Skip to content
Newbellevue.wiki — a field guide to every tower, park & landmark in Bellevue, from the same independent maker.Visit ↗
606Onni 606 · Bellevue
  • Live
  • Timelapse
  • News
  • Towers
  • Skyline
  • Location
  • Timeline
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

Project

  • Overview
  • Live cam
  • Live data
  • Construction log
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer
  • All of Bellevue ↗

Help

  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, June 23, 2026

Construction log

Tuesday, June 23, 2026

75 snapshots from the live camera.

Onni 606 · project recordDowntown Bellevue

AI digest

The site was largely quiet today, with a few workers and vehicles visible, and some minor repositioning of equipment. The rubble pile in the center of the site appears slightly larger by the end of the day.

▶ Play this day as a timelapse
  1. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. No construction activity — the site is quiet.
    10:00 PM PT

    No construction activity — the site is quiet.

  3. The demolition site maintains its current appearance, with no apparent alterations to the machinery or debris arrangement.
    9:30 PM PT

    The demolition site maintains its current appearance, with no apparent alterations to the machinery or debris arrangement.

  4. The site presents a similar view as before, with no readily apparent changes to the equipment or debris.
    9:15 PM PT

    The site presents a similar view as before, with no readily apparent changes to the equipment or debris.

  5. The site holds steady, with no discernible shifts in the location of equipment or the size of the debris field.
    9:00 PM PT

    The site holds steady, with no discernible shifts in the location of equipment or the size of the debris field.

  6. The demolition site appears static, with no noticeable changes in equipment position or debris levels.
    8:45 PM PT

    The demolition site appears static, with no noticeable changes in equipment position or debris levels.

  7. The scene remains largely unchanged, with no apparent movement of machinery or significant alteration to the rubble pile.
    8:30 PM PT

    The scene remains largely unchanged, with no apparent movement of machinery or significant alteration to the rubble pile.

  8. No construction activity — the site is quiet.
    8:15 PM PT

    No construction activity — the site is quiet.

  9. No construction activity — the site is quiet.
    8:00 PM PT

    No construction activity — the site is quiet.

  10. No construction activity — the site is quiet.
    7:45 PM PT

    No construction activity — the site is quiet.

  11. No construction activity — the site is quiet.
    7:30 PM PT

    No construction activity — the site is quiet.

  12. No construction activity — the site is quiet.
    7:15 PM PT

    No construction activity — the site is quiet.

  13. No construction activity — the site is quiet.
    7:00 PM PT

    No construction activity — the site is quiet.

  14. The site maintains its previous configuration, with no discernible alterations to the machinery or debris arrangement.
    6:45 PM PT

    The site maintains its previous configuration, with no discernible alterations to the machinery or debris arrangement.

  15. The view of the demolition site is remarkably consistent, showing no discernible changes in the last fifteen minutes.
    6:30 PM PT

    The view of the demolition site is remarkably consistent, showing no discernible changes in the last fifteen minutes.

  16. The demolition site remains in a holding pattern, with no obvious alterations to the equipment or the rubble’s extent.
    6:15 PM PT

    The demolition site remains in a holding pattern, with no obvious alterations to the equipment or the rubble’s extent.

  17. The site continues in a quiet state, showing no noticeable shifts in machinery or debris placement.
    6:00 PM PT

    The site continues in a quiet state, showing no noticeable shifts in machinery or debris placement.

  18. The scene appears static, with no discernible changes to the equipment or the debris pile in the last fifteen minutes.
    5:45 PM PT

    The scene appears static, with no discernible changes to the equipment or the debris pile in the last fifteen minutes.

  19. The site presents a similar view as before, with no apparent movement of machinery or significant alteration to the debris field.
    5:30 PM PT

    The site presents a similar view as before, with no apparent movement of machinery or significant alteration to the debris field.

  20. The scene remains largely unchanged, with equipment and debris holding their positions.
    5:15 PM PT

    The scene remains largely unchanged, with equipment and debris holding their positions.

  21. The demolition site shows no perceptible difference in the arrangement of materials or machinery over the last quarter hour.
    5:00 PM PT

    The demolition site shows no perceptible difference in the arrangement of materials or machinery over the last quarter hour.

  22. Everything remains as it was, with no noticeable activity or repositioning of equipment.
    4:45 PM PT

    Everything remains as it was, with no noticeable activity or repositioning of equipment.

  23. The demolition site maintains its current state, with no visible alterations in equipment or debris arrangement.
    4:30 PM PT

    The demolition site maintains its current state, with no visible alterations in equipment or debris arrangement.

  24. The site holds steady, showing no noticeable shifts in equipment placement or debris accumulation.
    4:15 PM PT

    The site holds steady, showing no noticeable shifts in equipment placement or debris accumulation.

  25. The site appears static, with all visible equipment and debris remaining in the same locations as before.
    4:00 PM PT

    The site appears static, with all visible equipment and debris remaining in the same locations as before.

  26. The site presents a consistent view, with no discernible changes to the positioning of equipment or the debris field.
    3:45 PM PT

    The site presents a consistent view, with no discernible changes to the positioning of equipment or the debris field.

  27. The scene remains stable, with no apparent movement of vehicles or machinery during this interval.
    3:30 PM PT

    The scene remains stable, with no apparent movement of vehicles or machinery during this interval.

  28. The white pickup truck near the rubble pile has moved slightly, now positioned closer to the upper-left staging area.
    3:15 PM PT

    The white pickup truck near the rubble pile has moved slightly, now positioned closer to the upper-left staging area.

  29. A white pickup truck has appeared near the center of the demolition zone, positioned between the rubble and the staging area.
    3:00 PM PT

    A white pickup truck has appeared near the center of the demolition zone, positioned between the rubble and the staging area.

  30. The demolition site shows minimal difference from the previous view, with equipment remaining in the same positions.
    2:45 PM PT

    The demolition site shows minimal difference from the previous view, with equipment remaining in the same positions.

  31. The equipment arrangement remains largely unchanged, though the excavator in the center of the site appears to have shifted slightly.
    2:30 PM PT

    The equipment arrangement remains largely unchanged, though the excavator in the center of the site appears to have shifted slightly.

  32. The site appears quiet, with no notable alterations to the equipment positions or debris layout.
    2:15 PM PT

    The site appears quiet, with no notable alterations to the equipment positions or debris layout.

  33. A yellow dump truck has entered the site via the service road along the right edge of the frame.
    2:00 PM PT

    A yellow dump truck has entered the site via the service road along the right edge of the frame.

  34. The rubble pile appears slightly larger, with more debris concentrated towards the center of the site.
    1:45 PM PT

    The rubble pile appears slightly larger, with more debris concentrated towards the center of the site.

  35. The scene is holding steady, with no apparent movement of equipment or significant changes to the debris field.
    1:30 PM PT

    The scene is holding steady, with no apparent movement of equipment or significant changes to the debris field.

  36. The staging area has a dump truck pulling out onto the street via the driveway on the left.
    1:15 PM PT

    The staging area has a dump truck pulling out onto the street via the driveway on the left.

  37. The site remains remarkably consistent, showing no discernible changes in machinery or debris arrangement.
    1:00 PM PT

    The site remains remarkably consistent, showing no discernible changes in machinery or debris arrangement.

  38. The demolition site shows minimal shifts, with everything appearing to be in roughly the same location.
    12:45 PM PT

    The demolition site shows minimal shifts, with everything appearing to be in roughly the same location.

  39. The staging area in the upper-left corner now has a noticeable cluster of stacked materials that weren't there previously.
    12:30 PM PT

    The staging area in the upper-left corner now has a noticeable cluster of stacked materials that weren't there previously.

  40. The site appears largely unchanged, with equipment and debris remaining in the same positions as before.
    12:15 PM PT

    The site appears largely unchanged, with equipment and debris remaining in the same positions as before.

  41. An additional piece of yellow machinery is now visible near the lower-center of the site, positioned close to the rubble.
    12:00 PM PT

    An additional piece of yellow machinery is now visible near the lower-center of the site, positioned close to the rubble.

  42. Everything remains in place across the site, with no new movement or changes to the debris.
    11:45 AM PT

    Everything remains in place across the site, with no new movement or changes to the debris.

  43. The scene presents a largely static view, with no obvious alterations to equipment placement or debris levels.
    11:30 AM PT

    The scene presents a largely static view, with no obvious alterations to equipment placement or debris levels.

  44. A dump truck is exiting the site via the driveway along the street on the left.
    11:15 AM PT

    A dump truck is exiting the site via the driveway along the street on the left.

  45. The excavator in the center of the site has shifted position, now angled slightly to the right and working at a different part of the rubble pile.
    11:00 AM PT

    The excavator in the center of the site has shifted position, now angled slightly to the right and working at a different part of the rubble pile.

  46. A red and black piece of machinery has appeared near the front left corner of the site, having been absent in the previous view.
    10:45 AM PT

    A red and black piece of machinery has appeared near the front left corner of the site, having been absent in the previous view.

  47. The site remains quiet, with no discernible shifts in equipment or the accumulation of rubble.
    10:30 AM PT

    The site remains quiet, with no discernible shifts in equipment or the accumulation of rubble.

  48. The demolition site appears unchanged, with equipment and debris remaining in the same positions as before.
    10:15 AM PT

    The demolition site appears unchanged, with equipment and debris remaining in the same positions as before.

  49. The staging area shows a slight shift, with a loader now positioned further back near the material piles.
    10:00 AM PT

    The staging area shows a slight shift, with a loader now positioned further back near the material piles.

  50. The scene is holding steady, with no visible adjustments to the placement of equipment or the size of the debris pile.
    9:45 AM PT

    The scene is holding steady, with no visible adjustments to the placement of equipment or the size of the debris pile.

  51. The site continues to look largely as it did moments ago, with no obvious changes in equipment or the debris field.
    9:30 AM PT

    The site continues to look largely as it did moments ago, with no obvious changes in equipment or the debris field.

  52. The demolition site shows little in the way of noticeable progress over the last quarter hour.
    9:15 AM PT

    The demolition site shows little in the way of noticeable progress over the last quarter hour.

  53. The scene presents a continuation of ongoing work, though with no immediately apparent alterations in equipment or debris placement.
    9:00 AM PT

    The scene presents a continuation of ongoing work, though with no immediately apparent alterations in equipment or debris placement.

  54. The site remains remarkably static, showing no significant movement of machinery or accumulation of debris.
    8:45 AM PT

    The site remains remarkably static, showing no significant movement of machinery or accumulation of debris.

  55. The demolition site maintains a largely unchanged appearance, with equipment and debris in similar positions.
    8:30 AM PT

    The demolition site maintains a largely unchanged appearance, with equipment and debris in similar positions.

  56. The site appears quiet, with no discernible shifts in equipment positioning or debris levels.
    8:15 AM PT

    The site appears quiet, with no discernible shifts in equipment positioning or debris levels.

  57. The staging area shows a repositioned loader, now closer to the central rubble pile.
    8:00 AM PT

    The staging area shows a repositioned loader, now closer to the central rubble pile.

  58. Activity is minimal, and the site’s layout remains consistent with the previous view.
    7:45 AM PT

    Activity is minimal, and the site’s layout remains consistent with the previous view.

  59. The site exhibits a steady state, with all visible equipment and debris remaining in the same configuration.
    7:30 AM PT

    The site exhibits a steady state, with all visible equipment and debris remaining in the same configuration.

  60. The scene appears stable, with no noticeable alterations to the arrangement of equipment or the debris accumulation.
    7:15 AM PT

    The scene appears stable, with no noticeable alterations to the arrangement of equipment or the debris accumulation.

  61. A dump truck is exiting the site via the driveway on the left.
    7:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  62. The demolition site remains largely unchanged, with no visible progress in dismantling the structures or repositioning equipment.
    6:45 AM PT

    The demolition site remains largely unchanged, with no visible progress in dismantling the structures or repositioning equipment.

  63. The site maintains a consistent appearance, with no obvious alterations to the equipment layout or debris field.
    6:30 AM PT

    The site maintains a consistent appearance, with no obvious alterations to the equipment layout or debris field.

  64. The scene presents a nearly identical view, with no discernible shifts in the position of equipment or the size of the debris pile.
    6:15 AM PT

    The scene presents a nearly identical view, with no discernible shifts in the position of equipment or the size of the debris pile.

  65. The demolition site shows minimal alteration from the previous view, with equipment remaining in the same positions.
    6:00 AM PT

    The demolition site shows minimal alteration from the previous view, with equipment remaining in the same positions.

  66. The site is holding steady, with no apparent movement of machinery or increase in the rubble pile.
    5:45 AM PT

    The site is holding steady, with no apparent movement of machinery or increase in the rubble pile.

  67. The site appears stable, with no significant shifts in equipment or debris since the last view.
    5:30 AM PT

    The site appears stable, with no significant shifts in equipment or debris since the last view.

  68. Several workers are now visible in the upper-left staging area, near a loader and some stacked materials. The overall scene is otherwise consistent with the previous view.
    5:15 AM PT

    Several workers are now visible in the upper-left staging area, near a loader and some stacked materials. The overall scene is otherwise consistent with the previous view.

  69. The scene remains largely unchanged, though a few more vehicles are visible along the street to the left.
    5:00 AM PT

    The scene remains largely unchanged, though a few more vehicles are visible along the street to the left.

  70. Visibility remains low, but the site appears quiet with no noticeable changes in activity.
    4:45 AM PT

    Visibility remains low, but the site appears quiet with no noticeable changes in activity.

  71. No construction activity — the site is quiet.
    4:00 AM PT

    No construction activity — the site is quiet.

  72. No construction activity — the site is quiet.
    3:00 AM PT

    No construction activity — the site is quiet.

  73. No construction activity — the site is quiet.
    2:00 AM PT

    No construction activity — the site is quiet.

  74. No construction activity — the site is quiet.
    1:00 AM PT

    No construction activity — the site is quiet.

  75. No construction activity — the site is quiet.
    12:00 AM PT

    No construction activity — the site is quiet.

← Jun 22All daysJun 24 →