Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, June 20, 2026

Construction log

Saturday, June 20, 2026

74 snapshots from the live camera.


AI digest

The site was quiet throughout the day, with no visible movement of equipment or change to the ground. Compared with June 13, the lot appears cleared of the debris and machinery visible in that earlier frame, but no further change is apparent today.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 20 similar no-change frames5:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The demolition site appears unchanged, with all equipment remaining in the same positions as before.
      9:30 PM PT

      The demolition site appears unchanged, with all equipment remaining in the same positions as before.

    3. Construction camera frame at 9:15 PM PT. The scene remains largely static, with no noticeable movement of equipment or significant changes to the rubble pile.
      9:15 PM PT

      The scene remains largely static, with no noticeable movement of equipment or significant changes to the rubble pile.

    4. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:45 PM PT. No construction activity — the site is quiet.
      8:45 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 8:30 PM PT. No construction activity — the site is quiet.
      8:30 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 6:45 PM PT. No construction activity — the site is quiet.
      6:45 PM PT

      No construction activity — the site is quiet.

    14. Construction camera frame at 6:30 PM PT. No construction activity — the site is quiet.
      6:30 PM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 6:15 PM PT. No construction activity — the site is quiet.
      6:15 PM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 6:00 PM PT. No construction activity — the site is quiet.
      6:00 PM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 5:45 PM PT. Everything remains static across the lot, from the staging area to the central debris.
      5:45 PM PT

      Everything remains static across the lot, from the staging area to the central debris.

    18. Construction camera frame at 5:30 PM PT. The site’s appearance remains largely unchanged over the past fifteen minutes.
      5:30 PM PT

      The site’s appearance remains largely unchanged over the past fifteen minutes.

    19. Construction camera frame at 5:15 PM PT. The site continues to show a stable configuration, with no noticeable changes to the position of machinery or the size of the debris pile.
      5:15 PM PT

      The site continues to show a stable configuration, with no noticeable changes to the position of machinery or the size of the debris pile.

    20. Construction camera frame at 5:00 PM PT. No new activity or shifts in equipment are visible across the site.
      5:00 PM PT

      No new activity or shifts in equipment are visible across the site.

  3. Construction camera frame at 4:45 PM PT. The demolition site appears nearly identical to its state fifteen minutes ago.
    4:45 PM PT

    The demolition site appears nearly identical to its state fifteen minutes ago.

  4. Construction camera frame at 4:30 PM PT. The site’s activity level is minimal, with no apparent adjustments to equipment positioning or debris levels in the last fifteen minutes.
    4:30 PM PT

    The site’s activity level is minimal, with no apparent adjustments to equipment positioning or debris levels in the last fifteen minutes.

  5. Construction camera frame at 4:15 PM PT. The site presents a familiar picture, with no immediately obvious shifts in the location of equipment or the extent of the demolition debris.
    4:15 PM PT

    The site presents a familiar picture, with no immediately obvious shifts in the location of equipment or the extent of the demolition debris.

  6. Construction camera frame at 4:00 PM PT. The scene holds a consistent appearance, with no easily observed alterations in the arrangement of equipment or the rubble pile.
    4:00 PM PT

    The scene holds a consistent appearance, with no easily observed alterations in the arrangement of equipment or the rubble pile.

  7. 4 similar no-change frames3:00 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The scene remains remarkably static, showing no discernible movement of machinery or changes to the debris field.
      3:45 PM PT

      The scene remains remarkably static, showing no discernible movement of machinery or changes to the debris field.

    2. Construction camera frame at 3:30 PM PT. The site's layout is consistent, with no noticeable shifts in equipment or debris accumulation over the last fifteen minutes.
      3:30 PM PT

      The site's layout is consistent, with no noticeable shifts in equipment or debris accumulation over the last fifteen minutes.

    3. Construction camera frame at 3:15 PM PT. The site's appearance has remained largely unchanged during the last quarter of an hour.
      3:15 PM PT

      The site's appearance has remained largely unchanged during the last quarter of an hour.

    4. Construction camera frame at 3:00 PM PT. The scene appears stable, with no significant changes to the equipment or debris arrangement visible in this update.
      3:00 PM PT

      The scene appears stable, with no significant changes to the equipment or debris arrangement visible in this update.

  8. Construction camera frame at 2:45 PM PT. The demolition site continues to look much the same, with no readily apparent alterations to the positioning of equipment or the size of the debris pile.
    2:45 PM PT

    The demolition site continues to look much the same, with no readily apparent alterations to the positioning of equipment or the size of the debris pile.

  9. Construction camera frame at 2:30 PM PT. The site presents a nearly identical view, with no apparent alterations to equipment or debris placement.
    2:30 PM PT

    The site presents a nearly identical view, with no apparent alterations to equipment or debris placement.

  10. Construction camera frame at 2:15 PM PT. The site shows no detectable difference from its appearance a few minutes ago.
    2:15 PM PT

    The site shows no detectable difference from its appearance a few minutes ago.

  11. 11 similar no-change frames11:30 AM–2:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:00 PM PT. The scene remains remarkably consistent, showing no discernible movement of equipment or growth of the debris pile.
      2:00 PM PT

      The scene remains remarkably consistent, showing no discernible movement of equipment or growth of the debris pile.

    2. Construction camera frame at 1:45 PM PT. The demolition site appears static, with no noticeable shifts in equipment positioning or debris accumulation over the last fifteen minutes.
      1:45 PM PT

      The demolition site appears static, with no noticeable shifts in equipment positioning or debris accumulation over the last fifteen minutes.

    3. Construction camera frame at 1:30 PM PT. The site remains largely unchanged, with equipment and debris appearing in the same positions as before.
      1:30 PM PT

      The site remains largely unchanged, with equipment and debris appearing in the same positions as before.

    4. Construction camera frame at 1:15 PM PT. All equipment and materials remain in place, with no visible changes across the site.
      1:15 PM PT

      All equipment and materials remain in place, with no visible changes across the site.

    5. Construction camera frame at 1:00 PM PT. No new activity is visible across the lot, as all equipment and materials remain exactly where they were.
      1:00 PM PT

      No new activity is visible across the lot, as all equipment and materials remain exactly where they were.

    6. Construction camera frame at 12:45 PM PT. The demolition site maintains a similar appearance to its state fifteen minutes ago, with no apparent alterations to the debris or equipment layout.
      12:45 PM PT

      The demolition site maintains a similar appearance to its state fifteen minutes ago, with no apparent alterations to the debris or equipment layout.

    7. Construction camera frame at 12:30 PM PT. The site presents a consistent view, with no observable changes to the position of equipment or the size of the debris pile.
      12:30 PM PT

      The site presents a consistent view, with no observable changes to the position of equipment or the size of the debris pile.

    8. Construction camera frame at 12:15 PM PT. The scene is stable, with no discernible movement of equipment or changes to the rubble pile in the last quarter of an hour.
      12:15 PM PT

      The scene is stable, with no discernible movement of equipment or changes to the rubble pile in the last quarter of an hour.

    9. Construction camera frame at 12:00 PM PT. Everything on site appears to be holding its place, with no noticeable shifts in equipment or the debris field.
      12:00 PM PT

      Everything on site appears to be holding its place, with no noticeable shifts in equipment or the debris field.

    10. Construction camera frame at 11:45 AM PT. The site appears remarkably unchanged, with all machinery and the debris pile holding their previous positions.
      11:45 AM PT

      The site appears remarkably unchanged, with all machinery and the debris pile holding their previous positions.

    11. Construction camera frame at 11:30 AM PT. The demolition site shows no significant alterations over the last fifteen minutes, with equipment and the debris pile remaining in the same positions.
      11:30 AM PT

      The demolition site shows no significant alterations over the last fifteen minutes, with equipment and the debris pile remaining in the same positions.

  12. Construction camera frame at 11:15 AM PT. The site continues to look as it did previously, without any clear changes to equipment or the debris.
    11:15 AM PT

    The site continues to look as it did previously, without any clear changes to equipment or the debris.

  13. 7 similar no-change frames9:30 AM–11:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:00 AM PT. The site remains much as it was, with no apparent changes to the machinery or rubble.
      11:00 AM PT

      The site remains much as it was, with no apparent changes to the machinery or rubble.

    2. Construction camera frame at 10:45 AM PT. The demolition site maintains its current appearance, with no apparent shifts in positioning of machinery or the debris field.
      10:45 AM PT

      The demolition site maintains its current appearance, with no apparent shifts in positioning of machinery or the debris field.

    3. Construction camera frame at 10:30 AM PT. The scene holds steady, with no visible movement of equipment or changes to the debris pile in the last quarter hour.
      10:30 AM PT

      The scene holds steady, with no visible movement of equipment or changes to the debris pile in the last quarter hour.

    4. Construction camera frame at 10:15 AM PT. The demolition site presents a consistent view, with no noticeable alterations to the equipment or debris field.
      10:15 AM PT

      The demolition site presents a consistent view, with no noticeable alterations to the equipment or debris field.

    5. Construction camera frame at 10:00 AM PT. The site appears static, showing no discernible changes in equipment placement or the size of the rubble pile.
      10:00 AM PT

      The site appears static, showing no discernible changes in equipment placement or the size of the rubble pile.

    6. Construction camera frame at 9:45 AM PT. The overall scene remains largely unchanged, with no discernible shifts in equipment or debris.
      9:45 AM PT

      The overall scene remains largely unchanged, with no discernible shifts in equipment or debris.

    7. Construction camera frame at 9:30 AM PT. No movement is visible across the site, from the staging area to the central debris.
      9:30 AM PT

      No movement is visible across the site, from the staging area to the central debris.

  14. Construction camera frame at 9:15 AM PT. The site continues to show a remarkably similar layout, with no readily apparent alterations in equipment positioning or debris accumulation.
    9:15 AM PT

    The site continues to show a remarkably similar layout, with no readily apparent alterations in equipment positioning or debris accumulation.

  15. Construction camera frame at 9:00 AM PT. Everything remains in place across the lot, with no movement of machinery or changes to the debris.
    9:00 AM PT

    Everything remains in place across the lot, with no movement of machinery or changes to the debris.

  16. Construction camera frame at 8:45 AM PT. The scene is holding steady, with no obvious movement of machinery or increase in the debris pile.
    8:45 AM PT

    The scene is holding steady, with no obvious movement of machinery or increase in the debris pile.

  17. Construction camera frame at 8:30 AM PT. The demolition site shows minimal deviation from the last check-in, with all equipment appearing to remain in the same locations.
    8:30 AM PT

    The demolition site shows minimal deviation from the last check-in, with all equipment appearing to remain in the same locations.

  18. Construction camera frame at 8:15 AM PT. The site presents a consistent view, showing no significant adjustments to the placement of machinery or the debris.
    8:15 AM PT

    The site presents a consistent view, showing no significant adjustments to the placement of machinery or the debris.

  19. 18 similar no-change frames12:00 AM–8:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 AM PT. The scene remains stable, with no noticeable shifts in the location of equipment or the amount of debris.
      8:00 AM PT

      The scene remains stable, with no noticeable shifts in the location of equipment or the amount of debris.

    2. Construction camera frame at 7:45 AM PT. The demolition site appears largely unchanged, with equipment remaining in the same positions.
      7:45 AM PT

      The demolition site appears largely unchanged, with equipment remaining in the same positions.

    3. Construction camera frame at 7:30 AM PT. The site maintains a quiet state, with no apparent alterations to the positioning of equipment or the size of the rubble.
      7:30 AM PT

      The site maintains a quiet state, with no apparent alterations to the positioning of equipment or the size of the rubble.

    4. Construction camera frame at 7:15 AM PT. The site holds a similar appearance to the previous view, with no discernible alterations to the equipment or debris.
      7:15 AM PT

      The site holds a similar appearance to the previous view, with no discernible alterations to the equipment or debris.

    5. Construction camera frame at 7:00 AM PT. The site’s appearance is remarkably steady, with no observable changes in equipment or the debris field.
      7:00 AM PT

      The site’s appearance is remarkably steady, with no observable changes in equipment or the debris field.

    6. Construction camera frame at 6:45 AM PT. The overall layout of the site remains the same, showing no significant movement of machinery or debris.
      6:45 AM PT

      The overall layout of the site remains the same, showing no significant movement of machinery or debris.

    7. Construction camera frame at 6:30 AM PT. The site presents a consistent picture, with no visible alterations to the equipment or debris pile.
      6:30 AM PT

      The site presents a consistent picture, with no visible alterations to the equipment or debris pile.

    8. Construction camera frame at 6:15 AM PT. The scene remains stable, with no noticeable shifts in equipment placement or demolition progress.
      6:15 AM PT

      The scene remains stable, with no noticeable shifts in equipment placement or demolition progress.

    9. Construction camera frame at 6:00 AM PT. The demolition site appears largely unchanged, with equipment remaining in the same positions as before.
      6:00 AM PT

      The demolition site appears largely unchanged, with equipment remaining in the same positions as before.

    10. Construction camera frame at 5:45 AM PT. No construction activity — the site is quiet.
      5:45 AM PT

      No construction activity — the site is quiet.

    11. Construction camera frame at 5:30 AM PT. No construction activity — the site is quiet.
      5:30 AM PT

      No construction activity — the site is quiet.

    12. Construction camera frame at 5:15 AM PT. No construction activity — the site is quiet.
      5:15 AM PT

      No construction activity — the site is quiet.

    13. Construction camera frame at 5:00 AM PT. Visibility has improved, revealing that the site remains quiet with no apparent changes in activity.
      5:00 AM PT

      Visibility has improved, revealing that the site remains quiet with no apparent changes in activity.

    14. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    15. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    16. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    17. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    18. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Jun 19All daysJun 21 →