Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, June 13, 2026

Construction log

Saturday, June 13, 2026

75 snapshots from the live camera.


AI digest

A substantial change is visible compared with June 6: most of the standing wall is now gone, leaving a broad debris field and a smaller remnant near the center. Activity was intermittent today, with a section of wall collapsing, the central pile growing, and excavators shifting position; a dump truck departed and trucks appeared on the service road, while the site otherwise remained largely steady.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 16 similar no-change frames6:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The scene appears largely unchanged from fifteen minutes ago, with equipment remaining in the same positions.
      9:30 PM PT

      The scene appears largely unchanged from fifteen minutes ago, with equipment remaining in the same positions.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 6:15 PM PT. No construction activity — the site is quiet.
      6:15 PM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 5:45 PM PT. The demolition site maintains its current configuration, with no observable adjustments to equipment or debris.
    5:45 PM PT

    The demolition site maintains its current configuration, with no observable adjustments to equipment or debris.

  4. 2 similar no-change frames5:15 PM–5:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 PM PT. The scene is holding steady, with no apparent shifts in the position of machinery or the size of the debris pile.
      5:30 PM PT

      The scene is holding steady, with no apparent shifts in the position of machinery or the size of the debris pile.

    2. Construction camera frame at 5:15 PM PT. The site appears stable, with no discernible changes in equipment placement or the extent of demolition debris.
      5:15 PM PT

      The site appears stable, with no discernible changes in equipment placement or the extent of demolition debris.

  5. Construction camera frame at 5:00 PM PT. The site shows little variation from the previous view, with all equipment appearing stationary.
    5:00 PM PT

    The site shows little variation from the previous view, with all equipment appearing stationary.

  6. Construction camera frame at 4:45 PM PT. The demolition site continues at a similar pace, with no notable changes in equipment positions or debris accumulation.
    4:45 PM PT

    The demolition site continues at a similar pace, with no notable changes in equipment positions or debris accumulation.

  7. 3 similar no-change frames4:00 PM–4:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:30 PM PT. The scene presents a largely unchanged view, with equipment and debris remaining in the same positions.
      4:30 PM PT

      The scene presents a largely unchanged view, with equipment and debris remaining in the same positions.

    2. Construction camera frame at 4:15 PM PT. Everything remains in place across the site with no visible movement.
      4:15 PM PT

      Everything remains in place across the site with no visible movement.

    3. Construction camera frame at 4:00 PM PT. The site remains much as it was, showing no significant alterations in the last quarter hour.
      4:00 PM PT

      The site remains much as it was, showing no significant alterations in the last quarter hour.

  8. Construction camera frame at 3:45 PM PT. The site maintains its previous condition, with no obvious shifts in the position of equipment or the size of the rubble.
    3:45 PM PT

    The site maintains its previous condition, with no obvious shifts in the position of equipment or the size of the rubble.

  9. 7 similar no-change frames2:00 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The scene appears static, with no discernible alterations to the equipment or the growing debris pile.
      3:30 PM PT

      The scene appears static, with no discernible alterations to the equipment or the growing debris pile.

    2. Construction camera frame at 3:15 PM PT. No new activity or changes are visible across the site.
      3:15 PM PT

      No new activity or changes are visible across the site.

    3. Construction camera frame at 3:00 PM PT. The demolition site holds a consistent appearance, with no apparent movement of machinery or significant changes to the debris field.
      3:00 PM PT

      The demolition site holds a consistent appearance, with no apparent movement of machinery or significant changes to the debris field.

    4. Construction camera frame at 2:45 PM PT. The demolition site presents a nearly identical view, with no discernible changes in equipment or debris arrangement.
      2:45 PM PT

      The demolition site presents a nearly identical view, with no discernible changes in equipment or debris arrangement.

    5. Construction camera frame at 2:30 PM PT. The overall view of the demolition site remains stable, with no noticeable shifts in equipment placement or debris accumulation.
      2:30 PM PT

      The overall view of the demolition site remains stable, with no noticeable shifts in equipment placement or debris accumulation.

    6. Construction camera frame at 2:15 PM PT. The site shows minimal alteration from the last view, with all equipment and the debris pile remaining in the same locations.
      2:15 PM PT

      The site shows minimal alteration from the last view, with all equipment and the debris pile remaining in the same locations.

    7. Construction camera frame at 2:00 PM PT. The site remains largely unchanged, with equipment and the rubble pile appearing in the same configuration as before.
      2:00 PM PT

      The site remains largely unchanged, with equipment and the rubble pile appearing in the same configuration as before.

  10. Construction camera frame at 1:45 PM PT. A blue flatbed truck is now visible pulling onto the service road from the right side of the frame.
    1:45 PM PT

    A blue flatbed truck is now visible pulling onto the service road from the right side of the frame.

  11. 4 similar no-change frames12:45 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The scene appears static, with equipment and the debris pile maintaining their positions from the previous check-in.
      1:30 PM PT

      The scene appears static, with equipment and the debris pile maintaining their positions from the previous check-in.

    2. Construction camera frame at 1:15 PM PT. The site’s condition is remarkably consistent, showing no apparent movement of machinery or growth in the rubble pile.
      1:15 PM PT

      The site’s condition is remarkably consistent, showing no apparent movement of machinery or growth in the rubble pile.

    3. Construction camera frame at 1:00 PM PT. The demolition site presents a nearly identical view, with no discernible changes to equipment or the rubble pile over the last fifteen minutes.
      1:00 PM PT

      The demolition site presents a nearly identical view, with no discernible changes to equipment or the rubble pile over the last fifteen minutes.

    4. Construction camera frame at 12:45 PM PT. The demolition site remains in a similar state, with no significant shifts in equipment positions or debris accumulation.
      12:45 PM PT

      The demolition site remains in a similar state, with no significant shifts in equipment positions or debris accumulation.

  12. Construction camera frame at 12:30 PM PT. The scene is holding steady, with equipment and debris appearing in almost identical positions as fifteen minutes ago.
    12:30 PM PT

    The scene is holding steady, with equipment and debris appearing in almost identical positions as fifteen minutes ago.

  13. 2 similar no-change frames12:00 PM–12:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:15 PM PT. The site’s layout remains largely unchanged, though a white truck has entered the service road on the right side of the frame.
      12:15 PM PT

      The site’s layout remains largely unchanged, though a white truck has entered the service road on the right side of the frame.

    2. Construction camera frame at 12:00 PM PT. The demolition site shows no marked differences, with all equipment and the debris field remaining in the same locations.
      12:00 PM PT

      The demolition site shows no marked differences, with all equipment and the debris field remaining in the same locations.

  14. Construction camera frame at 11:45 AM PT. The scene appears stable, with no obvious alterations to the equipment or the size of the debris pile since the last view.
    11:45 AM PT

    The scene appears stable, with no obvious alterations to the equipment or the size of the debris pile since the last view.

  15. Construction camera frame at 11:30 AM PT. The site’s activity remains minimal, with the equipment and debris appearing in roughly the same configuration as before.
    11:30 AM PT

    The site’s activity remains minimal, with the equipment and debris appearing in roughly the same configuration as before.

  16. 2 similar no-change frames11:00 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The site presents a very similar view to the last check, with no apparent movement of machinery or significant changes to the rubble.
      11:15 AM PT

      The site presents a very similar view to the last check, with no apparent movement of machinery or significant changes to the rubble.

    2. Construction camera frame at 11:00 AM PT. The demolition site maintains a consistent state, with no discernible shifts in equipment or debris levels over the last quarter hour.
      11:00 AM PT

      The demolition site maintains a consistent state, with no discernible shifts in equipment or debris levels over the last quarter hour.

  17. Construction camera frame at 10:45 AM PT. The demolition site holds a largely consistent appearance, with no immediately noticeable adjustments to equipment or the debris accumulation.
    10:45 AM PT

    The demolition site holds a largely consistent appearance, with no immediately noticeable adjustments to equipment or the debris accumulation.

  18. Construction camera frame at 10:30 AM PT. The site’s arrangement seems largely unchanged, with equipment and the rubble pile holding steady in their positions.
    10:30 AM PT

    The site’s arrangement seems largely unchanged, with equipment and the rubble pile holding steady in their positions.

  19. Construction camera frame at 10:15 AM PT. The excavator in the upper-left now appears to be actively digging into the debris pile, shifting material around. The overall layout of the site and equipment positions otherwise remain consistent.
    10:15 AM PT

    The excavator in the upper-left now appears to be actively digging into the debris pile, shifting material around. The overall layout of the site and equipment positions otherwise remain consistent.

  20. 2 similar no-change frames9:45 AM–10:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 AM PT. The scene appears remarkably static, with no obvious shifts in equipment positioning or the size of the central debris heap.
      10:00 AM PT

      The scene appears remarkably static, with no obvious shifts in equipment positioning or the size of the central debris heap.

    2. Construction camera frame at 9:45 AM PT. A small group of workers has become visible near the remaining structure, appearing to assess the debris. The site otherwise maintains a stable configuration, with equipment and the rubble pile showing no major alterations.
      9:45 AM PT

      A small group of workers has become visible near the remaining structure, appearing to assess the debris. The site otherwise maintains a stable configuration, with equipment and the rubble pile showing no major alterations.

  21. Construction camera frame at 9:30 AM PT. The site presents a similar view to the last check-in, with no readily apparent movement of machinery or significant changes to the debris field.
    9:30 AM PT

    The site presents a similar view to the last check-in, with no readily apparent movement of machinery or significant changes to the debris field.

  22. Construction camera frame at 9:15 AM PT. The rubble pile has visibly grown, with more debris now concentrated in the center of the site. Otherwise, the equipment and vehicles remain in their previous positions.
    9:15 AM PT

    The rubble pile has visibly grown, with more debris now concentrated in the center of the site. Otherwise, the equipment and vehicles remain in their previous positions.

  23. Construction camera frame at 9:00 AM PT. A second excavator has appeared in the lower-right corner of the frame, near the service road. The rest of the site holds its previous arrangement, with no other noticeable shifts in equipment or debris.
    9:00 AM PT

    A second excavator has appeared in the lower-right corner of the frame, near the service road. The rest of the site holds its previous arrangement, with no other noticeable shifts in equipment or debris.

  24. Construction camera frame at 8:45 AM PT. The excavator in the upper-left is now repositioned, having swung to a different part of the debris field. Otherwise, the site remains largely unchanged, with equipment and the rubble pile holding steady.
    8:45 AM PT

    The excavator in the upper-left is now repositioned, having swung to a different part of the debris field. Otherwise, the site remains largely unchanged, with equipment and the rubble pile holding steady.

  25. Construction camera frame at 8:30 AM PT. A dump truck is pulling out of the driveway on the left, heading onto the street. Apart from that movement, the demolition site maintains a consistent appearance, with no new significant debris accumulation.
    8:30 AM PT

    A dump truck is pulling out of the driveway on the left, heading onto the street. Apart from that movement, the demolition site maintains a consistent appearance, with no new significant debris accumulation.

  26. Construction camera frame at 8:15 AM PT. Everything on site appears to be in the same location as before, with no discernible alterations to the rubble or equipment.
    8:15 AM PT

    Everything on site appears to be in the same location as before, with no discernible alterations to the rubble or equipment.

  27. Construction camera frame at 8:00 AM PT. The scene appears stable, with no obvious changes to the rubble pile, equipment positions, or vehicle traffic.
    8:00 AM PT

    The scene appears stable, with no obvious changes to the rubble pile, equipment positions, or vehicle traffic.

  28. Construction camera frame at 7:45 AM PT. No construction activity — the site is quiet.
    7:45 AM PT

    No construction activity — the site is quiet.

  29. Construction camera frame at 7:30 AM PT. The rubble pile has visibly increased in size, with more debris now scattered across the demolition zone.
    7:30 AM PT

    The rubble pile has visibly increased in size, with more debris now scattered across the demolition zone.

  30. Construction camera frame at 7:15 AM PT. The remaining structure shows further demolition, with a noticeable portion of the wall now missing compared to fifteen minutes ago.
    7:15 AM PT

    The remaining structure shows further demolition, with a noticeable portion of the wall now missing compared to fifteen minutes ago.

  31. Construction camera frame at 7:00 AM PT. The excavator in the upper-left staging area has shifted position, now facing more directly towards the rubble pile. Otherwise, the scene remains largely unchanged, with no new debris visibly added to the central mound.
    7:00 AM PT

    The excavator in the upper-left staging area has shifted position, now facing more directly towards the rubble pile. Otherwise, the scene remains largely unchanged, with no new debris visibly added to the central mound.

  32. Construction camera frame at 6:45 AM PT. A small section of the remaining wall has collapsed, adding to the central rubble pile. Otherwise, the equipment and materials appear to be holding their positions.
    6:45 AM PT

    A small section of the remaining wall has collapsed, adding to the central rubble pile. Otherwise, the equipment and materials appear to be holding their positions.

  33. 13 similar no-change frames12:00 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. No construction activity — the site is quiet.
      6:30 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
      6:15 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 6:00 AM PT. Everything appears to be in the same position as before, with no discernible activity taking place on site.
      6:00 AM PT

      Everything appears to be in the same position as before, with no discernible activity taking place on site.

    4. Construction camera frame at 5:45 AM PT. The site holds steady, with no apparent changes in machinery or debris levels since the last check.
      5:45 AM PT

      The site holds steady, with no apparent changes in machinery or debris levels since the last check.

    5. Construction camera frame at 5:30 AM PT. The demolition site appears stable, with no noticeable shifts in equipment positioning or rubble accumulation over the last fifteen minutes.
      5:30 AM PT

      The demolition site appears stable, with no noticeable shifts in equipment positioning or rubble accumulation over the last fifteen minutes.

    6. Construction camera frame at 5:15 AM PT. The scene remains largely unchanged, with no visible movement of equipment or significant alteration to the rubble pile.
      5:15 AM PT

      The scene remains largely unchanged, with no visible movement of equipment or significant alteration to the rubble pile.

    7. Construction camera frame at 5:00 AM PT. The site is quiet and visibility is low.
      5:00 AM PT

      The site is quiet and visibility is low.

    8. Construction camera frame at 4:45 AM PT. No construction activity — the site is quiet.
      4:45 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.