Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, June 8, 2026

Construction log

Monday, June 8, 2026

60 snapshots from the live camera.


AI digest

The excavator worked on the rubble pile throughout the day, digging into debris, breaking down a remaining wall, and adding to the pile. A boom lift was raised and lowered, and a small crane was raised in the upper-left staging area. A dark-colored truck, a red truck, and a large white truck entered the site at various times.

▶ Play this day as a timelapse
  1. Construction camera frame at 6:30 PM PT. The site continues to show little to no progression, with the machinery and debris maintaining their established positions.
    6:30 PM PT

    The site continues to show little to no progression, with the machinery and debris maintaining their established positions.

  2. 3 similar no-change frames5:45 PM–6:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 PM PT. The scene remains remarkably consistent, with no discernible change in the arrangement of equipment or the size of the rubble pile.
      6:15 PM PT

      The scene remains remarkably consistent, with no discernible change in the arrangement of equipment or the size of the rubble pile.

    2. Construction camera frame at 6:00 PM PT. The demolition site is holding its pattern, with no noticeable shifts in the positions of machinery or debris.
      6:00 PM PT

      The demolition site is holding its pattern, with no noticeable shifts in the positions of machinery or debris.

    3. Construction camera frame at 5:45 PM PT. The site presents a largely unchanged view, with the equipment and debris remaining in similar positions.
      5:45 PM PT

      The site presents a largely unchanged view, with the equipment and debris remaining in similar positions.

  3. Construction camera frame at 5:30 PM PT. The demolition site shows minimal alteration, with equipment and the rubble pile remaining in roughly the same arrangement.
    5:30 PM PT

    The demolition site shows minimal alteration, with equipment and the rubble pile remaining in roughly the same arrangement.

  4. 2 similar no-change frames5:00 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The demolition site appears static, with the machinery and debris field holding their positions from the last check-in.
      5:15 PM PT

      The demolition site appears static, with the machinery and debris field holding their positions from the last check-in.

    2. Construction camera frame at 5:00 PM PT. The site remains quiet, with no apparent movement of equipment or changes to the debris pile.
      5:00 PM PT

      The site remains quiet, with no apparent movement of equipment or changes to the debris pile.

  5. Construction camera frame at 4:45 PM PT. The demolition site presents a nearly identical picture, with no obvious shifts in debris or equipment locations.
    4:45 PM PT

    The demolition site presents a nearly identical picture, with no obvious shifts in debris or equipment locations.

  6. Construction camera frame at 4:30 PM PT. The scene holds steady, with the demolition site maintaining its previous configuration and level of activity.
    4:30 PM PT

    The scene holds steady, with the demolition site maintaining its previous configuration and level of activity.

  7. Construction camera frame at 4:15 PM PT. The staging area on the upper-left now hosts a large white truck, which was not present in the previous view.
    4:15 PM PT

    The staging area on the upper-left now hosts a large white truck, which was not present in the previous view.

  8. 3 similar no-change frames3:30 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The scene remains largely unchanged, with equipment and debris in similar positions as the previous view.
      4:00 PM PT

      The scene remains largely unchanged, with equipment and debris in similar positions as the previous view.

    2. Construction camera frame at 3:45 PM PT. The site shows little discernible difference, with the machinery and rubble remaining in the same positions.
      3:45 PM PT

      The site shows little discernible difference, with the machinery and rubble remaining in the same positions.

    3. Construction camera frame at 3:30 PM PT. The site appears stable, showing no significant alterations in equipment placement or the size of the debris field.
      3:30 PM PT

      The site appears stable, showing no significant alterations in equipment placement or the size of the debris field.

  9. Construction camera frame at 3:15 PM PT. The view is remarkably consistent, with the equipment and debris field appearing virtually identical to the previous check.
    3:15 PM PT

    The view is remarkably consistent, with the equipment and debris field appearing virtually identical to the previous check.

  10. Construction camera frame at 3:00 PM PT. The site presents a similar view, with no readily apparent shifts in equipment or debris accumulation.
    3:00 PM PT

    The site presents a similar view, with no readily apparent shifts in equipment or debris accumulation.

  11. Construction camera frame at 2:45 PM PT. The demolition site is holding steady, with no noticeable movement of equipment or significant changes to the debris.
    2:45 PM PT

    The demolition site is holding steady, with no noticeable movement of equipment or significant changes to the debris.

  12. Construction camera frame at 2:30 PM PT. Things are quiet on site, with the equipment and debris appearing in roughly the same arrangement as before.
    2:30 PM PT

    Things are quiet on site, with the equipment and debris appearing in roughly the same arrangement as before.

  13. Construction camera frame at 2:15 PM PT. The scene remains largely unchanged, with equipment holding its positions and the debris pile showing minimal growth.
    2:15 PM PT

    The scene remains largely unchanged, with equipment holding its positions and the debris pile showing minimal growth.

  14. Construction camera frame at 2:00 PM PT. The rubble pile has grown slightly, with the excavator continuing to break down the remaining structure.
    2:00 PM PT

    The rubble pile has grown slightly, with the excavator continuing to break down the remaining structure.

  15. Construction camera frame at 1:45 PM PT. The site appears stable, with no obvious shifts in the positions of equipment or the size of the debris.
    1:45 PM PT

    The site appears stable, with no obvious shifts in the positions of equipment or the size of the debris.

  16. Construction camera frame at 1:30 PM PT. The site is holding remarkably still, with no apparent changes in equipment positions or the overall debris field.
    1:30 PM PT

    The site is holding remarkably still, with no apparent changes in equipment positions or the overall debris field.

  17. Construction camera frame at 1:15 PM PT. The excavator has shifted position, now focusing on a different part of the remaining structure.
    1:15 PM PT

    The excavator has shifted position, now focusing on a different part of the remaining structure.

  18. 3 similar no-change frames12:30 PM–1:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:00 PM PT. The site holds steady, showing no significant alterations to the equipment layout or the size of the debris pile.
      1:00 PM PT

      The site holds steady, showing no significant alterations to the equipment layout or the size of the debris pile.

    2. Construction camera frame at 12:45 PM PT. The demolition site presents a consistent picture, with no noticeable movement of machinery or increase in debris accumulation.
      12:45 PM PT

      The demolition site presents a consistent picture, with no noticeable movement of machinery or increase in debris accumulation.

    3. Construction camera frame at 12:30 PM PT. The scene remains largely unchanged, though the excavator appears to be working on a slightly different section of the remaining structure.
      12:30 PM PT

      The scene remains largely unchanged, though the excavator appears to be working on a slightly different section of the remaining structure.

  19. Construction camera frame at 12:15 PM PT. The rubble pile has visibly grown as the excavator continues work on the remaining structure.
    12:15 PM PT

    The rubble pile has visibly grown as the excavator continues work on the remaining structure.

  20. Construction camera frame at 12:00 PM PT. The demolition site appears quiet, with no discernible shifts in equipment or the debris field over the last fifteen minutes.
    12:00 PM PT

    The demolition site appears quiet, with no discernible shifts in equipment or the debris field over the last fifteen minutes.

  21. Construction camera frame at 11:45 AM PT. A small crane has been raised in the upper-left staging area, and appears to be repositioning materials.
    11:45 AM PT

    A small crane has been raised in the upper-left staging area, and appears to be repositioning materials.

  22. Construction camera frame at 11:30 AM PT. The demolition site maintains a similar appearance, with no clear changes to the rubble or equipment positions.
    11:30 AM PT

    The demolition site maintains a similar appearance, with no clear changes to the rubble or equipment positions.

  23. 3 similar no-change frames10:45 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The view of the demolition site is remarkably steady, with no apparent alterations to equipment placement or the size of the debris.
      11:15 AM PT

      The view of the demolition site is remarkably steady, with no apparent alterations to equipment placement or the size of the debris.

    2. Construction camera frame at 11:00 AM PT. The demolition site presents a consistent view, with equipment and the debris pile showing no significant movement in the last quarter hour.
      11:00 AM PT

      The demolition site presents a consistent view, with equipment and the debris pile showing no significant movement in the last quarter hour.

    3. Construction camera frame at 10:45 AM PT. The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing stable.
      10:45 AM PT

      The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing stable.

  24. Construction camera frame at 10:30 AM PT. The excavator is actively working to break down a section of the remaining wall, adding to the growing rubble pile.
    10:30 AM PT

    The excavator is actively working to break down a section of the remaining wall, adding to the growing rubble pile.

  25. Construction camera frame at 10:15 AM PT. The site appears static, with no noticeable shifts in equipment or the debris pile over the last fifteen minutes.
    10:15 AM PT

    The site appears static, with no noticeable shifts in equipment or the debris pile over the last fifteen minutes.

  26. Construction camera frame at 10:00 AM PT. Activity on site appears minimal, as the equipment and debris field maintain roughly the same positions as before.
    10:00 AM PT

    Activity on site appears minimal, as the equipment and debris field maintain roughly the same positions as before.

  27. Construction camera frame at 9:45 AM PT. The excavator has repositioned itself slightly, now working on a different section of the rubble pile near the center.
    9:45 AM PT

    The excavator has repositioned itself slightly, now working on a different section of the rubble pile near the center.

  28. Construction camera frame at 9:30 AM PT. Demolition continues at a steady pace, as the excavator has shifted its focus to the far side of the rubble pile.
    9:30 AM PT

    Demolition continues at a steady pace, as the excavator has shifted its focus to the far side of the rubble pile.

  29. Construction camera frame at 9:15 AM PT. The excavator is now digging at a noticeably lower level within the rubble pile, further exposing the building’s foundation.
    9:15 AM PT

    The excavator is now digging at a noticeably lower level within the rubble pile, further exposing the building’s foundation.

  30. Construction camera frame at 9:00 AM PT. The scene remains largely unchanged, with equipment holding its positions and no obvious progress in demolition.
    9:00 AM PT

    The scene remains largely unchanged, with equipment holding its positions and no obvious progress in demolition.

  31. Construction camera frame at 8:45 AM PT. The excavator appears to be working at a slightly different angle within the rubble pile, though the overall debris field doesn’t seem to have grown significantly.
    8:45 AM PT

    The excavator appears to be working at a slightly different angle within the rubble pile, though the overall debris field doesn’t seem to have grown significantly.

  32. Construction camera frame at 8:30 AM PT. The boom lift in the upper-left staging area is now lowered, and a red truck has entered the site via the service road along the right edge of the frame.
    8:30 AM PT

    The boom lift in the upper-left staging area is now lowered, and a red truck has entered the site via the service road along the right edge of the frame.

  33. Construction camera frame at 8:15 AM PT. Activity on site is minimal, with the excavator maintaining its position within the rubble and no new vehicles arriving.
    8:15 AM PT

    Activity on site is minimal, with the excavator maintaining its position within the rubble and no new vehicles arriving.

  34. Construction camera frame at 8:00 AM PT. The rubble pile appears slightly larger, with the excavator continuing to work within its center.
    8:00 AM PT

    The rubble pile appears slightly larger, with the excavator continuing to work within its center.

  35. Construction camera frame at 7:45 AM PT. The excavator is now positioned further back within the rubble pile, appearing to be focused on a different section of the debris. Otherwise, the site holds steady with no apparent shifts in equipment or material.
    7:45 AM PT

    The excavator is now positioned further back within the rubble pile, appearing to be focused on a different section of the debris. Otherwise, the site holds steady with no apparent shifts in equipment or material.

  36. Construction camera frame at 7:30 AM PT. A boom lift has been raised in the upper-left staging area, and a dark-colored truck has entered the site via the driveway off the street. Otherwise, the demolition site appears much as it did moments ago.
    7:30 AM PT

    A boom lift has been raised in the upper-left staging area, and a dark-colored truck has entered the site via the driveway off the street. Otherwise, the demolition site appears much as it did moments ago.

  37. Construction camera frame at 7:15 AM PT. The excavator in the rubble pile has shifted position slightly, now digging further into the debris.
    7:15 AM PT

    The excavator in the rubble pile has shifted position slightly, now digging further into the debris.

  38. 14 similar no-change frames12:00 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The scene remains largely static, with no significant changes in equipment positions or demolition progress.
      7:00 AM PT

      The scene remains largely static, with no significant changes in equipment positions or demolition progress.

    2. Construction camera frame at 6:45 AM PT. No construction activity — the site is quiet.
      6:45 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 5:15 AM PT. No construction activity — the site is quiet.
      5:15 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 7All daysJun 9 →