Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, June 16, 2026

Construction log

Tuesday, June 16, 2026

75 snapshots from the live camera.


AI digest

The site was mostly quiet, but the excavator worked intermittently and the central debris mound grew modestly as material was shifted; a second excavator and a blue dump truck appeared, while a dump truck later left. By the final frame, the overall layout remained similar to the start of the day.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. Construction camera frame at 9:30 PM PT. The demolition site shows minimal alteration in the last fifteen minutes.
    9:30 PM PT

    The demolition site shows minimal alteration in the last fifteen minutes.

  4. 9 similar no-change frames7:15 PM–9:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 PM PT. The site remains quiet, with no noticeable shifts in equipment or debris positioning.
      9:15 PM PT

      The site remains quiet, with no noticeable shifts in equipment or debris positioning.

    2. Construction camera frame at 9:00 PM PT. The scene appears largely unchanged, with equipment remaining in the same positions.
      9:00 PM PT

      The scene appears largely unchanged, with equipment remaining in the same positions.

    3. Construction camera frame at 8:45 PM PT. Everything is currently static across the site.
      8:45 PM PT

      Everything is currently static across the site.

    4. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:30 PM PT. The site remains in a similar condition, with no significant shifts in equipment or debris accumulation.
      7:30 PM PT

      The site remains in a similar condition, with no significant shifts in equipment or debris accumulation.

    9. Construction camera frame at 7:15 PM PT. No new activity is visible, and the equipment remains in place.
      7:15 PM PT

      No new activity is visible, and the equipment remains in place.

  5. Construction camera frame at 7:00 PM PT. The demolition continues at a steady pace, with the rubble pile appearing slightly larger than before.
    7:00 PM PT

    The demolition continues at a steady pace, with the rubble pile appearing slightly larger than before.

  6. Construction camera frame at 6:45 PM PT. There’s a visible increase in the size of the rubble pile, as the excavator continues to break down the remaining structure.
    6:45 PM PT

    There’s a visible increase in the size of the rubble pile, as the excavator continues to break down the remaining structure.

  7. Construction camera frame at 6:30 PM PT. The site looks largely unchanged, with the equipment maintaining its previous arrangement.
    6:30 PM PT

    The site looks largely unchanged, with the equipment maintaining its previous arrangement.

  8. Construction camera frame at 6:15 PM PT. The scene is holding relatively stable, with equipment remaining in similar positions as before.
    6:15 PM PT

    The scene is holding relatively stable, with equipment remaining in similar positions as before.

  9. Construction camera frame at 6:00 PM PT. The demolition site appears quiet, with no noticeable alterations to equipment placement or the debris field.
    6:00 PM PT

    The demolition site appears quiet, with no noticeable alterations to equipment placement or the debris field.

  10. Construction camera frame at 5:45 PM PT. Activity is minimal, though the excavator is now focused on a different area within the central rubble pile.
    5:45 PM PT

    Activity is minimal, though the excavator is now focused on a different area within the central rubble pile.

  11. Construction camera frame at 5:30 PM PT. The central excavator is now digging into a different part of the rubble pile, shifting its focus slightly to the left.
    5:30 PM PT

    The central excavator is now digging into a different part of the rubble pile, shifting its focus slightly to the left.

  12. Construction camera frame at 5:15 PM PT. The excavator near the rubble pile has repositioned slightly, now working on a different section of the debris.
    5:15 PM PT

    The excavator near the rubble pile has repositioned slightly, now working on a different section of the debris.

  13. Construction camera frame at 5:00 PM PT. The site remains steady, with no apparent shifts in equipment or the size of the debris pile.
    5:00 PM PT

    The site remains steady, with no apparent shifts in equipment or the size of the debris pile.

  14. Construction camera frame at 4:45 PM PT. A dump truck is departing the site via the driveway on the left.
    4:45 PM PT

    A dump truck is departing the site via the driveway on the left.

  15. Construction camera frame at 4:30 PM PT. The scene appears largely unchanged, with equipment maintaining its previous positions and the rubble pile showing no significant growth.
    4:30 PM PT

    The scene appears largely unchanged, with equipment maintaining its previous positions and the rubble pile showing no significant growth.

  16. Construction camera frame at 4:15 PM PT. The rubble pile appears slightly larger, with the central excavator continuing to break down material.
    4:15 PM PT

    The rubble pile appears slightly larger, with the central excavator continuing to break down material.

  17. Construction camera frame at 4:00 PM PT. The loader in the upper-left has shifted position, now facing more directly towards the service road on the right.
    4:00 PM PT

    The loader in the upper-left has shifted position, now facing more directly towards the service road on the right.

  18. Construction camera frame at 3:45 PM PT. A second excavator has entered the central work area and is now processing debris near the bottom of the rubble pile.
    3:45 PM PT

    A second excavator has entered the central work area and is now processing debris near the bottom of the rubble pile.

  19. Construction camera frame at 3:30 PM PT. Activity on site remains minimal, with the equipment largely holding its positions.
    3:30 PM PT

    Activity on site remains minimal, with the equipment largely holding its positions.

  20. Construction camera frame at 3:15 PM PT. The loader in the upper-left staging area is now actively moving debris towards the central rubble pile.
    3:15 PM PT

    The loader in the upper-left staging area is now actively moving debris towards the central rubble pile.

  21. Construction camera frame at 3:00 PM PT. The central excavator has rotated slightly to the east, and is now focused on a different section of the rubble pile.
    3:00 PM PT

    The central excavator has rotated slightly to the east, and is now focused on a different section of the rubble pile.

  22. Construction camera frame at 2:45 PM PT. A dump truck is exiting the site via the driveway on the left side of the frame.
    2:45 PM PT

    A dump truck is exiting the site via the driveway on the left side of the frame.

  23. Construction camera frame at 2:30 PM PT. The central rubble pile appears slightly lower, with the excavator continuing to break down material within it.
    2:30 PM PT

    The central rubble pile appears slightly lower, with the excavator continuing to break down material within it.

  24. Construction camera frame at 2:15 PM PT. The excavator has shifted position again, now working on the western edge of the central rubble pile.
    2:15 PM PT

    The excavator has shifted position again, now working on the western edge of the central rubble pile.

  25. Construction camera frame at 2:00 PM PT. The site appears stable, with no obvious shifts in equipment or the height of the debris.
    2:00 PM PT

    The site appears stable, with no obvious shifts in equipment or the height of the debris.

  26. Construction camera frame at 1:45 PM PT. The central excavator is now positioned slightly further to the north, continuing to process the rubble pile.
    1:45 PM PT

    The central excavator is now positioned slightly further to the north, continuing to process the rubble pile.

  27. Construction camera frame at 1:30 PM PT. The excavator in the center is now digging deeper into the rubble, creating a more defined pit.
    1:30 PM PT

    The excavator in the center is now digging deeper into the rubble, creating a more defined pit.

  28. Construction camera frame at 1:15 PM PT. A long, flatbed trailer is now parked in the upper-left staging area, near the row of white dump trucks.
    1:15 PM PT

    A long, flatbed trailer is now parked in the upper-left staging area, near the row of white dump trucks.

  29. Construction camera frame at 1:00 PM PT. The scene remains largely unchanged, with the equipment and debris field holding steady.
    1:00 PM PT

    The scene remains largely unchanged, with the equipment and debris field holding steady.

  30. Construction camera frame at 12:45 PM PT. The rubble pile appears slightly larger, as the excavator continues to break down the remaining structure.
    12:45 PM PT

    The rubble pile appears slightly larger, as the excavator continues to break down the remaining structure.

  31. Construction camera frame at 12:30 PM PT. A second excavator has entered the frame and is now positioned on the eastern side of the rubble pile.
    12:30 PM PT

    A second excavator has entered the frame and is now positioned on the eastern side of the rubble pile.

  32. Construction camera frame at 12:15 PM PT. The excavator is now raising its arm higher, working on a different section of the remaining structure.
    12:15 PM PT

    The excavator is now raising its arm higher, working on a different section of the remaining structure.

  33. Construction camera frame at 12:00 PM PT. The demolition site is holding a consistent appearance, with no obvious shifts in equipment or debris levels.
    12:00 PM PT

    The demolition site is holding a consistent appearance, with no obvious shifts in equipment or debris levels.

  34. Construction camera frame at 11:45 AM PT. The site shows very little alteration, with the machinery remaining in similar positions.
    11:45 AM PT

    The site shows very little alteration, with the machinery remaining in similar positions.

  35. 2 similar no-change frames11:15 AM–11:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:30 AM PT. The site presents a static view, with machinery remaining in the same locations as before.
      11:30 AM PT

      The site presents a static view, with machinery remaining in the same locations as before.

    2. Construction camera frame at 11:15 AM PT. The equipment on site appears to be holding steady, with no significant changes in position.
      11:15 AM PT

      The equipment on site appears to be holding steady, with no significant changes in position.

  36. Construction camera frame at 11:00 AM PT. The rubble pile has visibly grown, with the excavator continuing its work on the central structure.
    11:00 AM PT

    The rubble pile has visibly grown, with the excavator continuing its work on the central structure.

  37. Construction camera frame at 10:45 AM PT. Activity appears minimal, with the equipment largely holding its positions from the previous view.
    10:45 AM PT

    Activity appears minimal, with the equipment largely holding its positions from the previous view.

  38. Construction camera frame at 10:30 AM PT. The scene remains largely unchanged, with equipment positioned as before.
    10:30 AM PT

    The scene remains largely unchanged, with equipment positioned as before.

  39. Construction camera frame at 10:15 AM PT. The excavator has shifted position and is now focused on a different part of the remaining structure.
    10:15 AM PT

    The excavator has shifted position and is now focused on a different part of the remaining structure.

  40. Construction camera frame at 10:00 AM PT. A dump truck is exiting the site via the driveway on the left.
    10:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  41. Construction camera frame at 9:45 AM PT. The excavator appears to be working at a lower level now, continuing to dismantle the structure from within.
    9:45 AM PT

    The excavator appears to be working at a lower level now, continuing to dismantle the structure from within.

  42. Construction camera frame at 9:30 AM PT. The excavator is actively working on a different section of the remaining structure, further reducing its height.
    9:30 AM PT

    The excavator is actively working on a different section of the remaining structure, further reducing its height.

  43. Construction camera frame at 9:15 AM PT. The rubble pile has grown slightly, with more debris added to the central mound.
    9:15 AM PT

    The rubble pile has grown slightly, with more debris added to the central mound.

  44. Construction camera frame at 9:00 AM PT. A red loader has moved from the upper-left staging area and is now positioned near the service road on the right.
    9:00 AM PT

    A red loader has moved from the upper-left staging area and is now positioned near the service road on the right.

  45. Construction camera frame at 8:45 AM PT. The excavator is now digging at a slightly different angle, continuing to break down the remaining structure.
    8:45 AM PT

    The excavator is now digging at a slightly different angle, continuing to break down the remaining structure.

  46. 2 similar no-change frames8:15 AM–8:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:30 AM PT. The site remains largely unchanged, with equipment holding its positions and no apparent demolition progress.
      8:30 AM PT

      The site remains largely unchanged, with equipment holding its positions and no apparent demolition progress.

    2. Construction camera frame at 8:15 AM PT. No significant movement or changes are visible across the site.
      8:15 AM PT

      No significant movement or changes are visible across the site.

  47. Construction camera frame at 8:00 AM PT. The excavator appears to be pausing, having completed work on that section of the structure for the moment.
    8:00 AM PT

    The excavator appears to be pausing, having completed work on that section of the structure for the moment.

  48. Construction camera frame at 7:45 AM PT. The excavator has shifted position slightly, now focused on a different section of the remaining structure.
    7:45 AM PT

    The excavator has shifted position slightly, now focused on a different section of the remaining structure.

  49. Construction camera frame at 7:30 AM PT. The central rubble pile appears slightly larger, indicating continued demolition work by the excavator.
    7:30 AM PT

    The central rubble pile appears slightly larger, indicating continued demolition work by the excavator.

  50. Construction camera frame at 7:15 AM PT. The excavator in the center of the frame is now actively working, pulling debris from the remaining structure and adding to the central rubble pile.
    7:15 AM PT

    The excavator in the center of the frame is now actively working, pulling debris from the remaining structure and adding to the central rubble pile.

  51. Construction camera frame at 7:00 AM PT. A blue dump truck has entered the site via the service road on the right, positioning itself near the upper-left staging area.
    7:00 AM PT

    A blue dump truck has entered the site via the service road on the right, positioning itself near the upper-left staging area.

  52. Construction camera frame at 6:45 AM PT. The scene is holding steady, with equipment and debris largely unmoved from the previous view.
    6:45 AM PT

    The scene is holding steady, with equipment and debris largely unmoved from the previous view.

  53. Construction camera frame at 6:30 AM PT. The site shows little discernible difference, maintaining the same arrangement of debris and parked machinery.
    6:30 AM PT

    The site shows little discernible difference, maintaining the same arrangement of debris and parked machinery.

  54. Construction camera frame at 6:15 AM PT. No construction activity — the site is quiet.
    6:15 AM PT

    No construction activity — the site is quiet.

  55. Construction camera frame at 6:00 AM PT. The demolition site continues at a steady pace, though the overall view appears nearly identical to the last check.
    6:00 AM PT

    The demolition site continues at a steady pace, though the overall view appears nearly identical to the last check.

  56. 10 similar no-change frames12:00 AM–5:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 AM PT. The site remains remarkably stable, with no visible alterations to the equipment layout or the size of the debris.
      5:45 AM PT

      The site remains remarkably stable, with no visible alterations to the equipment layout or the size of the debris.

    2. Construction camera frame at 5:30 AM PT. The demolition site presents a consistent view, with no new activity apparent in either the rubble or equipment positioning.
      5:30 AM PT

      The demolition site presents a consistent view, with no new activity apparent in either the rubble or equipment positioning.

    3. Construction camera frame at 5:15 AM PT. The site appears much the same as before, with no discernible shifts in the position of machinery or the size of the rubble.
      5:15 AM PT

      The site appears much the same as before, with no discernible shifts in the position of machinery or the size of the rubble.

    4. Construction camera frame at 5:00 AM PT. The scene remains static, with no apparent movement of equipment or noticeable changes to the debris pile.
      5:00 AM PT

      The scene remains static, with no apparent movement of equipment or noticeable changes to the debris pile.

    5. Construction camera frame at 4:45 AM PT. Visibility has improved, revealing a largely unchanged scene with the rubble pile remaining the focal point.
      4:45 AM PT

      Visibility has improved, revealing a largely unchanged scene with the rubble pile remaining the focal point.

    6. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.