Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Friday, June 19, 2026

Construction log

Friday, June 19, 2026

75 snapshots from the live camera.


AI digest

The site was largely quiet, with only minor repositioning of equipment and trucks entering or leaving; the central debris pile appears slightly larger in some observations. The first and last frames show no substantial change in the site’s overall layout.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 13 similar no-change frames6:45 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. No construction activity — the site is quiet.
      9:30 PM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 9:15 PM PT. No construction activity — the site is quiet.
      9:15 PM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. The scene remains stable, with no significant shifts in equipment or debris arrangement apparent.
      6:45 PM PT

      The scene remains stable, with no significant shifts in equipment or debris arrangement apparent.

  3. Construction camera frame at 6:30 PM PT. The demolition site shows very little alteration, with the equipment and debris field appearing almost identical to the previous view.
    6:30 PM PT

    The demolition site shows very little alteration, with the equipment and debris field appearing almost identical to the previous view.

  4. Construction camera frame at 6:15 PM PT. Activity on site is minimal, with the overall layout of equipment and debris remaining consistent.
    6:15 PM PT

    Activity on site is minimal, with the overall layout of equipment and debris remaining consistent.

  5. Construction camera frame at 6:00 PM PT. The site presents a consistent view, with equipment remaining in largely the same positions.
    6:00 PM PT

    The site presents a consistent view, with equipment remaining in largely the same positions.

  6. Construction camera frame at 5:45 PM PT. The excavator has repositioned itself again, now working on a different section of the rubble pile further to the right.
    5:45 PM PT

    The excavator has repositioned itself again, now working on a different section of the rubble pile further to the right.

  7. Construction camera frame at 5:30 PM PT. The site appears largely unchanged, though the excavator seems to have shifted its position slightly within the rubble.
    5:30 PM PT

    The site appears largely unchanged, though the excavator seems to have shifted its position slightly within the rubble.

  8. Construction camera frame at 5:15 PM PT. A dump truck is pulling out of the driveway on the left side of the frame, heading onto the street.
    5:15 PM PT

    A dump truck is pulling out of the driveway on the left side of the frame, heading onto the street.

  9. Construction camera frame at 5:00 PM PT. The scene remains remarkably static, with no discernible changes in equipment positioning or debris levels.
    5:00 PM PT

    The scene remains remarkably static, with no discernible changes in equipment positioning or debris levels.

  10. Construction camera frame at 4:45 PM PT. The excavator in the center of the site is now digging deeper into the rubble pile.
    4:45 PM PT

    The excavator in the center of the site is now digging deeper into the rubble pile.

  11. Construction camera frame at 4:30 PM PT. A few workers are now visible near the center of the demolition zone, appearing to be surveying the rubble.
    4:30 PM PT

    A few workers are now visible near the center of the demolition zone, appearing to be surveying the rubble.

  12. Construction camera frame at 4:15 PM PT. The rubble pile appears slightly larger, with more debris concentrated in the center of the demolition zone.
    4:15 PM PT

    The rubble pile appears slightly larger, with more debris concentrated in the center of the demolition zone.

  13. Construction camera frame at 4:00 PM PT. Nothing has shifted across the site or within the staging area since the last update.
    4:00 PM PT

    Nothing has shifted across the site or within the staging area since the last update.

  14. Construction camera frame at 3:45 PM PT. The staging area on the upper-left shows a new white pickup truck parked near the material piles.
    3:45 PM PT

    The staging area on the upper-left shows a new white pickup truck parked near the material piles.

  15. Construction camera frame at 3:30 PM PT. The site shows no significant alterations in the last fifteen minutes, maintaining a consistent appearance.
    3:30 PM PT

    The site shows no significant alterations in the last fifteen minutes, maintaining a consistent appearance.

  16. Construction camera frame at 3:15 PM PT. The scene remains remarkably consistent, with no observed shifts in equipment or debris placement.
    3:15 PM PT

    The scene remains remarkably consistent, with no observed shifts in equipment or debris placement.

  17. 4 similar no-change frames2:15 PM–3:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:00 PM PT. The site continues to look much the same, with no noticeable alterations in equipment placement or debris accumulation.
      3:00 PM PT

      The site continues to look much the same, with no noticeable alterations in equipment placement or debris accumulation.

    2. Construction camera frame at 2:45 PM PT. The demolition site appears unchanged, with equipment and debris remaining static over the last fifteen minutes.
      2:45 PM PT

      The demolition site appears unchanged, with equipment and debris remaining static over the last fifteen minutes.

    3. Construction camera frame at 2:30 PM PT. The site holds steady, with no discernible movement of machinery or growth of the debris pile in the last quarter hour.
      2:30 PM PT

      The site holds steady, with no discernible movement of machinery or growth of the debris pile in the last quarter hour.

    4. Construction camera frame at 2:15 PM PT. The demolition site presents a static view, with all equipment and debris remaining in the same positions as before.
      2:15 PM PT

      The demolition site presents a static view, with all equipment and debris remaining in the same positions as before.

  18. Construction camera frame at 2:00 PM PT. Everything remains in place across the lot and staging area.
    2:00 PM PT

    Everything remains in place across the lot and staging area.

  19. Construction camera frame at 1:45 PM PT. The demolition site shows virtually no difference from the last check-in.
    1:45 PM PT

    The demolition site shows virtually no difference from the last check-in.

  20. Construction camera frame at 1:30 PM PT. The scene remains consistent, with no apparent changes in the location of equipment or the size of the debris pile.
    1:30 PM PT

    The scene remains consistent, with no apparent changes in the location of equipment or the size of the debris pile.

  21. Construction camera frame at 1:15 PM PT. The central rubble pile has grown slightly, with more debris now visible within its boundaries.
    1:15 PM PT

    The central rubble pile has grown slightly, with more debris now visible within its boundaries.

  22. 4 similar no-change frames12:15 PM–1:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:00 PM PT. The demolition site appears quiet, with no noticeable alterations to the rubble or equipment positions.
      1:00 PM PT

      The demolition site appears quiet, with no noticeable alterations to the rubble or equipment positions.

    2. Construction camera frame at 12:45 PM PT. The site remains stable, with no discernible shifts in equipment placement or debris levels.
      12:45 PM PT

      The site remains stable, with no discernible shifts in equipment placement or debris levels.

    3. Construction camera frame at 12:30 PM PT. The site presents a largely unchanged view, with the same positions for machinery and the rubble pile.
      12:30 PM PT

      The site presents a largely unchanged view, with the same positions for machinery and the rubble pile.

    4. Construction camera frame at 12:15 PM PT. No visible activity or movement has occurred across the site since the last update.
      12:15 PM PT

      No visible activity or movement has occurred across the site since the last update.

  23. Construction camera frame at 12:00 PM PT. A dump truck has exited the site via the driveway on the left.
    12:00 PM PT

    A dump truck has exited the site via the driveway on the left.

  24. Construction camera frame at 11:45 AM PT. The staging area shows a slight rearrangement, with a loader now positioned closer to the central rubble pile.
    11:45 AM PT

    The staging area shows a slight rearrangement, with a loader now positioned closer to the central rubble pile.

  25. Construction camera frame at 11:30 AM PT. The scene is remarkably consistent, showing little to no progression in demolition or equipment movement.
    11:30 AM PT

    The scene is remarkably consistent, showing little to no progression in demolition or equipment movement.

  26. 4 similar no-change frames10:30 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The demolition zone appears static, with equipment and debris remaining in nearly identical positions.
      11:15 AM PT

      The demolition zone appears static, with equipment and debris remaining in nearly identical positions.

    2. Construction camera frame at 11:00 AM PT. The site remains in a quiet state, showing no significant shifts in the position of equipment or the extent of the debris.
      11:00 AM PT

      The site remains in a quiet state, showing no significant shifts in the position of equipment or the extent of the debris.

    3. Construction camera frame at 10:45 AM PT. The demolition site remains largely unchanged, with equipment and debris appearing in the same arrangement as before.
      10:45 AM PT

      The demolition site remains largely unchanged, with equipment and debris appearing in the same arrangement as before.

    4. Construction camera frame at 10:30 AM PT. The site holds steady, with no apparent movement of machinery or substantial changes to the debris.
      10:30 AM PT

      The site holds steady, with no apparent movement of machinery or substantial changes to the debris.

  27. Construction camera frame at 10:15 AM PT. A smaller excavator has moved into position near the lower-left corner of the demolition zone.
    10:15 AM PT

    A smaller excavator has moved into position near the lower-left corner of the demolition zone.

  28. Construction camera frame at 10:00 AM PT. The site presents a consistent picture, with no noticeable alterations to equipment or the debris field.
    10:00 AM PT

    The site presents a consistent picture, with no noticeable alterations to equipment or the debris field.

  29. Construction camera frame at 9:45 AM PT. The scene appears remarkably stable, with the equipment and debris maintaining their positions from the previous check-in.
    9:45 AM PT

    The scene appears remarkably stable, with the equipment and debris maintaining their positions from the previous check-in.

  30. Construction camera frame at 9:30 AM PT. A lone dump truck has exited the site via the driveway on the left.
    9:30 AM PT

    A lone dump truck has exited the site via the driveway on the left.

  31. 2 similar no-change frames9:00 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. The overall layout of the site remains steady, with no significant shifts in equipment positioning or debris levels.
      9:15 AM PT

      The overall layout of the site remains steady, with no significant shifts in equipment positioning or debris levels.

    2. Construction camera frame at 9:00 AM PT. The excavator continues to work at the rubble pile, though the overall scene remains largely unchanged.
      9:00 AM PT

      The excavator continues to work at the rubble pile, though the overall scene remains largely unchanged.

  32. Construction camera frame at 8:45 AM PT. The staging area shows a slight rearrangement, with a dump truck now positioned near the upper-left corner where there wasn’t one before.
    8:45 AM PT

    The staging area shows a slight rearrangement, with a dump truck now positioned near the upper-left corner where there wasn’t one before.

  33. Construction camera frame at 8:30 AM PT. The excavator in the center is now digging, adding to the growing debris pile.
    8:30 AM PT

    The excavator in the center is now digging, adding to the growing debris pile.

  34. Construction camera frame at 8:15 AM PT. Activity on site seems minimal, as the equipment and debris field maintain a similar arrangement to before.
    8:15 AM PT

    Activity on site seems minimal, as the equipment and debris field maintain a similar arrangement to before.

  35. Construction camera frame at 8:00 AM PT. The scene presents a generally consistent picture, with no major adjustments to equipment or debris accumulation apparent.
    8:00 AM PT

    The scene presents a generally consistent picture, with no major adjustments to equipment or debris accumulation apparent.

  36. Construction camera frame at 7:45 AM PT. The rubble pile appears slightly larger, with more debris concentrated in the central area.
    7:45 AM PT

    The rubble pile appears slightly larger, with more debris concentrated in the central area.

  37. Construction camera frame at 7:30 AM PT. The layout of machinery and materials appears stable, with little movement detected across the site.
    7:30 AM PT

    The layout of machinery and materials appears stable, with little movement detected across the site.

  38. Construction camera frame at 7:15 AM PT. A white pickup truck has entered the site through the driveway on the left.
    7:15 AM PT

    A white pickup truck has entered the site through the driveway on the left.

  39. 2 similar no-change frames6:45 AM–7:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:00 AM PT. The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing similar to before.
      7:00 AM PT

      The scene remains largely unchanged, with equipment holding its positions and the debris pile appearing similar to before.

    2. Construction camera frame at 6:45 AM PT. The demolition appears quiet, with no discernible shifts in the positioning of equipment or the size of the rubble.
      6:45 AM PT

      The demolition appears quiet, with no discernible shifts in the positioning of equipment or the size of the rubble.

  40. Construction camera frame at 6:30 AM PT. The staging area shows a repositioned orange excavator near the upper-left corner of the site.
    6:30 AM PT

    The staging area shows a repositioned orange excavator near the upper-left corner of the site.

  41. Construction camera frame at 6:15 AM PT. A dump truck has exited the site via the driveway on the left.
    6:15 AM PT

    A dump truck has exited the site via the driveway on the left.

  42. 5 similar no-change frames5:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. The site presents a static view, with no obvious adjustments to the layout of equipment or the height of the rubble.
      6:00 AM PT

      The site presents a static view, with no obvious adjustments to the layout of equipment or the height of the rubble.

    2. Construction camera frame at 5:45 AM PT. The site holds steady, showing no significant alterations in equipment positioning or debris accumulation.
      5:45 AM PT

      The site holds steady, showing no significant alterations in equipment positioning or debris accumulation.

    3. Construction camera frame at 5:30 AM PT. The demolition site remains steady, with no apparent movement of machinery or significant changes to the debris field.
      5:30 AM PT

      The demolition site remains steady, with no apparent movement of machinery or significant changes to the debris field.

    4. Construction camera frame at 5:15 AM PT. The scene is largely unchanged, though a small loader has moved slightly within the rubble pile itself.
      5:15 AM PT

      The scene is largely unchanged, though a small loader has moved slightly within the rubble pile itself.

    5. Construction camera frame at 5:00 AM PT. The site appears quiet, with no noticeable shifts in equipment or debris since the last check.
      5:00 AM PT

      The site appears quiet, with no noticeable shifts in equipment or debris since the last check.

  43. Construction camera frame at 4:45 AM PT. Visibility remains low with minimal discernible activity on site.
    4:45 AM PT

    Visibility remains low with minimal discernible activity on site.

  44. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 18All daysJun 20 →