Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, June 6, 2026

Construction log

Saturday, June 6, 2026

73 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

A crane swung a load, an excavator shifted positions and continued working, and the rubble pile grew throughout the day. A small yellow vehicle, a black pickup truck, and a small blue vehicle entered the site, while multiple dump trucks arrived, loaded, and departed. A yellow loader and a second loader moved debris in the staging area, and a boom lift was added to the staging area.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. A dump truck has exited the site via the driveway on the left, and the excavator is now working slightly further back into the rubble pile.
    9:15 PM PT

    A dump truck has exited the site via the driveway on the left, and the excavator is now working slightly further back into the rubble pile.

  4. The scene remains quite static, though a small loader is now visible moving amongst the debris in the upper-left staging area.
    9:00 PM PT

    The scene remains quite static, though a small loader is now visible moving amongst the debris in the upper-left staging area.

  5. The rubble pile appears to have grown slightly, with the excavator continuing to break down material in the center of the site.
    8:45 PM PT

    The rubble pile appears to have grown slightly, with the excavator continuing to break down material in the center of the site.

  6. The demolition site appears largely unchanged, with the excavator continuing its work on the central rubble.
    8:30 PM PT

    The demolition site appears largely unchanged, with the excavator continuing its work on the central rubble.

  7. Not much appears different, though the excavator seems to be working at a slightly lower level within the rubble.
    8:15 PM PT

    Not much appears different, though the excavator seems to be working at a slightly lower level within the rubble.

  8. The excavator is now digging deeper into the rubble, and a second piece of heavy machinery has appeared in the upper-left staging area.
    8:00 PM PT

    The excavator is now digging deeper into the rubble, and a second piece of heavy machinery has appeared in the upper-left staging area.

  9. The excavator appears to be focused on a new area of the rubble, and a second loader has moved into the upper-left staging area.
    7:45 PM PT

    The excavator appears to be focused on a new area of the rubble, and a second loader has moved into the upper-left staging area.

  10. A large dump truck is now positioned near the driveway on the left, appearing to be loading with debris.
    7:30 PM PT

    A large dump truck is now positioned near the driveway on the left, appearing to be loading with debris.

  11. The scene remains quite stable, with no obvious shifts in the positions of equipment or the size of the debris pile.
    7:15 PM PT

    The scene remains quite stable, with no obvious shifts in the positions of equipment or the size of the debris pile.

  12. The rubble pile has grown slightly, with the excavator continuing to break down the remaining structure.
    7:00 PM PT

    The rubble pile has grown slightly, with the excavator continuing to break down the remaining structure.

  13. The excavator is now working on a different section of the rubble pile, and a small blue vehicle has entered the site via the service road on the right.
    6:45 PM PT

    The excavator is now working on a different section of the rubble pile, and a small blue vehicle has entered the site via the service road on the right.

  14. A loader is now actively moving debris within the upper-left staging area, and a second dump truck has pulled onto the site via the service road on the right.
    6:30 PM PT

    A loader is now actively moving debris within the upper-left staging area, and a second dump truck has pulled onto the site via the service road on the right.

  15. The scene appears largely unchanged, with the excavator continuing to sort through the rubble pile and equipment remaining in the same positions.
    6:15 PM PT

    The scene appears largely unchanged, with the excavator continuing to sort through the rubble pile and equipment remaining in the same positions.

  16. The excavator appears to be working at a slightly different angle within the rubble, but overall the scene is holding steady.
    6:00 PM PT

    The excavator appears to be working at a slightly different angle within the rubble, but overall the scene is holding steady.

  17. The site holds a similar appearance to the previous view, with no significant alterations to equipment positioning or the extent of demolition.
    5:45 PM PT

    The site holds a similar appearance to the previous view, with no significant alterations to equipment positioning or the extent of demolition.

  18. A black pickup truck has appeared in the staging area, parked near the front loader. Otherwise, the demolition scene remains remarkably static, with the excavator continuing its work on the central debris.
    5:30 PM PT

    A black pickup truck has appeared in the staging area, parked near the front loader. Otherwise, the demolition scene remains remarkably static, with the excavator continuing its work on the central debris.

  19. A dump truck is pulling out of the driveway on the left, heading onto the street. Otherwise, the scene remains consistent, with the excavator continuing to work within the rubble pile.
    5:15 PM PT

    A dump truck is pulling out of the driveway on the left, heading onto the street. Otherwise, the scene remains consistent, with the excavator continuing to work within the rubble pile.

  20. The rubble pile has grown slightly, with more material appearing at the base of the remaining structure.
    5:00 PM PT

    The rubble pile has grown slightly, with more material appearing at the base of the remaining structure.

  21. The demolition site presents a stable picture, with no readily visible changes in equipment or debris levels over the last quarter hour.
    4:45 PM PT

    The demolition site presents a stable picture, with no readily visible changes in equipment or debris levels over the last quarter hour.

  22. The scene appears largely unchanged, though the water has continued to drain slowly from the lower portions of the site.
    4:30 PM PT

    The scene appears largely unchanged, though the water has continued to drain slowly from the lower portions of the site.

  23. The water level has dropped noticeably across the site, revealing more of the muddy ground.
    4:15 PM PT

    The water level has dropped noticeably across the site, revealing more of the muddy ground.

  24. The site continues in a similar state, with standing water dominating the view and no obvious alterations to the demolition progress.
    4:00 PM PT

    The site continues in a similar state, with standing water dominating the view and no obvious alterations to the demolition progress.

  25. The site holds relatively still, with no noticeable movement of equipment or changes to the debris field.
    3:45 PM PT

    The site holds relatively still, with no noticeable movement of equipment or changes to the debris field.

  26. The scene remains steady, with no apparent shifts in machinery or the size of the rubble pile.
    3:30 PM PT

    The scene remains steady, with no apparent shifts in machinery or the size of the rubble pile.

  27. Despite the wet conditions, the site shows no significant alterations in equipment positioning or debris accumulation.
    3:15 PM PT

    Despite the wet conditions, the site shows no significant alterations in equipment positioning or debris accumulation.

  28. The overall scene is consistent, though the pooling water appears to be receding slightly.
    3:00 PM PT

    The overall scene is consistent, though the pooling water appears to be receding slightly.

  29. The demolition site appears largely unchanged, though the ground is noticeably wetter now.
    2:45 PM PT

    The demolition site appears largely unchanged, though the ground is noticeably wetter now.

  30. The excavator appears to be working at a slightly different angle, continuing to dismantle the central structure.
    2:30 PM PT

    The excavator appears to be working at a slightly different angle, continuing to dismantle the central structure.

  31. A dump truck is pulling out of the driveway on the left, heading onto the street.
    2:15 PM PT

    A dump truck is pulling out of the driveway on the left, heading onto the street.

  32. The site remains remarkably static, with equipment largely unmoved and the debris pile holding its current form.
    2:00 PM PT

    The site remains remarkably static, with equipment largely unmoved and the debris pile holding its current form.

  33. The scene presents a very similar view, with no apparent movement of equipment or significant change to the debris field.
    1:45 PM PT

    The scene presents a very similar view, with no apparent movement of equipment or significant change to the debris field.

  34. The site holds steady, with no significant shifts in the positions of machinery or the size of the debris pile.
    1:30 PM PT

    The site holds steady, with no significant shifts in the positions of machinery or the size of the debris pile.

  35. A boom lift has been added to the staging area, positioned near the large crane.
    1:15 PM PT

    A boom lift has been added to the staging area, positioned near the large crane.

  36. The rubble pile has visibly increased in size, with the excavator continuing to break down the remaining structure.
    1:00 PM PT

    The rubble pile has visibly increased in size, with the excavator continuing to break down the remaining structure.

  37. The demolition site appears largely unchanged from the last check, with equipment holding its positions.
    12:45 PM PT

    The demolition site appears largely unchanged from the last check, with equipment holding its positions.

  38. A loader is now actively moving debris within the staging area, repositioning materials near the dumpsters.
    12:30 PM PT

    A loader is now actively moving debris within the staging area, repositioning materials near the dumpsters.

  39. The scene remains stable, with little to no noticeable alteration in equipment placement or debris accumulation.
    12:15 PM PT

    The scene remains stable, with little to no noticeable alteration in equipment placement or debris accumulation.

  40. The excavator appears to be working a different section of the rubble pile now, shifting its focus slightly to the right.
    12:00 PM PT

    The excavator appears to be working a different section of the rubble pile now, shifting its focus slightly to the right.

  41. The staging area has a noticeable addition: a second dump truck is now parked near the crane.
    11:45 AM PT

    The staging area has a noticeable addition: a second dump truck is now parked near the crane.

  42. The site shows only minor adjustments, with the excavator continuing work at the rubble pile’s edge.
    11:30 AM PT

    The site shows only minor adjustments, with the excavator continuing work at the rubble pile’s edge.

  43. The rubble pile has visibly grown, with additional debris now accumulated at its base.
    11:15 AM PT

    The rubble pile has visibly grown, with additional debris now accumulated at its base.

  44. The demolition site appears largely consistent, with no significant changes to the position of equipment or the size of the debris pile.
    11:00 AM PT

    The demolition site appears largely consistent, with no significant changes to the position of equipment or the size of the debris pile.

  45. A dump truck is exiting the site via the driveway on the left.
    10:45 AM PT

    A dump truck is exiting the site via the driveway on the left.

  46. The scene remains remarkably static, with no obvious shifts in machinery or debris accumulation over the last quarter hour.
    10:30 AM PT

    The scene remains remarkably static, with no obvious shifts in machinery or debris accumulation over the last quarter hour.

  47. A yellow loader has moved into the central area of the demolition site, working near the base of the rubble pile.
    10:15 AM PT

    A yellow loader has moved into the central area of the demolition site, working near the base of the rubble pile.

  48. The demolition site presents a largely unchanged view, with equipment and debris remaining in similar positions.
    10:00 AM PT

    The demolition site presents a largely unchanged view, with equipment and debris remaining in similar positions.

  49. There’s been no noticeable alteration to the demolition site in the last fifteen minutes, with all machinery appearing in the same locations.
    9:45 AM PT

    There’s been no noticeable alteration to the demolition site in the last fifteen minutes, with all machinery appearing in the same locations.

  50. The rubble pile appears slightly larger, with the central excavator continuing to work at its base.
    9:30 AM PT

    The rubble pile appears slightly larger, with the central excavator continuing to work at its base.

  51. The excavator in the center of the frame is now positioned slightly differently, digging into a new section of the debris.
    9:15 AM PT

    The excavator in the center of the frame is now positioned slightly differently, digging into a new section of the debris.

  52. A dump truck has exited the site via the driveway on the left, and another appears to be taking its place.
    9:00 AM PT

    A dump truck has exited the site via the driveway on the left, and another appears to be taking its place.

  53. The scene is holding steady, with no major alterations to the layout of equipment or the size of the rubble pile.
    8:45 AM PT

    The scene is holding steady, with no major alterations to the layout of equipment or the size of the rubble pile.

  54. The overall scene remains quite static, with no significant shifts in equipment placement or debris levels visible.
    8:30 AM PT

    The overall scene remains quite static, with no significant shifts in equipment placement or debris levels visible.

  55. The site holds a largely unchanged appearance, with equipment remaining in the same positions as before.
    8:15 AM PT

    The site holds a largely unchanged appearance, with equipment remaining in the same positions as before.

  56. The site’s configuration is almost identical to the previous view, with no readily apparent changes in machinery positions or debris accumulation.
    8:00 AM PT

    The site’s configuration is almost identical to the previous view, with no readily apparent changes in machinery positions or debris accumulation.

  57. The demolition continues at a similar pace, although the excavator now appears to be working on a different section of the rubble pile.
    7:45 AM PT

    The demolition continues at a similar pace, although the excavator now appears to be working on a different section of the rubble pile.

  58. The scene presents a remarkably similar view to the last check, with no obvious movement of equipment or substantial changes to the debris.
    7:30 AM PT

    The scene presents a remarkably similar view to the last check, with no obvious movement of equipment or substantial changes to the debris.

  59. The demolition site appears stable, with no immediately discernible changes in the position of machinery or the extent of the debris.
    7:15 AM PT

    The demolition site appears stable, with no immediately discernible changes in the position of machinery or the extent of the debris.

  60. The site’s appearance is consistent with the previous view, showing no immediately noticeable differences in equipment or the debris field.
    7:00 AM PT

    The site’s appearance is consistent with the previous view, showing no immediately noticeable differences in equipment or the debris field.

  61. The scene remains quite steady, showing no significant alterations in the layout of equipment or the size of the debris.
    6:45 AM PT

    The scene remains quite steady, showing no significant alterations in the layout of equipment or the size of the debris.

  62. A small yellow vehicle has entered the site via the driveway on the left, and is now positioned near the staging area. Beyond that, the scene remains largely unchanged, with consistent equipment placement and debris levels.
    6:30 AM PT

    A small yellow vehicle has entered the site via the driveway on the left, and is now positioned near the staging area. Beyond that, the scene remains largely unchanged, with consistent equipment placement and debris levels.

  63. The rubble pile appears to have grown incrementally, with the excavator continuing to work within it. No other notable shifts in equipment or vehicle traffic are visible at this time.
    6:15 AM PT

    The rubble pile appears to have grown incrementally, with the excavator continuing to work within it. No other notable shifts in equipment or vehicle traffic are visible at this time.

  64. The demolition site shows a continuation of the previous state, with no readily apparent changes in debris or equipment positioning.
    6:00 AM PT

    The demolition site shows a continuation of the previous state, with no readily apparent changes in debris or equipment positioning.

  65. The scene presents a remarkably similar appearance to the last check, with no obvious alterations to equipment or the rubble pile.
    5:45 AM PT

    The scene presents a remarkably similar appearance to the last check, with no obvious alterations to equipment or the rubble pile.

  66. The excavator in the center of the rubble pile has shifted position slightly, now facing a different direction. Otherwise, the overall scene appears stable, with no significant changes in equipment placement or debris levels.
    5:30 AM PT

    The excavator in the center of the rubble pile has shifted position slightly, now facing a different direction. Otherwise, the overall scene appears stable, with no significant changes in equipment placement or debris levels.

  67. A crane is now positioned near the upper-left corner, actively swinging a load toward the staging area. Otherwise, the scene appears consistent with the prior view, showing no major shifts in the debris field or equipment positions.
    5:15 AM PT

    A crane is now positioned near the upper-left corner, actively swinging a load toward the staging area. Otherwise, the scene appears consistent with the prior view, showing no major shifts in the debris field or equipment positions.

  68. Daylight has returned to the site, revealing no substantial alterations to the arrangement of equipment or debris since the last view.
    5:00 AM PT

    Daylight has returned to the site, revealing no substantial alterations to the arrangement of equipment or debris since the last view.

  69. The site remains shrouded in darkness, with no discernible differences from the previous view.
    4:00 AM PT

    The site remains shrouded in darkness, with no discernible differences from the previous view.

  70. The scene remains largely indistinct due to the continued darkness, with no discernible shifts in the layout of equipment or debris.
    3:00 AM PT

    The scene remains largely indistinct due to the continued darkness, with no discernible shifts in the layout of equipment or debris.

  71. The darkness persists, offering no clear indication of movement or change on the site.
    2:00 AM PT

    The darkness persists, offering no clear indication of movement or change on the site.

  72. The site remains in darkness, and conditions haven't shifted enough to reveal any new activity.
    1:00 AM PT

    The site remains in darkness, and conditions haven't shifted enough to reveal any new activity.

  73. The site appears unchanged, with darkness still limiting what can be observed.
    12:00 AM PT

    The site appears unchanged, with darkness still limiting what can be observed.

← Jun 5All daysJun 7 →