Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, August 4, 2026

Construction log

Tuesday, August 4, 2026

71 snapshots from the live camera.


AI digest

The site’s graded surface and equipment layout changed little over the day; a few vehicles appeared or shifted, but no substantial ground change is evident. Compared with July 28, the central area is visibly lower and more broadly cut, with machinery repositioned around it.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. The site appears largely unchanged, with equipment and materials maintaining their previous locations.
      9:00 PM PT

      The site appears largely unchanged, with equipment and materials maintaining their previous locations.

  3. Construction camera frame at 8:45 PM PT. The site maintains a quiet state, with no obvious adjustments to the positions of machines or stockpiles.
    8:45 PM PT

    The site maintains a quiet state, with no obvious adjustments to the positions of machines or stockpiles.

  4. Construction camera frame at 8:30 PM PT. The site's appearance is nearly identical to the last view, with no discernible movement of equipment or materials.
    8:30 PM PT

    The site's appearance is nearly identical to the last view, with no discernible movement of equipment or materials.

  5. Construction camera frame at 8:15 PM PT. The overall layout of the site remains consistent, though a dark-colored vehicle has entered the driveway on the left side of the frame.
    8:15 PM PT

    The overall layout of the site remains consistent, though a dark-colored vehicle has entered the driveway on the left side of the frame.

  6. Construction camera frame at 8:00 PM PT. The scene remains steady, with all the visible machines and stockpiles holding their positions.
    8:00 PM PT

    The scene remains steady, with all the visible machines and stockpiles holding their positions.

  7. Construction camera frame at 7:45 PM PT. The site presents a very similar picture to the last check, with no visible shifts in equipment or material placement.
    7:45 PM PT

    The site presents a very similar picture to the last check, with no visible shifts in equipment or material placement.

  8. Construction camera frame at 7:30 PM PT. The site displays a largely consistent appearance, with equipment positions remaining the same over the last quarter hour.
    7:30 PM PT

    The site displays a largely consistent appearance, with equipment positions remaining the same over the last quarter hour.

  9. 3 similar no-change frames6:45 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The scene is remarkably static, with all visible equipment remaining in the same positions as before.
      7:15 PM PT

      The scene is remarkably static, with all visible equipment remaining in the same positions as before.

    2. Construction camera frame at 7:00 PM PT. The site appears largely unchanged, with the positions of the machines and materials holding consistent over the last fifteen minutes.
      7:00 PM PT

      The site appears largely unchanged, with the positions of the machines and materials holding consistent over the last fifteen minutes.

    3. Construction camera frame at 6:45 PM PT. The scene shows no significant alterations, with all visible equipment maintaining its prior location.
      6:45 PM PT

      The scene shows no significant alterations, with all visible equipment maintaining its prior location.

  10. Construction camera frame at 6:30 PM PT. The layout of the site remains stable, with all visible machinery holding its position between these frames.
    6:30 PM PT

    The layout of the site remains stable, with all visible machinery holding its position between these frames.

  11. Construction camera frame at 6:15 PM PT. The construction site remains quiet, with no apparent movement of machinery or materials during this interval.
    6:15 PM PT

    The construction site remains quiet, with no apparent movement of machinery or materials during this interval.

  12. Construction camera frame at 6:00 PM PT. The scene presents a consistent picture, with equipment appearing unmoved across the block.
    6:00 PM PT

    The scene presents a consistent picture, with equipment appearing unmoved across the block.

  13. Construction camera frame at 5:45 PM PT. The site holds steady, with no discernible shifts in the locations of equipment or materials.
    5:45 PM PT

    The site holds steady, with no discernible shifts in the locations of equipment or materials.

  14. Construction camera frame at 5:30 PM PT. Everything remains inLL in place acrossCBBS across the site between these two frames.
    5:30 PM PT

    Everything remains inLL in place acrossCBBS across the site between these two frames.

  15. 3 similar no-change frames4:45 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The site appears largely unchanged, with the positions of the machines and materials remaining consistent in this view.
      5:15 PM PT

      The site appears largely unchanged, with the positions of the machines and materials remaining consistent in this view.

    2. Construction camera frame at 5:00 PM PT. No activity or movement is detected across the block in this interval.
      5:00 PM PT

      No activity or movement is detected across the block in this interval.

    3. Construction camera frame at 4:45 PM PT. The overall layout of the site appears static, with no immediately noticeable changes in equipment placement or activity.
      4:45 PM PT

      The overall layout of the site appears static, with no immediately noticeable changes in equipment placement or activity.

  16. Construction camera frame at 4:30 PM PT. The arrangement of equipment remains stable, though one of the excavators near the center of the site has slightly altered its position.
    4:30 PM PT

    The arrangement of equipment remains stable, though one of the excavators near the center of the site has slightly altered its position.

  17. Construction camera frame at 4:15 PM PT. The scene presents a consistent appearance, with the arrangement of heavy machinery appearing unchanged over the last fifteen minutes.
    4:15 PM PT

    The scene presents a consistent appearance, with the arrangement of heavy machinery appearing unchanged over the last fifteen minutes.

  18. Construction camera frame at 4:00 PM PT. A single vehicle has entered the site via the driveway on the left side of the frame.
    4:00 PM PT

    A single vehicle has entered the site via the driveway on the left side of the frame.

  19. Construction camera frame at 3:45 PM PT. The view across the site remains remarkably similar, showing no significant movement of equipment or vehicles in the last quarter of an hour.
    3:45 PM PT

    The view across the site remains remarkably similar, showing no significant movement of equipment or vehicles in the last quarter of an hour.

  20. Construction camera frame at 3:30 PM PT. Equipment positions appear largely consistent, though some subtle shifts in the arrangement of machinery are visible in the central area.
    3:30 PM PT

    Equipment positions appear largely consistent, though some subtle shifts in the arrangement of machinery are visible in the central area.

  21. 2 similar no-change frames3:00 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. The site appears unchanged, with all visible equipment remaining in the same locations as fifteen minutes ago.
      3:15 PM PT

      The site appears unchanged, with all visible equipment remaining in the same locations as fifteen minutes ago.

    2. Construction camera frame at 3:00 PM PT. The scene is largely static, though a small piece of machinery has appeared near the lower-right corner of the site.
      3:00 PM PT

      The scene is largely static, though a small piece of machinery has appeared near the lower-right corner of the site.

  22. Construction camera frame at 2:45 PM PT. The overall scene remains stable, though a small orange vehicle has moved slightly along the service road on the right.
    2:45 PM PT

    The overall scene remains stable, though a small orange vehicle has moved slightly along the service road on the right.

  23. Construction camera frame at 2:30 PM PT. The site presents a largely consistent view, with no noticeable changes to the position of equipment over the last fifteen minutes.
    2:30 PM PT

    The site presents a largely consistent view, with no noticeable changes to the position of equipment over the last fifteen minutes.

  24. Construction camera frame at 2:15 PM PT. A blue truck is now positioned along the service road on the right side of the frame, having entered from off-camera.
    2:15 PM PT

    A blue truck is now positioned along the service road on the right side of the frame, having entered from off-camera.

  25. Construction camera frame at 2:00 PM PT. The site maintains a consistent appearance, with no readily visible shifts in equipment placement during the last fifteen minutes.
    2:00 PM PT

    The site maintains a consistent appearance, with no readily visible shifts in equipment placement during the last fifteen minutes.

  26. 2 similar no-change frames1:30 PM–1:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:45 PM PT. The machinery across the site holds its positions, showing no significant movement in the last quarter of an hour.
      1:45 PM PT

      The machinery across the site holds its positions, showing no significant movement in the last quarter of an hour.

    2. Construction camera frame at 1:30 PM PT. The arrangement of equipment remains remarkably unchanged over the past fifteen minutes.
      1:30 PM PT

      The arrangement of equipment remains remarkably unchanged over the past fifteen minutes.

  27. Construction camera frame at 1:15 PM PT. Equipment positions appear largely stable, though a yellow machine near the center has subtly rotated.
    1:15 PM PT

    Equipment positions appear largely stable, though a yellow machine near the center has subtly rotated.

  28. Construction camera frame at 1:00 PM PT. The scene appears static, with the arrangement of machinery remaining consistent over the last fifteen minutes.
    1:00 PM PT

    The scene appears static, with the arrangement of machinery remaining consistent over the last fifteen minutes.

  29. Construction camera frame at 12:45 PM PT. A small orange vehicle has appeared near the lower-right corner of the site, having not been visible in the previous frame.
    12:45 PM PT

    A small orange vehicle has appeared near the lower-right corner of the site, having not been visible in the previous frame.

  30. Construction camera frame at 12:30 PM PT. The layout of equipment across the site is essentially the same as it was moments ago.
    12:30 PM PT

    The layout of equipment across the site is essentially the same as it was moments ago.

  31. Construction camera frame at 12:15 PM PT. The site maintains a consistent appearance, with no readily apparent shifts in equipment placement or activity.
    12:15 PM PT

    The site maintains a consistent appearance, with no readily apparent shifts in equipment placement or activity.

  32. Construction camera frame at 12:00 PM PT. A single piece of heavy machinery has shifted position within the central area of the site.
    12:00 PM PT

    A single piece of heavy machinery has shifted position within the central area of the site.

  33. Construction camera frame at 11:45 AM PT. The site remains remarkably unchanged, showing no significant movement of equipment or materials in the last quarter hour.
    11:45 AM PT

    The site remains remarkably unchanged, showing no significant movement of equipment or materials in the last quarter hour.

  34. Construction camera frame at 11:30 AM PT. A small, dark-colored vehicle has moved from the service road on the right to a position near the center of the site.
    11:30 AM PT

    A small, dark-colored vehicle has moved from the service road on the right to a position near the center of the site.

  35. Construction camera frame at 11:15 AM PT. The scene presents a largely identical picture, with equipment remaining in the same locations as before.
    11:15 AM PT

    The scene presents a largely identical picture, with equipment remaining in the same locations as before.

  36. Construction camera frame at 11:00 AM PT. The scene appears very stable, with the positions of the heavy equipment and material stockpiles remaining consistent.
    11:00 AM PT

    The scene appears very stable, with the positions of the heavy equipment and material stockpiles remaining consistent.

  37. Construction camera frame at 10:45 AM PT. The arrangement of equipment across the site is largely static, though a light-colored truck has entered the driveway on the left side of the frame.
    10:45 AM PT

    The arrangement of equipment across the site is largely static, though a light-colored truck has entered the driveway on the left side of the frame.

  38. Construction camera frame at 10:30 AM PT. Activity on the site is minimal, with the arrangement of machinery appearing consistent between these views.
    10:30 AM PT

    Activity on the site is minimal, with the arrangement of machinery appearing consistent between these views.

  39. 2 similar no-change frames10:00 AM–10:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:15 AM PT. The site continues to show a steady state, with no discernible shifts in the placement of machines or stockpiled materials.
      10:15 AM PT

      The site continues to show a steady state, with no discernible shifts in the placement of machines or stockpiled materials.

    2. Construction camera frame at 10:00 AM PT. The scene remains remarkably unchanged, with all visible machinery holding its prior positions.
      10:00 AM PT

      The scene remains remarkably unchanged, with all visible machinery holding its prior positions.

  40. Construction camera frame at 9:45 AM PT. The site remains in a holding pattern, with no readily apparent adjustments to the location of machinery or materials.
    9:45 AM PT

    The site remains in a holding pattern, with no readily apparent adjustments to the location of machinery or materials.

  41. Construction camera frame at 9:30 AM PT. The site presents a similar picture to fifteen minutes ago, with no significant changes in equipment placement or activity visible.
    9:30 AM PT

    The site presents a similar picture to fifteen minutes ago, with no significant changes in equipment placement or activity visible.

  42. Construction camera frame at 9:15 AM PT. The site appears largely as it was fifteen minutes ago, with no obvious repositioning of equipment or vehicles.
    9:15 AM PT

    The site appears largely as it was fifteen minutes ago, with no obvious repositioning of equipment or vehicles.

  43. Construction camera frame at 9:00 AM PT. The scene is remarkably consistent, showing no substantial movement of machinery or materials in the last quarter hour.
    9:00 AM PT

    The scene is remarkably consistent, showing no substantial movement of machinery or materials in the last quarter hour.

  44. 3 similar no-change frames8:15 AM–8:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:45 AM PT. The overall scene presents a static view, with the positions of equipment and materials appearing unchanged.
      8:45 AM PT

      The overall scene presents a static view, with the positions of equipment and materials appearing unchanged.

    2. Construction camera frame at 8:30 AM PT. The equipment layout is holding steady, with no discernible shifts in position across the site.
      8:30 AM PT

      The equipment layout is holding steady, with no discernible shifts in position across the site.

    3. Construction camera frame at 8:15 AM PT. The scene remains stable, with no noticeable alterations to the positions of equipment or vehicles over the last fifteen minutes.
      8:15 AM PT

      The scene remains stable, with no noticeable alterations to the positions of equipment or vehicles over the last fifteen minutes.

  45. Construction camera frame at 8:00 AM PT. The arrangement of the machinery across the site remains consistent, though one of the excavators near the center has subtly shifted its position.
    8:00 AM PT

    The arrangement of the machinery across the site remains consistent, though one of the excavators near the center has subtly shifted its position.

  46. Construction camera frame at 7:45 AM PT. A white box truck has entered the site from the driveway on the left side of the frame and is now positioned near the center. Otherwise, the arrangement of equipment and materials remains consistent.
    7:45 AM PT

    A white box truck has entered the site from the driveway on the left side of the frame and is now positioned near the center. Otherwise, the arrangement of equipment and materials remains consistent.

  47. Construction camera frame at 7:30 AM PT. The site appears largely unchanged, though a slight shift in the sunlight reveals more texture in the graded soil.
    7:30 AM PT

    The site appears largely unchanged, though a slight shift in the sunlight reveals more texture in the graded soil.

  48. Construction camera frame at 7:15 AM PT. Several trucks and a dark-colored loader are now visible along the service road on the right side of the frame, having appeared since the last view.
    7:15 AM PT

    Several trucks and a dark-colored loader are now visible along the service road on the right side of the frame, having appeared since the last view.

  49. Construction camera frame at 7:00 AM PT. The scene is remarkably still, with no apparent movement of equipment or vehicles in the last quarter hour.
    7:00 AM PT

    The scene is remarkably still, with no apparent movement of equipment or vehicles in the last quarter hour.

  50. Construction camera frame at 6:45 AM PT. A small red vehicle has appeared near the equipment in the southeast corner of the site. Beyond that, the positioning of machines and materials looks the same as it did moments ago.
    6:45 AM PT

    A small red vehicle has appeared near the equipment in the southeast corner of the site. Beyond that, the positioning of machines and materials looks the same as it did moments ago.

  51. Construction camera frame at 6:30 AM PT. The layout of machinery across the site is stable, though the light has subtly altered the appearance of the graded area.
    6:30 AM PT

    The layout of machinery across the site is stable, though the light has subtly altered the appearance of the graded area.

  52. 2 similar no-change frames6:00 AM–6:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:15 AM PT. The arrangement of equipment across the site remains consistent, with no observable shifts in position over the last fifteen minutes.
      6:15 AM PT

      The arrangement of equipment across the site remains consistent, with no observable shifts in position over the last fifteen minutes.

    2. Construction camera frame at 6:00 AM PT. The overall scene remains static, though the light has shifted slightly, making details a bit more distinct.
      6:00 AM PT

      The overall scene remains static, though the light has shifted slightly, making details a bit more distinct.

  53. Construction camera frame at 5:45 AM PT. The scene is brighter now, revealing several pieces of heavy equipment positioned across the graded area. Otherwise, the layout of the site remains consistent between the two views.
    5:45 AM PT

    The scene is brighter now, revealing several pieces of heavy equipment positioned across the graded area. Otherwise, the layout of the site remains consistent between the two views.

  54. 7 similar no-change frames12:00 AM–5:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:30 AM PT. The site appears largely unchanged, though some additional shapes are now visible within the center of the graded area. Visibility remains low, with city lights reflecting off the surface.
      5:30 AM PT

      The site appears largely unchanged, though some additional shapes are now visible within the center of the graded area. Visibility remains low, with city lights reflecting off the surface.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 3All daysAug 5 →