Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, June 14, 2026

Construction log

Sunday, June 14, 2026

75 snapshots from the live camera.


AI digest

The remaining wall section was smaller than in the June 7 reference, with more debris accumulated at its base. The excavator shifted between sections of the debris early in the day, then activity largely stopped and the site remained unchanged.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 29 similar no-change frames2:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The scene remains largely static, with equipment holding its positions.
      9:30 PM PT

      The scene remains largely static, with equipment holding its positions.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 6:15 PM PT. No construction activity — the site is quiet.
      6:15 PM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 5:45 PM PT. No construction activity — the site is quiet.
      5:45 PM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 5:30 PM PT. No construction activity — the site is quiet.
      5:30 PM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 5:15 PM PT. No construction activity — the site is quiet.
      5:15 PM PT

      No construction activity — the site is quiet.

    20. Construction camera frame at 5:00 PM PT. No construction activity — the site is quiet.
      5:00 PM PT

      No construction activity — the site is quiet.

    21. Construction camera frame at 4:45 PM PT. No construction activity — the site is quiet.
      4:45 PM PT

      No construction activity — the site is quiet.

    22. Construction camera frame at 4:30 PM PT. No construction activity — the site is quiet.
      4:30 PM PT

      No construction activity — the site is quiet.

    23. Construction camera frame at 4:15 PM PT. No construction activity — the site is quiet.
      4:15 PM PT

      No construction activity — the site is quiet.

    24. Construction camera frame at 4:00 PM PT. No construction activity — the site is quiet.
      4:00 PM PT

      No construction activity — the site is quiet.

    25. Construction camera frame at 3:45 PM PT. No construction activity — the site is quiet.
      3:45 PM PT

      No construction activity — the site is quiet.

    26. Construction camera frame at 3:30 PM PT. No new movement is visible across the demolition site or staging area.
      3:30 PM PT

      No new movement is visible across the demolition site or staging area.

    27. Construction camera frame at 3:15 PM PT. The scene appears remarkably static, with no discernible alterations to the equipment or rubble piles.
      3:15 PM PT

      The scene appears remarkably static, with no discernible alterations to the equipment or rubble piles.

    28. Construction camera frame at 3:00 PM PT. Everything remains in place, with no visible movement across the lot or staging area.
      3:00 PM PT

      Everything remains in place, with no visible movement across the lot or staging area.

    29. Construction camera frame at 2:45 PM PT. No construction activity — the site is quiet.
      2:45 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 2:30 PM PT. Nothing has shifted across the site, and all machinery remains stationary.
    2:30 PM PT

    Nothing has shifted across the site, and all machinery remains stationary.

  4. Construction camera frame at 2:15 PM PT. The site’s arrangement of equipment and debris appears virtually unchanged from the last check-in.
    2:15 PM PT

    The site’s arrangement of equipment and debris appears virtually unchanged from the last check-in.

  5. Construction camera frame at 2:00 PM PT. Activity on the site is minimal, with the positions of machinery and the debris pile appearing stable.
    2:00 PM PT

    Activity on the site is minimal, with the positions of machinery and the debris pile appearing stable.

  6. Construction camera frame at 1:45 PM PT. The overall layout of the demolition site remains consistent, with no clear adjustments to equipment or the debris field.
    1:45 PM PT

    The overall layout of the demolition site remains consistent, with no clear adjustments to equipment or the debris field.

  7. 25 similar no-change frames7:30 AM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The demolition site presents a nearly identical view, with equipment and debris remaining in the same positions.
      1:30 PM PT

      The demolition site presents a nearly identical view, with equipment and debris remaining in the same positions.

    2. Construction camera frame at 1:15 PM PT. The site continues at a similar pace, showing no significant alterations in the rubble or equipment positions.
      1:15 PM PT

      The site continues at a similar pace, showing no significant alterations in the rubble or equipment positions.

    3. Construction camera frame at 1:00 PM PT. The demolition site remains quite static, with no readily apparent shifts in activity or debris levels.
      1:00 PM PT

      The demolition site remains quite static, with no readily apparent shifts in activity or debris levels.

    4. Construction camera frame at 12:45 PM PT. The scene appears largely unchanged over the last fifteen minutes.
      12:45 PM PT

      The scene appears largely unchanged over the last fifteen minutes.

    5. Construction camera frame at 12:30 PM PT. No construction activity — the site is quiet.
      12:30 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:15 PM PT. No construction activity — the site is quiet.
      12:15 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 PM PT. No construction activity — the site is quiet.
      12:00 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 11:45 AM PT. No construction activity — the site is quiet.
      11:45 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 11:30 AM PT. No construction activity — the site is quiet.
      11:30 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 11:15 AM PT. No construction activity — the site is quiet.
      11:15 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 11:00 AM PT. No construction activity — the site is quiet.
      11:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 10:45 AM PT. No construction activity — the site is quiet.
      10:45 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 10:30 AM PT. No construction activity — the site is quiet.
      10:30 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 10:15 AM PT. No construction activity — the site is quiet.
      10:15 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 10:00 AM PT. No construction activity — the site is quiet.
      10:00 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 9:45 AM PT. No construction activity — the site is quiet.
      9:45 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 9:30 AM PT. No construction activity — the site is quiet.
      9:30 AM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 9:15 AM PT. No construction activity — the site is quiet.
      9:15 AM PT

      No construction activity — the site is quiet.

    19. Construction camera frame at 9:00 AM PT. No construction activity — the site is quiet.
      9:00 AM PT

      No construction activity — the site is quiet.

    20. Construction camera frame at 8:45 AM PT. No construction activity — the site is quiet.
      8:45 AM PT

      No construction activity — the site is quiet.

    21. Construction camera frame at 8:30 AM PT. No construction activity — the site is quiet.
      8:30 AM PT

      No construction activity — the site is quiet.

    22. Construction camera frame at 8:15 AM PT. No construction activity — the site is quiet.
      8:15 AM PT

      No construction activity — the site is quiet.

    23. Construction camera frame at 8:00 AM PT. No construction activity — the site is quiet.
      8:00 AM PT

      No construction activity — the site is quiet.

    24. Construction camera frame at 7:45 AM PT. No construction activity — the site is quiet.
      7:45 AM PT

      No construction activity — the site is quiet.

    25. Construction camera frame at 7:30 AM PT. No construction activity — the site is quiet.
      7:30 AM PT

      No construction activity — the site is quiet.

  8. Construction camera frame at 7:15 AM PT. The excavator has shifted position again, now working on a different section of the rubble pile closer to the remaining wall. Apart from that, the equipment and material arrangement appears stable.
    7:15 AM PT

    The excavator has shifted position again, now working on a different section of the rubble pile closer to the remaining wall. Apart from that, the equipment and material arrangement appears stable.

  9. 15 similar no-change frames12:00 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The excavator is now positioned slightly further to the right, actively working at the rubble pile. Otherwise, the scene remains consistent, with no apparent shifts in equipment or material staging.
      7:00 AM PT

      The excavator is now positioned slightly further to the right, actively working at the rubble pile. Otherwise, the scene remains consistent, with no apparent shifts in equipment or material staging.

    2. Construction camera frame at 6:45 AM PT. The remaining section of wall is visibly smaller, with more debris now piled at its base. Otherwise, the site appears largely unchanged, with equipment remaining in the same positions.
      6:45 AM PT

      The remaining section of wall is visibly smaller, with more debris now piled at its base. Otherwise, the site appears largely unchanged, with equipment remaining in the same positions.

    3. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 6:00 AM PT. No construction activity — the site is quiet.
      6:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 5:15 AM PT. No construction activity — the site is quiet.
      5:15 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 4:45 AM PT. No construction activity — the site is quiet.
      4:45 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 13All daysJun 15 →