Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, June 17, 2026

Construction log

Wednesday, June 17, 2026

75 snapshots from the live camera.


AI digest

The site changed little over the day: the central debris field and equipment appear much the same in the first and last frames, with no clear substantial shift in ground conditions. Observations note the excavator working around the pile and dump trucks leaving and entering via the left driveway; activity was mostly quiet.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 8 similar no-change frames8:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The demolition site appears quiet, with no noticeable alterations to the equipment positions or rubble pile.
      9:30 PM PT

      The demolition site appears quiet, with no noticeable alterations to the equipment positions or rubble pile.

    3. Construction camera frame at 9:15 PM PT. The scene remains largely unchanged, with the excavator continuing to work within the central rubble pile.
      9:15 PM PT

      The scene remains largely unchanged, with the excavator continuing to work within the central rubble pile.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 7:45 PM PT. The central excavator is now digging in a different section of the rubble pile compared to a few moments ago.
    7:45 PM PT

    The central excavator is now digging in a different section of the rubble pile compared to a few moments ago.

  4. Construction camera frame at 7:30 PM PT. Visibility is low as the site has transitioned into evening, and activity appears minimal.
    7:30 PM PT

    Visibility is low as the site has transitioned into evening, and activity appears minimal.

  5. Construction camera frame at 7:15 PM PT. The staging area in the upper-left corner now has a loader positioned near the material piles where there wasn’t one before.
    7:15 PM PT

    The staging area in the upper-left corner now has a loader positioned near the material piles where there wasn’t one before.

  6. Construction camera frame at 7:00 PM PT. The excavator in the center of the rubble pile is now positioned differently, having shifted slightly to the left.
    7:00 PM PT

    The excavator in the center of the rubble pile is now positioned differently, having shifted slightly to the left.

  7. Construction camera frame at 6:45 PM PT. A dark-colored truck has exited the site via the driveway on the left side of the frame.
    6:45 PM PT

    A dark-colored truck has exited the site via the driveway on the left side of the frame.

  8. Construction camera frame at 6:30 PM PT. The scene remains largely unchanged, though the excavator's arm is now extended in a different direction as it works on the central pile.
    6:30 PM PT

    The scene remains largely unchanged, though the excavator's arm is now extended in a different direction as it works on the central pile.

  9. Construction camera frame at 6:15 PM PT. The rubble pile appears slightly taller, with the central excavator continuing to work within it.
    6:15 PM PT

    The rubble pile appears slightly taller, with the central excavator continuing to work within it.

  10. Construction camera frame at 6:00 PM PT. The site holds steady, with no noticeable alterations in the position of machinery or the size of the debris field.
    6:00 PM PT

    The site holds steady, with no noticeable alterations in the position of machinery or the size of the debris field.

  11. Construction camera frame at 5:45 PM PT. The overall scene presents a familiar appearance, with no readily apparent changes to the site’s arrangement.
    5:45 PM PT

    The overall scene presents a familiar appearance, with no readily apparent changes to the site’s arrangement.

  12. Construction camera frame at 5:30 PM PT. The site’s layout is consistent between frames, showing no significant shifts in equipment or debris accumulation.
    5:30 PM PT

    The site’s layout is consistent between frames, showing no significant shifts in equipment or debris accumulation.

  13. Construction camera frame at 5:15 PM PT. Activity is minimal, though the excavator in the center is now oriented slightly differently as it continues working within the rubble.
    5:15 PM PT

    Activity is minimal, though the excavator in the center is now oriented slightly differently as it continues working within the rubble.

  14. Construction camera frame at 5:00 PM PT. The scene is stable, with no visible alterations to the arrangement of equipment or the height of the debris.
    5:00 PM PT

    The scene is stable, with no visible alterations to the arrangement of equipment or the height of the debris.

  15. Construction camera frame at 4:45 PM PT. The site remains in a quiet state, with no obvious movement of equipment or noticeable growth of the rubble pile.
    4:45 PM PT

    The site remains in a quiet state, with no obvious movement of equipment or noticeable growth of the rubble pile.

  16. Construction camera frame at 4:30 PM PT. The demolition site appears largely unchanged, with equipment and the debris pile maintaining their previous locations.
    4:30 PM PT

    The demolition site appears largely unchanged, with equipment and the debris pile maintaining their previous locations.

  17. Construction camera frame at 4:15 PM PT. The excavator furthest to the right has shifted position, now digging further into the rubble pile.
    4:15 PM PT

    The excavator furthest to the right has shifted position, now digging further into the rubble pile.

  18. Construction camera frame at 4:00 PM PT. The scene is remarkably similar, showing no discernible changes to the equipment positions or the size of the rubble pile.
    4:00 PM PT

    The scene is remarkably similar, showing no discernible changes to the equipment positions or the size of the rubble pile.

  19. Construction camera frame at 3:45 PM PT. The site holds steady, with all machinery and the debris pile appearing in the same locations as before.
    3:45 PM PT

    The site holds steady, with all machinery and the debris pile appearing in the same locations as before.

  20. 2 similar no-change frames3:15 PM–3:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:30 PM PT. The demolition site presents a largely static view, with no noticeable shifts in equipment or debris accumulation.
      3:30 PM PT

      The demolition site presents a largely static view, with no noticeable shifts in equipment or debris accumulation.

    2. Construction camera frame at 3:15 PM PT. The scene remains quite consistent, with equipment largely holding its positions and no significant alteration to the debris field.
      3:15 PM PT

      The scene remains quite consistent, with equipment largely holding its positions and no significant alteration to the debris field.

  21. Construction camera frame at 3:00 PM PT. The rubble pile has visibly grown, with more debris accumulating in the center of the demolition zone.
    3:00 PM PT

    The rubble pile has visibly grown, with more debris accumulating in the center of the demolition zone.

  22. Construction camera frame at 2:45 PM PT. The site appears stable, with the machinery maintaining its positions and no visible increase in the debris pile.
    2:45 PM PT

    The site appears stable, with the machinery maintaining its positions and no visible increase in the debris pile.

  23. Construction camera frame at 2:30 PM PT. Activity remains minimal, with the site appearing largely unchanged from the last check-in.
    2:30 PM PT

    Activity remains minimal, with the site appearing largely unchanged from the last check-in.

  24. Construction camera frame at 2:15 PM PT. The excavator closest to the service road is now actively digging, adding to the growing debris pile.
    2:15 PM PT

    The excavator closest to the service road is now actively digging, adding to the growing debris pile.

  25. Construction camera frame at 2:00 PM PT. The loader in the upper-left staging area is now actively maneuvering, backing toward the central rubble pile.
    2:00 PM PT

    The loader in the upper-left staging area is now actively maneuvering, backing toward the central rubble pile.

  26. Construction camera frame at 1:45 PM PT. The excavator previously working on the far right side of the rubble pile has now shifted its position slightly to the left.
    1:45 PM PT

    The excavator previously working on the far right side of the rubble pile has now shifted its position slightly to the left.

  27. Construction camera frame at 1:30 PM PT. The scene is holding steady, with no apparent shifts in equipment positions or debris removal.
    1:30 PM PT

    The scene is holding steady, with no apparent shifts in equipment positions or debris removal.

  28. Construction camera frame at 1:15 PM PT. A lone dump truck is now entering the site via the driveway on the left.
    1:15 PM PT

    A lone dump truck is now entering the site via the driveway on the left.

  29. Construction camera frame at 1:00 PM PT. The rubble pile appears slightly larger, as the excavator on the right continues to feed debris into it.
    1:00 PM PT

    The rubble pile appears slightly larger, as the excavator on the right continues to feed debris into it.

  30. Construction camera frame at 12:45 PM PT. Activity appears minimal, though the excavator near the service road is now angled slightly differently.
    12:45 PM PT

    Activity appears minimal, though the excavator near the service road is now angled slightly differently.

  31. Construction camera frame at 12:30 PM PT. The excavator closest to the street has moved slightly further onto the rubble pile.
    12:30 PM PT

    The excavator closest to the street has moved slightly further onto the rubble pile.

  32. Construction camera frame at 12:15 PM PT. The scene remains largely unchanged, with equipment positioned similarly to before.
    12:15 PM PT

    The scene remains largely unchanged, with equipment positioned similarly to before.

  33. Construction camera frame at 12:00 PM PT. The excavator near the service road on the right has repositioned itself, now facing towards the center of the rubble pile.
    12:00 PM PT

    The excavator near the service road on the right has repositioned itself, now facing towards the center of the rubble pile.

  34. Construction camera frame at 11:45 AM PT. The excavator has shifted its focus again, now actively working on the southern edge of the rubble pile.
    11:45 AM PT

    The excavator has shifted its focus again, now actively working on the southern edge of the rubble pile.

  35. Construction camera frame at 11:30 AM PT. The excavator is now working on the western side of the rubble pile, appearing to be breaking down larger pieces.
    11:30 AM PT

    The excavator is now working on the western side of the rubble pile, appearing to be breaking down larger pieces.

  36. Construction camera frame at 11:15 AM PT. The excavator is now focused on a different section of the rubble pile, working towards the center.
    11:15 AM PT

    The excavator is now focused on a different section of the rubble pile, working towards the center.

  37. Construction camera frame at 11:00 AM PT. The rubble pile has grown slightly, and the excavator is now working on the eastern face of the debris.
    11:00 AM PT

    The rubble pile has grown slightly, and the excavator is now working on the eastern face of the debris.

  38. Construction camera frame at 10:45 AM PT. A dump truck is exiting the site via the driveway on the left side of the frame.
    10:45 AM PT

    A dump truck is exiting the site via the driveway on the left side of the frame.

  39. Construction camera frame at 10:30 AM PT. The excavator is now digging slightly lower into the rubble pile, with a noticeable change in the shape of the debris field.
    10:30 AM PT

    The excavator is now digging slightly lower into the rubble pile, with a noticeable change in the shape of the debris field.

  40. Construction camera frame at 10:15 AM PT. The excavator appears to have made a small advance, now working slightly higher up on the rubble pile.
    10:15 AM PT

    The excavator appears to have made a small advance, now working slightly higher up on the rubble pile.

  41. Construction camera frame at 10:00 AM PT. The excavator is now positioned slightly further to the left, continuing to work at the rubble pile.
    10:00 AM PT

    The excavator is now positioned slightly further to the left, continuing to work at the rubble pile.

  42. Construction camera frame at 9:45 AM PT. The excavator has shifted position again, now working further into the rubble pile on the right side.
    9:45 AM PT

    The excavator has shifted position again, now working further into the rubble pile on the right side.

  43. Construction camera frame at 9:30 AM PT. The light has shifted, and shadows are lengthening across the demolition site, but the equipment positions appear stable.
    9:30 AM PT

    The light has shifted, and shadows are lengthening across the demolition site, but the equipment positions appear stable.

  44. Construction camera frame at 9:15 AM PT. A loader is now moving materials within the upper-left staging area, near the larger dumpsters.
    9:15 AM PT

    A loader is now moving materials within the upper-left staging area, near the larger dumpsters.

  45. Construction camera frame at 9:00 AM PT. A dump truck is exiting the site via the driveway on the left.
    9:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  46. 2 similar no-change frames8:30 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The scene appears largely unchanged, with equipment holding its positions and the rubble pile showing no significant growth.
      8:45 AM PT

      The scene appears largely unchanged, with equipment holding its positions and the rubble pile showing no significant growth.

    2. Construction camera frame at 8:30 AM PT. The site remains relatively static, with no immediately apparent shifts in equipment or debris placement.
      8:30 AM PT

      The site remains relatively static, with no immediately apparent shifts in equipment or debris placement.

  47. Construction camera frame at 8:15 AM PT. The excavator is now positioned further back from the rubble pile’s center, appearing to work on the debris closer to the remaining foundation.
    8:15 AM PT

    The excavator is now positioned further back from the rubble pile’s center, appearing to work on the debris closer to the remaining foundation.

  48. Construction camera frame at 8:00 AM PT. The excavator is now working on a different section of the rubble pile, having shifted its focus from the previous location.
    8:00 AM PT

    The excavator is now working on a different section of the rubble pile, having shifted its focus from the previous location.

  49. Construction camera frame at 7:45 AM PT. The excavator has descended from the rubble pile and is now working at the base, further dismantling the remaining structure.
    7:45 AM PT

    The excavator has descended from the rubble pile and is now working at the base, further dismantling the remaining structure.

  50. Construction camera frame at 7:30 AM PT. The excavator is now positioned on top of the rubble pile, actively working to break down remaining sections of the structure.
    7:30 AM PT

    The excavator is now positioned on top of the rubble pile, actively working to break down remaining sections of the structure.

  51. Construction camera frame at 7:15 AM PT. A dump truck is exiting the site via the driveway on the left, having previously been parked in the upper-left staging area.
    7:15 AM PT

    A dump truck is exiting the site via the driveway on the left, having previously been parked in the upper-left staging area.

  52. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The scene appears largely unchanged, with the equipment and debris maintaining their previous arrangement.
      7:00 AM PT

      The scene appears largely unchanged, with the equipment and debris maintaining their previous arrangement.

    2. Construction camera frame at 6:45 AM PT. The scene is holding steady, with no noticeable shifts in equipment placement or debris accumulation.
      6:45 AM PT

      The scene is holding steady, with no noticeable shifts in equipment placement or debris accumulation.

  53. Construction camera frame at 6:30 AM PT. The rubble pile has visibly grown, with the excavator continuing to feed debris into the center.
    6:30 AM PT

    The rubble pile has visibly grown, with the excavator continuing to feed debris into the center.

  54. Construction camera frame at 6:15 AM PT. The scene shows a continuation of the same conditions, with no visible adjustments to the equipment or the debris field.
    6:15 AM PT

    The scene shows a continuation of the same conditions, with no visible adjustments to the equipment or the debris field.

  55. Construction camera frame at 6:00 AM PT. There is no discernible difference in the scene, with the equipment and rubble remaining in the same configuration.
    6:00 AM PT

    There is no discernible difference in the scene, with the equipment and rubble remaining in the same configuration.

  56. Construction camera frame at 5:45 AM PT. The site presents a consistent view, with equipment and the debris pile holding their positions.
    5:45 AM PT

    The site presents a consistent view, with equipment and the debris pile holding their positions.

  57. 3 similar no-change frames5:00 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The demolition site remains quiet, with no apparent movement of machinery or changes to the rubble pile.
      5:30 AM PT

      The demolition site remains quiet, with no apparent movement of machinery or changes to the rubble pile.

    2. Construction camera frame at 5:15 AM PT. The site appears unchanged, with all equipment remaining in the same positions as before.
      5:15 AM PT

      The site appears unchanged, with all equipment remaining in the same positions as before.

    3. Construction camera frame at 5:00 AM PT. The scene remains largely static, with no noticeable shifts in equipment positions or demolition progress.
      5:00 AM PT

      The scene remains largely static, with no noticeable shifts in equipment positions or demolition progress.

  58. Construction camera frame at 4:45 AM PT. Visibility has improved, and the rubble pile appears slightly larger as demolition continues in the center of the site.
    4:45 AM PT

    Visibility has improved, and the rubble pile appears slightly larger as demolition continues in the center of the site.

  59. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 16All daysJun 18 →