75 snapshots from the live camera.
A substantial change is visible compared with June 6: most of the standing wall is now gone, leaving a broad debris field and a smaller remnant near the center. Activity was intermittent today, with a section of wall collapsing, the central pile growing, and excavators shifting position; a dump truck departed and trucks appeared on the service road, while the site otherwise remained largely steady.

No construction activity — the site is quiet.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

No construction activity — the site is quiet.

The scene appears largely unchanged from fifteen minutes ago, with equipment remaining in the same positions.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

The demolition site maintains its current configuration, with no observable adjustments to equipment or debris.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The site shows little variation from the previous view, with all equipment appearing stationary.

The demolition site continues at a similar pace, with no notable changes in equipment positions or debris accumulation.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The site maintains its previous condition, with no obvious shifts in the position of equipment or the size of the rubble.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The scene appears static, with no discernible alterations to the equipment or the growing debris pile.

No new activity or changes are visible across the site.

The demolition site holds a consistent appearance, with no apparent movement of machinery or significant changes to the debris field.

The demolition site presents a nearly identical view, with no discernible changes in equipment or debris arrangement.

The overall view of the demolition site remains stable, with no noticeable shifts in equipment placement or debris accumulation.

The site shows minimal alteration from the last view, with all equipment and the debris pile remaining in the same locations.

The site remains largely unchanged, with equipment and the rubble pile appearing in the same configuration as before.

A blue flatbed truck is now visible pulling onto the service road from the right side of the frame.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The scene appears static, with equipment and the debris pile maintaining their positions from the previous check-in.

The site’s condition is remarkably consistent, showing no apparent movement of machinery or growth in the rubble pile.

The demolition site presents a nearly identical view, with no discernible changes to equipment or the rubble pile over the last fifteen minutes.

The demolition site remains in a similar state, with no significant shifts in equipment positions or debris accumulation.

The scene is holding steady, with equipment and debris appearing in almost identical positions as fifteen minutes ago.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The scene appears stable, with no obvious alterations to the equipment or the size of the debris pile since the last view.

The site’s activity remains minimal, with the equipment and debris appearing in roughly the same configuration as before.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The demolition site holds a largely consistent appearance, with no immediately noticeable adjustments to equipment or the debris accumulation.

The site’s arrangement seems largely unchanged, with equipment and the rubble pile holding steady in their positions.

The excavator in the upper-left now appears to be actively digging into the debris pile, shifting material around. The overall layout of the site and equipment positions otherwise remain consistent.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

The scene appears remarkably static, with no obvious shifts in equipment positioning or the size of the central debris heap.

A small group of workers has become visible near the remaining structure, appearing to assess the debris. The site otherwise maintains a stable configuration, with equipment and the rubble pile showing no major alterations.

The site presents a similar view to the last check-in, with no readily apparent movement of machinery or significant changes to the debris field.

The rubble pile has visibly grown, with more debris now concentrated in the center of the site. Otherwise, the equipment and vehicles remain in their previous positions.

A second excavator has appeared in the lower-right corner of the frame, near the service road. The rest of the site holds its previous arrangement, with no other noticeable shifts in equipment or debris.

The excavator in the upper-left is now repositioned, having swung to a different part of the debris field. Otherwise, the site remains largely unchanged, with equipment and the rubble pile holding steady.

A dump truck is pulling out of the driveway on the left, heading onto the street. Apart from that movement, the demolition site maintains a consistent appearance, with no new significant debris accumulation.

Everything on site appears to be in the same location as before, with no discernible alterations to the rubble or equipment.

The scene appears stable, with no obvious changes to the rubble pile, equipment positions, or vehicle traffic.

No construction activity — the site is quiet.

The rubble pile has visibly increased in size, with more debris now scattered across the demolition zone.

The remaining structure shows further demolition, with a noticeable portion of the wall now missing compared to fifteen minutes ago.

The excavator in the upper-left staging area has shifted position, now facing more directly towards the rubble pile. Otherwise, the scene remains largely unchanged, with no new debris visibly added to the central mound.

A small section of the remaining wall has collapsed, adding to the central rubble pile. Otherwise, the equipment and materials appear to be holding their positions.
No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

Everything appears to be in the same position as before, with no discernible activity taking place on site.

The site holds steady, with no apparent changes in machinery or debris levels since the last check.

The demolition site appears stable, with no noticeable shifts in equipment positioning or rubble accumulation over the last fifteen minutes.

The scene remains largely unchanged, with no visible movement of equipment or significant alteration to the rubble pile.

The site is quiet and visibility is low.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.

No construction activity — the site is quiet.