Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Monday, June 22, 2026

Construction log

Monday, June 22, 2026

75 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The site has been fully cleared of all buildings and rubble since the last reference frame, with only the cleared ground and some machinery remaining. Today, a small excavator moved towards the service road, a loader moved debris into a dump truck, and a crane swung a load towards the rubble pile, which grew slightly.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. No construction activity — the site is quiet.
    9:30 PM PT

    No construction activity — the site is quiet.

  4. No construction activity — the site is quiet.
    9:15 PM PT

    No construction activity — the site is quiet.

  5. No construction activity — the site is quiet.
    9:00 PM PT

    No construction activity — the site is quiet.

  6. No construction activity — the site is quiet.
    8:45 PM PT

    No construction activity — the site is quiet.

  7. No construction activity — the site is quiet.
    8:30 PM PT

    No construction activity — the site is quiet.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. The overall scene is holding steady, with no obvious changes to the arrangement of equipment or the size of the debris pile.
    6:45 PM PT

    The overall scene is holding steady, with no obvious changes to the arrangement of equipment or the size of the debris pile.

  15. The site maintains a consistent appearance, with no significant shifts in the debris or the positions of the parked machinery.
    6:30 PM PT

    The site maintains a consistent appearance, with no significant shifts in the debris or the positions of the parked machinery.

  16. The demolition site continues to show a nearly identical arrangement of equipment and debris.
    6:15 PM PT

    The demolition site continues to show a nearly identical arrangement of equipment and debris.

  17. The scene remains largely static, with no noticeable movement of machinery or increase in the rubble pile.
    6:00 PM PT

    The scene remains largely static, with no noticeable movement of machinery or increase in the rubble pile.

  18. The site’s layout is essentially unchanged, with equipment remaining in the same positions.
    5:45 PM PT

    The site’s layout is essentially unchanged, with equipment remaining in the same positions.

  19. The scene appears stable, with no discernible alterations to the equipment or the debris pile in the last quarter hour.
    5:30 PM PT

    The scene appears stable, with no discernible alterations to the equipment or the debris pile in the last quarter hour.

  20. The site’s appearance is remarkably consistent, showing no changes in equipment positioning or debris accumulation.
    5:15 PM PT

    The site’s appearance is remarkably consistent, showing no changes in equipment positioning or debris accumulation.

  21. The demolition site presents a familiar picture, with no readily apparent alterations to the equipment or debris.
    5:00 PM PT

    The demolition site presents a familiar picture, with no readily apparent alterations to the equipment or debris.

  22. The demolition site shows no appreciable differences in the placement of equipment or the size of the debris pile over the last fifteen minutes.
    4:45 PM PT

    The demolition site shows no appreciable differences in the placement of equipment or the size of the debris pile over the last fifteen minutes.

  23. The site continues to look very much the same, with no obvious shifts in the position of equipment or the size of the debris pile.
    4:30 PM PT

    The site continues to look very much the same, with no obvious shifts in the position of equipment or the size of the debris pile.

  24. The scene remains largely as it was, with no noticeable changes to the equipment or debris arrangement.
    4:15 PM PT

    The scene remains largely as it was, with no noticeable changes to the equipment or debris arrangement.

  25. The site maintains its current configuration, with no apparent movement of machinery or significant changes to the debris field.
    4:00 PM PT

    The site maintains its current configuration, with no apparent movement of machinery or significant changes to the debris field.

  26. The site appears static, with no discernible changes in equipment location or the amount of debris.
    3:45 PM PT

    The site appears static, with no discernible changes in equipment location or the amount of debris.

  27. The view across the demolition site is remarkably consistent, showing no significant shifts in equipment or debris.
    3:30 PM PT

    The view across the demolition site is remarkably consistent, showing no significant shifts in equipment or debris.

  28. The site presents a largely unchanged view, with the machinery and rubble pile remaining in the same positions.
    3:15 PM PT

    The site presents a largely unchanged view, with the machinery and rubble pile remaining in the same positions.

  29. The demolition site shows no alterations in equipment positioning or debris accumulation over the last fifteen minutes.
    3:00 PM PT

    The demolition site shows no alterations in equipment positioning or debris accumulation over the last fifteen minutes.

  30. Everything remains in place across the lot and staging area.
    2:45 PM PT

    Everything remains in place across the lot and staging area.

  31. The scene is holding steady, with no noticeable adjustments to equipment or the size of the rubble pile.
    2:30 PM PT

    The scene is holding steady, with no noticeable adjustments to equipment or the size of the rubble pile.

  32. The overall layout of the demolition site remains constant, with no discernible movement of equipment or significant changes to the debris.
    2:15 PM PT

    The overall layout of the demolition site remains constant, with no discernible movement of equipment or significant changes to the debris.

  33. The site appears stable, with equipment and the debris pile maintaining their prior positions.
    2:00 PM PT

    The site appears stable, with equipment and the debris pile maintaining their prior positions.

  34. A dump truck has exited the site via the driveway on the left, and another appears to be taking its place.
    1:45 PM PT

    A dump truck has exited the site via the driveway on the left, and another appears to be taking its place.

  35. No visible activity or movement has occurred across the site.
    1:30 PM PT

    No visible activity or movement has occurred across the site.

  36. The site maintains a largely unchanged appearance, with no obvious shifts in equipment placement or debris levels.
    1:15 PM PT

    The site maintains a largely unchanged appearance, with no obvious shifts in equipment placement or debris levels.

  37. The scene shows minimal alteration from the previous view, with all equipment appearing to stay in place.
    1:00 PM PT

    The scene shows minimal alteration from the previous view, with all equipment appearing to stay in place.

  38. The site’s appearance is remarkably consistent, with machinery and debris remaining in the same positions.
    12:45 PM PT

    The site’s appearance is remarkably consistent, with machinery and debris remaining in the same positions.

  39. The central rubble pile appears slightly larger, with the excavator continuing to work within it.
    12:30 PM PT

    The central rubble pile appears slightly larger, with the excavator continuing to work within it.

  40. The site remains relatively static, with equipment positioned as it was moments ago.
    12:15 PM PT

    The site remains relatively static, with equipment positioned as it was moments ago.

  41. The demolition site presents a similar view as before, with no readily apparent adjustments to the equipment or debris.
    12:00 PM PT

    The demolition site presents a similar view as before, with no readily apparent adjustments to the equipment or debris.

  42. No significant activity or movement is visible across the site.
    11:45 AM PT

    No significant activity or movement is visible across the site.

  43. A flatbed truck is exiting the site via the service road on the right.
    11:30 AM PT

    A flatbed truck is exiting the site via the service road on the right.

  44. The scene appears largely unchanged, though a new orange traffic cone has appeared near the service road on the right.
    11:15 AM PT

    The scene appears largely unchanged, though a new orange traffic cone has appeared near the service road on the right.

  45. The excavator is now working alongside a second, smaller piece of machinery in the center of the demolition zone.
    11:00 AM PT

    The excavator is now working alongside a second, smaller piece of machinery in the center of the demolition zone.

  46. A white van has entered the site through the driveway on the left, parking near the staging area.
    10:45 AM PT

    A white van has entered the site through the driveway on the left, parking near the staging area.

  47. The site remains fairly static, with no obvious shifts in equipment positioning or debris removal.
    10:30 AM PT

    The site remains fairly static, with no obvious shifts in equipment positioning or debris removal.

  48. The excavator appears to have repositioned itself further into the center of the demolition zone.
    10:15 AM PT

    The excavator appears to have repositioned itself further into the center of the demolition zone.

  49. No new activity is visible across the site.
    10:00 AM PT

    No new activity is visible across the site.

  50. The staging area on the upper-left appears busier, as a crane is now actively swinging a load toward the rubble pile.
    9:45 AM PT

    The staging area on the upper-left appears busier, as a crane is now actively swinging a load toward the rubble pile.

  51. The rubble pile has grown incrementally, with the excavator continuing to feed debris into it.
    9:30 AM PT

    The rubble pile has grown incrementally, with the excavator continuing to feed debris into it.

  52. The excavator in the center of the lot has shifted slightly, now angled a bit more to the right.
    9:15 AM PT

    The excavator in the center of the lot has shifted slightly, now angled a bit more to the right.

  53. The scene appears largely unchanged, with equipment remaining in similar positions throughout the site.
    9:00 AM PT

    The scene appears largely unchanged, with equipment remaining in similar positions throughout the site.

  54. A noticeable rearrangement of equipment is taking place in the upper-left staging area, with a yellow loader now positioned closer to the street.
    8:45 AM PT

    A noticeable rearrangement of equipment is taking place in the upper-left staging area, with a yellow loader now positioned closer to the street.

  55. A small dump truck has entered the site via the service road on the right, positioning itself near the central rubble pile.
    8:30 AM PT

    A small dump truck has entered the site via the service road on the right, positioning itself near the central rubble pile.

  56. The scene is remarkably consistent, showing little to no alteration in equipment positions or debris levels.
    8:15 AM PT

    The scene is remarkably consistent, showing little to no alteration in equipment positions or debris levels.

  57. The staging area shows a subtle shift, with a dump truck now positioned where an excavator was previously parked.
    8:00 AM PT

    The staging area shows a subtle shift, with a dump truck now positioned where an excavator was previously parked.

  58. The rubble pile has grown slightly, with fresh debris visible along its eastern edge.
    7:45 AM PT

    The rubble pile has grown slightly, with fresh debris visible along its eastern edge.

  59. Everything remains in place across the lot and staging area.
    7:30 AM PT

    Everything remains in place across the lot and staging area.

  60. Activity in the upper-left staging area has increased, as a loader is now actively moving debris into a waiting dump truck.
    7:15 AM PT

    Activity in the upper-left staging area has increased, as a loader is now actively moving debris into a waiting dump truck.

  61. The site appears stable, with no clear movement of machinery or noticeable increase in the rubble pile over the last quarter hour.
    7:00 AM PT

    The site appears stable, with no clear movement of machinery or noticeable increase in the rubble pile over the last quarter hour.

  62. The site is largely unchanged, though the shadows have shifted slightly with the sun’s movement.
    6:45 AM PT

    The site is largely unchanged, though the shadows have shifted slightly with the sun’s movement.

  63. The scene remains consistent, with no significant changes to the equipment arrangement or debris accumulation apparent.
    6:30 AM PT

    The scene remains consistent, with no significant changes to the equipment arrangement or debris accumulation apparent.

  64. A small orange excavator has moved from the central rubble pile toward the service road on the right side of the frame.
    6:15 AM PT

    A small orange excavator has moved from the central rubble pile toward the service road on the right side of the frame.

  65. The site continues in a quiet state, with no readily apparent adjustments to the positioning of equipment or the height of the rubble.
    6:00 AM PT

    The site continues in a quiet state, with no readily apparent adjustments to the positioning of equipment or the height of the rubble.

  66. The scene is holding steady, with no noticeable alterations to the layout of equipment or the size of the debris pile.
    5:45 AM PT

    The scene is holding steady, with no noticeable alterations to the layout of equipment or the size of the debris pile.

  67. The demolition site presents a static view, with all equipment remaining in the same positions as before.
    5:30 AM PT

    The demolition site presents a static view, with all equipment remaining in the same positions as before.

  68. The site appears much the same as before, with no discernible movement of equipment or increase in the rubble pile.
    5:15 AM PT

    The site appears much the same as before, with no discernible movement of equipment or increase in the rubble pile.

  69. The site remains largely as it was, with no obvious shifts in machinery or the debris field.
    5:00 AM PT

    The site remains largely as it was, with no obvious shifts in machinery or the debris field.

  70. Visibility has improved, revealing a quiet site with no apparent changes in equipment or debris levels.
    4:45 AM PT

    Visibility has improved, revealing a quiet site with no apparent changes in equipment or debris levels.

  71. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  75. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jun 21All daysJun 23 →