Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, June 23, 2026

Construction log

Tuesday, June 23, 2026

75 snapshots from the live camera.


AI digest

The site was largely quiet, with no clear change in the ground or equipment layout between the day’s frames. A few trucks came and went, and workers and loaders were briefly visible in the staging area.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:30 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:30 PM PT. The demolition site maintains its current appearance, with no apparent alterations to the machinery or debris arrangement.
      9:30 PM PT

      The demolition site maintains its current appearance, with no apparent alterations to the machinery or debris arrangement.

  3. Construction camera frame at 9:15 PM PT. The site presents a similar view as before, with no readily apparent changes to the equipment or debris.
    9:15 PM PT

    The site presents a similar view as before, with no readily apparent changes to the equipment or debris.

  4. 11 similar no-change frames6:30 PM–9:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 PM PT. The site holds steady, with no discernible shifts in the location of equipment or the size of the debris field.
      9:00 PM PT

      The site holds steady, with no discernible shifts in the location of equipment or the size of the debris field.

    2. Construction camera frame at 8:45 PM PT. The demolition site appears static, with no noticeable changes in equipment position or debris levels.
      8:45 PM PT

      The demolition site appears static, with no noticeable changes in equipment position or debris levels.

    3. Construction camera frame at 8:30 PM PT. The scene remains largely unchanged, with no apparent movement of machinery or significant alteration to the rubble pile.
      8:30 PM PT

      The scene remains largely unchanged, with no apparent movement of machinery or significant alteration to the rubble pile.

    4. Construction camera frame at 8:15 PM PT. No construction activity — the site is quiet.
      8:15 PM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 8:00 PM PT. No construction activity — the site is quiet.
      8:00 PM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 7:45 PM PT. No construction activity — the site is quiet.
      7:45 PM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 7:30 PM PT. No construction activity — the site is quiet.
      7:30 PM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 7:15 PM PT. No construction activity — the site is quiet.
      7:15 PM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 7:00 PM PT. No construction activity — the site is quiet.
      7:00 PM PT

      No construction activity — the site is quiet.

    10. Construction camera frame at 6:45 PM PT. The site maintains its previous configuration, with no discernible alterations to the machinery or debris arrangement.
      6:45 PM PT

      The site maintains its previous configuration, with no discernible alterations to the machinery or debris arrangement.

    11. Construction camera frame at 6:30 PM PT. The view of the demolition site is remarkably consistent, showing no discernible changes in the last fifteen minutes.
      6:30 PM PT

      The view of the demolition site is remarkably consistent, showing no discernible changes in the last fifteen minutes.

  5. Construction camera frame at 6:15 PM PT. The demolition site remains in a holding pattern, with no obvious alterations to the equipment or the rubble’s extent.
    6:15 PM PT

    The demolition site remains in a holding pattern, with no obvious alterations to the equipment or the rubble’s extent.

  6. 4 similar no-change frames5:15 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The site continues in a quiet state, showing no noticeable shifts in machinery or debris placement.
      6:00 PM PT

      The site continues in a quiet state, showing no noticeable shifts in machinery or debris placement.

    2. Construction camera frame at 5:45 PM PT. The scene appears static, with no discernible changes to the equipment or the debris pile in the last fifteen minutes.
      5:45 PM PT

      The scene appears static, with no discernible changes to the equipment or the debris pile in the last fifteen minutes.

    3. Construction camera frame at 5:30 PM PT. The site presents a similar view as before, with no apparent movement of machinery or significant alteration to the debris field.
      5:30 PM PT

      The site presents a similar view as before, with no apparent movement of machinery or significant alteration to the debris field.

    4. Construction camera frame at 5:15 PM PT. The scene remains largely unchanged, with equipment and debris holding their positions.
      5:15 PM PT

      The scene remains largely unchanged, with equipment and debris holding their positions.

  7. Construction camera frame at 5:00 PM PT. The demolition site shows no perceptible difference in the arrangement of materials or machinery over the last quarter hour.
    5:00 PM PT

    The demolition site shows no perceptible difference in the arrangement of materials or machinery over the last quarter hour.

  8. 6 similar no-change frames3:30 PM–4:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:45 PM PT. Everything remains as it was, with no noticeable activity or repositioning of equipment.
      4:45 PM PT

      Everything remains as it was, with no noticeable activity or repositioning of equipment.

    2. Construction camera frame at 4:30 PM PT. The demolition site maintains its current state, with no visible alterations in equipment or debris arrangement.
      4:30 PM PT

      The demolition site maintains its current state, with no visible alterations in equipment or debris arrangement.

    3. Construction camera frame at 4:15 PM PT. The site holds steady, showing no noticeable shifts in equipment placement or debris accumulation.
      4:15 PM PT

      The site holds steady, showing no noticeable shifts in equipment placement or debris accumulation.

    4. Construction camera frame at 4:00 PM PT. The site appears static, with all visible equipment and debris remaining in the same locations as before.
      4:00 PM PT

      The site appears static, with all visible equipment and debris remaining in the same locations as before.

    5. Construction camera frame at 3:45 PM PT. The site presents a consistent view, with no discernible changes to the positioning of equipment or the debris field.
      3:45 PM PT

      The site presents a consistent view, with no discernible changes to the positioning of equipment or the debris field.

    6. Construction camera frame at 3:30 PM PT. The scene remains stable, with no apparent movement of vehicles or machinery during this interval.
      3:30 PM PT

      The scene remains stable, with no apparent movement of vehicles or machinery during this interval.

  9. Construction camera frame at 3:15 PM PT. The white pickup truck near the rubble pile has moved slightly, now positioned closer to the upper-left staging area.
    3:15 PM PT

    The white pickup truck near the rubble pile has moved slightly, now positioned closer to the upper-left staging area.

  10. Construction camera frame at 3:00 PM PT. A white pickup truck has appeared near the center of the demolition zone, positioned between the rubble and the staging area.
    3:00 PM PT

    A white pickup truck has appeared near the center of the demolition zone, positioned between the rubble and the staging area.

  11. 2 similar no-change frames2:30 PM–2:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:45 PM PT. The demolition site shows minimal difference from the previous view, with equipment remaining in the same positions.
      2:45 PM PT

      The demolition site shows minimal difference from the previous view, with equipment remaining in the same positions.

    2. Construction camera frame at 2:30 PM PT. The equipment arrangement remains largely unchanged, though the excavator in the center of the site appears to have shifted slightly.
      2:30 PM PT

      The equipment arrangement remains largely unchanged, though the excavator in the center of the site appears to have shifted slightly.

  12. Construction camera frame at 2:15 PM PT. The site appears quiet, with no notable alterations to the equipment positions or debris layout.
    2:15 PM PT

    The site appears quiet, with no notable alterations to the equipment positions or debris layout.

  13. Construction camera frame at 2:00 PM PT. A yellow dump truck has entered the site via the service road along the right edge of the frame.
    2:00 PM PT

    A yellow dump truck has entered the site via the service road along the right edge of the frame.

  14. Construction camera frame at 1:45 PM PT. The rubble pile appears slightly larger, with more debris concentrated towards the center of the site.
    1:45 PM PT

    The rubble pile appears slightly larger, with more debris concentrated towards the center of the site.

  15. Construction camera frame at 1:30 PM PT. The scene is holding steady, with no apparent movement of equipment or significant changes to the debris field.
    1:30 PM PT

    The scene is holding steady, with no apparent movement of equipment or significant changes to the debris field.

  16. Construction camera frame at 1:15 PM PT. The staging area has a dump truck pulling out onto the street via the driveway on the left.
    1:15 PM PT

    The staging area has a dump truck pulling out onto the street via the driveway on the left.

  17. Construction camera frame at 1:00 PM PT. The site remains remarkably consistent, showing no discernible changes in machinery or debris arrangement.
    1:00 PM PT

    The site remains remarkably consistent, showing no discernible changes in machinery or debris arrangement.

  18. Construction camera frame at 12:45 PM PT. The demolition site shows minimal shifts, with everything appearing to be in roughly the same location.
    12:45 PM PT

    The demolition site shows minimal shifts, with everything appearing to be in roughly the same location.

  19. Construction camera frame at 12:30 PM PT. The staging area in the upper-left corner now has a noticeable cluster of stacked materials that weren't there previously.
    12:30 PM PT

    The staging area in the upper-left corner now has a noticeable cluster of stacked materials that weren't there previously.

  20. Construction camera frame at 12:15 PM PT. The site appears largely unchanged, with equipment and debris remaining in the same positions as before.
    12:15 PM PT

    The site appears largely unchanged, with equipment and debris remaining in the same positions as before.

  21. Construction camera frame at 12:00 PM PT. An additional piece of yellow machinery is now visible near the lower-center of the site, positioned close to the rubble.
    12:00 PM PT

    An additional piece of yellow machinery is now visible near the lower-center of the site, positioned close to the rubble.

  22. 2 similar no-change frames11:30 AM–11:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:45 AM PT. Everything remains in place across the site, with no new movement or changes to the debris.
      11:45 AM PT

      Everything remains in place across the site, with no new movement or changes to the debris.

    2. Construction camera frame at 11:30 AM PT. The scene presents a largely static view, with no obvious alterations to equipment placement or debris levels.
      11:30 AM PT

      The scene presents a largely static view, with no obvious alterations to equipment placement or debris levels.

  23. Construction camera frame at 11:15 AM PT. A dump truck is exiting the site via the driveway along the street on the left.
    11:15 AM PT

    A dump truck is exiting the site via the driveway along the street on the left.

  24. Construction camera frame at 11:00 AM PT. The excavator in the center of the site has shifted position, now angled slightly to the right and working at a different part of the rubble pile.
    11:00 AM PT

    The excavator in the center of the site has shifted position, now angled slightly to the right and working at a different part of the rubble pile.

  25. Construction camera frame at 10:45 AM PT. A red and black piece of machinery has appeared near the front left corner of the site, having been absent in the previous view.
    10:45 AM PT

    A red and black piece of machinery has appeared near the front left corner of the site, having been absent in the previous view.

  26. 2 similar no-change frames10:15 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. The site remains quiet, with no discernible shifts in equipment or the accumulation of rubble.
      10:30 AM PT

      The site remains quiet, with no discernible shifts in equipment or the accumulation of rubble.

    2. Construction camera frame at 10:15 AM PT. The demolition site appears unchanged, with equipment and debris remaining in the same positions as before.
      10:15 AM PT

      The demolition site appears unchanged, with equipment and debris remaining in the same positions as before.

  27. Construction camera frame at 10:00 AM PT. The staging area shows a slight shift, with a loader now positioned further back near the material piles.
    10:00 AM PT

    The staging area shows a slight shift, with a loader now positioned further back near the material piles.

  28. Construction camera frame at 9:45 AM PT. The scene is holding steady, with no visible adjustments to the placement of equipment or the size of the debris pile.
    9:45 AM PT

    The scene is holding steady, with no visible adjustments to the placement of equipment or the size of the debris pile.

  29. Construction camera frame at 9:30 AM PT. The site continues to look largely as it did moments ago, with no obvious changes in equipment or the debris field.
    9:30 AM PT

    The site continues to look largely as it did moments ago, with no obvious changes in equipment or the debris field.

  30. Construction camera frame at 9:15 AM PT. The demolition site shows little in the way of noticeable progress over the last quarter hour.
    9:15 AM PT

    The demolition site shows little in the way of noticeable progress over the last quarter hour.

  31. Construction camera frame at 9:00 AM PT. The scene presents a continuation of ongoing work, though with no immediately apparent alterations in equipment or debris placement.
    9:00 AM PT

    The scene presents a continuation of ongoing work, though with no immediately apparent alterations in equipment or debris placement.

  32. 3 similar no-change frames8:15 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The site remains remarkably static, showing no significant movement of machinery or accumulation of debris.
      8:45 AM PT

      The site remains remarkably static, showing no significant movement of machinery or accumulation of debris.

    2. Construction camera frame at 8:30 AM PT. The demolition site maintains a largely unchanged appearance, with equipment and debris in similar positions.
      8:30 AM PT

      The demolition site maintains a largely unchanged appearance, with equipment and debris in similar positions.

    3. Construction camera frame at 8:15 AM PT. The site appears quiet, with no discernible shifts in equipment positioning or debris levels.
      8:15 AM PT

      The site appears quiet, with no discernible shifts in equipment positioning or debris levels.

  33. Construction camera frame at 8:00 AM PT. The staging area shows a repositioned loader, now closer to the central rubble pile.
    8:00 AM PT

    The staging area shows a repositioned loader, now closer to the central rubble pile.

  34. Construction camera frame at 7:45 AM PT. Activity is minimal, and the site’s layout remains consistent with the previous view.
    7:45 AM PT

    Activity is minimal, and the site’s layout remains consistent with the previous view.

  35. 2 similar no-change frames7:15 AM–7:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:30 AM PT. The site exhibits a steady state, with all visible equipment and debris remaining in the same configuration.
      7:30 AM PT

      The site exhibits a steady state, with all visible equipment and debris remaining in the same configuration.

    2. Construction camera frame at 7:15 AM PT. The scene appears stable, with no noticeable alterations to the arrangement of equipment or the debris accumulation.
      7:15 AM PT

      The scene appears stable, with no noticeable alterations to the arrangement of equipment or the debris accumulation.

  36. Construction camera frame at 7:00 AM PT. A dump truck is exiting the site via the driveway on the left.
    7:00 AM PT

    A dump truck is exiting the site via the driveway on the left.

  37. Construction camera frame at 6:45 AM PT. The demolition site remains largely unchanged, with no visible progress in dismantling the structures or repositioning equipment.
    6:45 AM PT

    The demolition site remains largely unchanged, with no visible progress in dismantling the structures or repositioning equipment.

  38. Construction camera frame at 6:30 AM PT. The site maintains a consistent appearance, with no obvious alterations to the equipment layout or debris field.
    6:30 AM PT

    The site maintains a consistent appearance, with no obvious alterations to the equipment layout or debris field.

  39. 4 similar no-change frames5:30 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The scene presents a nearly identical view, with no discernible shifts in the position of equipment or the size of the debris pile.
      6:15 AM PT

      The scene presents a nearly identical view, with no discernible shifts in the position of equipment or the size of the debris pile.

    2. Construction camera frame at 6:00 AM PT. The demolition site shows minimal alteration from the previous view, with equipment remaining in the same positions.
      6:00 AM PT

      The demolition site shows minimal alteration from the previous view, with equipment remaining in the same positions.

    3. Construction camera frame at 5:45 AM PT. The site is holding steady, with no apparent movement of machinery or increase in the rubble pile.
      5:45 AM PT

      The site is holding steady, with no apparent movement of machinery or increase in the rubble pile.

    4. Construction camera frame at 5:30 AM PT. The site appears stable, with no significant shifts in equipment or debris since the last view.
      5:30 AM PT

      The site appears stable, with no significant shifts in equipment or debris since the last view.

  40. Construction camera frame at 5:15 AM PT. Several workers are now visible in the upper-left staging area, near a loader and some stacked materials. The overall scene is otherwise consistent with the previous view.
    5:15 AM PT

    Several workers are now visible in the upper-left staging area, near a loader and some stacked materials. The overall scene is otherwise consistent with the previous view.

  41. Construction camera frame at 5:00 AM PT. The scene remains largely unchanged, though a few more vehicles are visible along the street to the left.
    5:00 AM PT

    The scene remains largely unchanged, though a few more vehicles are visible along the street to the left.

  42. Construction camera frame at 4:45 AM PT. Visibility remains low, but the site appears quiet with no noticeable changes in activity.
    4:45 AM PT

    Visibility remains low, but the site appears quiet with no noticeable changes in activity.

  43. 5 similar no-change frames12:00 AM–4:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.