activity was intermittent today, with a section of wall collapsing, the central pile growing, and excavators shifting position; a dump truck departed and trucks appeared on the service road, while the site otherwise remained largely steady.
The remaining wall section was smaller than in the June 7 reference, with more debris accumulated at its base. The excavator shifted between sections of the debris early in the day, then activity largely stopped and the site remained unchanged.
The site changed little over the day: the central debris field and remaining low structures look much the same in the first and last frames, with no clear substantial shift in the ground or materials. Observations describe intermittent excavator and loader activity and trucks coming and going, but the site was mostly quiet in the later checks.
The site was mostly quiet, but the excavator worked intermittently and the central debris mound grew modestly as material was shifted; a second excavator and a blue dump truck appeared, while a dump truck later left. By the final frame, the overall layout remained similar to the start of the day.
The site changed little over the day: the central debris field and equipment appear much the same in the first and last frames, with no clear substantial shift in ground conditions. Observations note the excavator working around the pile and dump trucks leaving and entering via the left driveway; activity was mostly quiet.
The site was quiet overall: an excavator worked intermittently in the central debris pile, which observations describe as growing slightly, while loaders and trucks moved through the staging area and service road. By the last frame, no substantial change to the site layout is apparent.
The site was largely quiet, with only minor repositioning of equipment and trucks entering or leaving; the central debris pile appears slightly larger in some observations. The first and last frames show no substantial change in the site’s overall layout.
The site was quiet throughout the day, with no visible movement of equipment or change to the ground. Compared with June 13, the lot appears cleared of the debris and machinery visible in that earlier frame, but no further change is apparent today.
The site remained largely unchanged throughout the day, with no clear shift in equipment or ground conditions. A small white vehicle entered via the left driveway.
The site was largely quiet, with only brief equipment repositioning and truck movements; the observations report small incremental changes to the debris pile, but little sustained activity. Compared with the week-earlier frame, the lot appears substantially cleared of the large debris piles, with a broad, relatively level surface and a few pieces of equipment remaining.
The site was largely quiet, with no clear change in the ground or equipment layout between the day’s frames. A few trucks came and went, and workers and loaders were briefly visible in the staging area.
The site was mostly quiet, with only brief vehicle and loader repositioning reported; the first and last frames show no clear change in the ground or equipment layout. Compared with June 17, the visible area is largely cleared, but the day’s frames do not establish further substantial progress.
The site was quiet overall, with no clear change to the ground or equipment layout; a truck and several smaller vehicles briefly moved through or repositioned near the staging area. Low light obscured detail, and the final view remains much like the first.
The site remained largely quiet, with no clear change in the ground or equipment layout between the day’s frames and the week-earlier view. Vehicles came and went and machinery shifted briefly, but no substantial site progress is visible.
The site remained largely unchanged through the day, with no clear shift in the ground or material visible in the frames. A truck and an excavator were reported moving during the day, but the site was quiet by the final view.
The site remained largely unchanged through the day, with no clear change to the ground or material piles. A dump truck and pickup were briefly reported entering, and the loader shifted position, but no sustained work or substantial progress is visible.
The site was mostly quiet, with only brief activity as the central excavator worked the material pile and a loader shifted material; a few vehicles arrived, but no substantial change to the ground or overall layout is evident by day’s end. Compared with June 22, the broad graded surface and equipment arrangement appear largely unchanged.
The site was largely quiet, with no clear change to the ground or equipment between the day’s first and last frames. Observations report intermittent excavator activity and a modest increase in the central debris pile, along with vehicles entering or repositioning in the staging area.