Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, June 9, 2026

Construction log

Tuesday, June 9, 2026

58 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

Crews demolished the remaining section of the low-rise building across the center of the lot, reducing it to a broad field of concrete rubble, and then proceeded to tear down the northern building, leaving a pile of orange steel along the back of the lot. Excavators spent the rest of the day processing and sorting the debris from both structures.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:15 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  8. The site presents a remarkably similar view, with no significant alterations to the equipment or debris arrangement.
    8:00 PM PT

    The site presents a remarkably similar view, with no significant alterations to the equipment or debris arrangement.

  9. The demolition site maintains a consistent appearance, with no noticeable shifts in equipment or debris positioning.
    7:45 PM PT

    The demolition site maintains a consistent appearance, with no noticeable shifts in equipment or debris positioning.

  10. The site appears largely unchanged, with the same positioning of machinery and debris as before.
    7:30 PM PT

    The site appears largely unchanged, with the same positioning of machinery and debris as before.

  11. The rubble pile appears to have grown slightly, with more debris now visible at its base.
    7:15 PM PT

    The rubble pile appears to have grown slightly, with more debris now visible at its base.

  12. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  13. An excavator is now visible working at the base of the rubble pile where it wasn't previously.
    6:45 PM PT

    An excavator is now visible working at the base of the rubble pile where it wasn't previously.

  14. The scene remains steady, with equipment and the debris pile holding their positions from the last observation.
    6:30 PM PT

    The scene remains steady, with equipment and the debris pile holding their positions from the last observation.

  15. The staging area now has a dump truck pulling out via the driveway on the left side of the frame.
    6:15 PM PT

    The staging area now has a dump truck pulling out via the driveway on the left side of the frame.

  16. The staging area shows a slight shift, with a dark-colored vehicle now positioned where a gap was visible before.
    6:00 PM PT

    The staging area shows a slight shift, with a dark-colored vehicle now positioned where a gap was visible before.

  17. The activity level remains quiet, with the equipment and debris pile appearing largely unchanged in position.
    5:45 PM PT

    The activity level remains quiet, with the equipment and debris pile appearing largely unchanged in position.

  18. A loader has moved from the upper-left staging area and is now positioned closer to the central rubble pile.
    5:30 PM PT

    A loader has moved from the upper-left staging area and is now positioned closer to the central rubble pile.

  19. The rubble pile has visibly grown, with more debris now extending towards the lower-right corner of the frame.
    5:15 PM PT

    The rubble pile has visibly grown, with more debris now extending towards the lower-right corner of the frame.

  20. The site presents a similar view to the last check, with no apparent movement of machinery or substantial changes to the debris field.
    5:00 PM PT

    The site presents a similar view to the last check, with no apparent movement of machinery or substantial changes to the debris field.

  21. The site holds steady, with no significant changes to equipment placement or the accumulation of debris.
    4:45 PM PT

    The site holds steady, with no significant changes to equipment placement or the accumulation of debris.

  22. The scene shows very little difference from the previous view, with equipment largely unmoved and the debris pile appearing stable.
    4:30 PM PT

    The scene shows very little difference from the previous view, with equipment largely unmoved and the debris pile appearing stable.

  23. The excavator is now angled slightly differently, appearing to focus on a new section of the rubble pile, while the staging area remains much as it was.
    4:15 PM PT

    The excavator is now angled slightly differently, appearing to focus on a new section of the rubble pile, while the staging area remains much as it was.

  24. A dump truck is exiting the site via the service road on the right, heading away from the camera.
    4:00 PM PT

    A dump truck is exiting the site via the service road on the right, heading away from the camera.

  25. The demolition site appears much the same as before, with no noticeable shifts in equipment positions or the size of the debris pile.
    3:45 PM PT

    The demolition site appears much the same as before, with no noticeable shifts in equipment positions or the size of the debris pile.

  26. The scene remains largely static, with equipment holding its positions and minimal visible alteration to the rubble pile.
    3:30 PM PT

    The scene remains largely static, with equipment holding its positions and minimal visible alteration to the rubble pile.

  27. The loader in the upper-left has moved further back into the staging area, now positioned closer to the stacked materials; the rubble pile remains largely consistent.
    3:15 PM PT

    The loader in the upper-left has moved further back into the staging area, now positioned closer to the stacked materials; the rubble pile remains largely consistent.

  28. The loader in the upper-left staging area is now facing a different direction, having rotated slightly toward the center of the lot; the rubble pile appears unchanged.
    3:00 PM PT

    The loader in the upper-left staging area is now facing a different direction, having rotated slightly toward the center of the lot; the rubble pile appears unchanged.

  29. The excavator on the right has shifted position, now digging deeper into the rubble pile as a loader remains steady in the upper-left staging area.
    2:45 PM PT

    The excavator on the right has shifted position, now digging deeper into the rubble pile as a loader remains steady in the upper-left staging area.

  30. A long yellow vehicle pulls in off the left driveway toward the staging area; out on the lot the excavators work on, both the center and northern buildings now reduced to debris.
    2:30 PM PT

    A long yellow vehicle pulls in off the left driveway toward the staging area; out on the lot the excavators work on, both the center and northern buildings now reduced to debris.

  31. Quieter progress — a loader shifts in the staging area as the excavators keep grading down the central rubble across the cleared site.
    2:15 PM PT

    Quieter progress — a loader shifts in the staging area as the excavators keep grading down the central rubble across the cleared site.

  32. An excavator digs into the right side of the central pile while a loader repositions in the upper-left staging area; both demolished buildings remain spread as debris.
    2:00 PM PT

    An excavator digs into the right side of the central pile while a loader repositions in the upper-left staging area; both demolished buildings remain spread as debris.

  33. The central rubble pile grows again as an excavator feeds more broken concrete into it; both cleared building footprints lie wide open.
    1:45 PM PT

    The central rubble pile grows again as an excavator feeds more broken concrete into it; both cleared building footprints lie wide open.

  34. Crews sort the wreckage — pulling rebar and steel from the crushed concrete across the center, the northern building's frame stacked behind.
    1:30 PM PT

    Crews sort the wreckage — pulling rebar and steel from the crushed concrete across the center, the northern building's frame stacked behind.

  35. The excavators keep processing the central debris, working the concrete down toward the middle of the cleared footprint.
    1:15 PM PT

    The excavators keep processing the central debris, working the concrete down toward the middle of the cleared footprint.

  36. An excavator shifts to the left side of the central rubble, clawing the broken concrete into a tighter pile as steel is separated out toward the north edge.
    1:00 PM PT

    An excavator shifts to the left side of the central rubble, clawing the broken concrete into a tighter pile as steel is separated out toward the north edge.

  37. A dump truck pulls out the left driveway. The site is now two broad debris fields — concrete across the center, orange steel along the north — being worked down by the excavators.
    12:45 PM PT

    A dump truck pulls out the left driveway. The site is now two broad debris fields — concrete across the center, orange steel along the north — being worked down by the excavators.

  38. A boom lift repositions at the center bays as excavators sort the rubble; the day's two losses, the center and northern buildings, are both down to debris now.
    12:30 PM PT

    A boom lift repositions at the center bays as excavators sort the rubble; the day's two losses, the center and northern buildings, are both down to debris now.

  39. Little fresh demolition this frame — the machines pause over the central rubble, the northern building already reduced to its scattered orange steelwork.
    12:15 PM PT

    Little fresh demolition this frame — the machines pause over the central rubble, the northern building already reduced to its scattered orange steelwork.

  40. Two excavators work the central rubble field while the felled steel of the northern building heaps along the back of the lot; both structures are down to debris.
    12:00 PM PT

    Two excavators work the central rubble field while the felled steel of the northern building heaps along the back of the lot; both structures are down to debris.

  41. The northern building is largely down — a wide pile of orange steel now lies along the top of the lot, the tower fully exposed behind it.
    11:45 AM PT

    The northern building is largely down — a wide pile of orange steel now lies along the top of the lot, the tower fully exposed behind it.

  42. The northern building's steel frame collapses into a bright tangle against the tower, while excavators keep grinding the central concrete rubble below.
    11:30 AM PT

    The northern building's steel frame collapses into a bright tangle against the tower, while excavators keep grinding the central concrete rubble below.

  43. The northern building is coming apart: orange steel framing is being wrenched loose at the top of the lot, worked by a long-reach excavator with a boom lift alongside.
    11:15 AM PT

    The northern building is coming apart: orange steel framing is being wrenched loose at the top of the lot, worked by a long-reach excavator with a boom lift alongside.

  44. The red sign on the tower at the top of the lot is suddenly exposed — crews have started pulling down the northern building in front of it, the long-reach machine tearing at its frame.
    11:00 AM PT

    The red sign on the tower at the top of the lot is suddenly exposed — crews have started pulling down the northern building in front of it, the long-reach machine tearing at its frame.

  45. Work shifts to the back of the lot: the long-reach excavator moves up to the northern building beneath the tower while the center field sits flattened.
    10:45 AM PT

    Work shifts to the back of the lot: the long-reach excavator moves up to the northern building beneath the tower while the center field sits flattened.

  46. A loader works the upper-left staging area near the blue dumpsters while the excavators keep crushing concrete on the cleared center footprint.
    10:30 AM PT

    A loader works the upper-left staging area near the blue dumpsters while the excavators keep crushing concrete on the cleared center footprint.

  47. The central rubble pile builds higher as the excavators concentrate it — only a few concrete column stubs and a slab edge are still standing.
    10:15 AM PT

    The central rubble pile builds higher as the excavators concentrate it — only a few concrete column stubs and a slab edge are still standing.

  48. The center building is now a low rubble field end to end; excavators crawl across it, breaking the debris into smaller piles.
    10:00 AM PT

    The center building is now a low rubble field end to end; excavators crawl across it, breaking the debris into smaller piles.

  49. A dump truck pulls away along the service road on the right. Behind it the center building is essentially flattened, with the long-reach machine working the last low remnant.
    9:45 AM PT

    A dump truck pulls away along the service road on the right. Behind it the center building is essentially flattened, with the long-reach machine working the last low remnant.

  50. Excavators pick through the collapsed center building, crushing the fallen slabs; the structure is now little more than a broad field of broken concrete.
    9:30 AM PT

    Excavators pick through the collapsed center building, crushing the fallen slabs; the structure is now little more than a broad field of broken concrete.

  51. A big step: the standing section of the center building has come down, dropping a long slab of wall flat across the foreground — only stubs and a low remnant remain.
    9:15 AM PT

    A big step: the standing section of the center building has come down, dropping a long slab of wall flat across the foreground — only stubs and a low remnant remain.

  52. Most of the center building's right side is down now, and an excavator shifts to a fresh section of the rubble to keep breaking it apart.
    9:00 AM PT

    Most of the center building's right side is down now, and an excavator shifts to a fresh section of the rubble to keep breaking it apart.

  53. The long-reach excavator on the right brings down more of the center building's standing end; fresh debris tumbles onto the widening rubble field.
    8:45 AM PT

    The long-reach excavator on the right brings down more of the center building's standing end; fresh debris tumbles onto the widening rubble field.

  54. Steady going on the central pile — the excavators hold their ground, gnawing at the same stretch of collapsed structure.
    8:30 AM PT

    Steady going on the central pile — the excavators hold their ground, gnawing at the same stretch of collapsed structure.

  55. The center building's rubble pile grows as an excavator works inside it, chewing through what is left of the slab and walls.
    8:15 AM PT

    The center building's rubble pile grows as an excavator works inside it, chewing through what is left of the slab and walls.

  56. A blue flatbed truck pulls in off the left driveway and parks in the upper-left staging area; out on the lot the excavators keep working the center building down.
    8:00 AM PT

    A blue flatbed truck pulls in off the left driveway and parks in the upper-left staging area; out on the lot the excavators keep working the center building down.

  57. Crews press on at the center building: the tall long-reach excavator on the right keeps biting at its standing end while the spread of broken concrete in the foreground widens.
    7:45 AM PT

    Crews press on at the center building: the tall long-reach excavator on the right keeps biting at its standing end while the spread of broken concrete in the foreground widens.

  58. The low-rise building across the center of the lot is already half gone — its right end is broken to rubble, with only a dark-roofed section still standing left of center as excavators tear in and dust drifts off the pile.
    7:30 AM PT

    The low-rise building across the center of the lot is already half gone — its right end is broken to rubble, with only a dark-roofed section still standing left of center as excavators tear in and dust drifts off the pile.