Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Saturday, August 15, 2026

Construction log

Saturday, August 15, 2026

68 snapshots from the live camera.


AI digest

The site was largely quiet, with heavy equipment holding nearly the same positions throughout the day; a few machines shifted slightly, and vehicles entered from the left driveway. Compared with August 8, the central cut is visibly larger, but there was no substantial change between today’s first and last frames.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. The scene is remarkably consistent, with equipment and materials holding their positions.
    8:30 PM PT

    The scene is remarkably consistent, with equipment and materials holding their positions.

  4. 4 similar no-change frames7:30 PM–8:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 PM PT. The site’s layout holds steady, with no apparent movement of equipment or materials in the last quarter of an hour.
      8:15 PM PT

      The site’s layout holds steady, with no apparent movement of equipment or materials in the last quarter of an hour.

    2. Construction camera frame at 8:00 PM PT. The site appears stable, with no noticeable changes in the positions of the machines or stockpiled materials.
      8:00 PM PT

      The site appears stable, with no noticeable changes in the positions of the machines or stockpiled materials.

    3. Construction camera frame at 7:45 PM PT. The site remains much as it was, with no discernible shifts in the placement of equipment or materials.
      7:45 PM PT

      The site remains much as it was, with no discernible shifts in the placement of equipment or materials.

    4. Construction camera frame at 7:30 PM PT. The scene presents a static view, with all visible equipment remaining in the same locations as before.
      7:30 PM PT

      The scene presents a static view, with all visible equipment remaining in the same locations as before.

  5. Construction camera frame at 7:15 PM PT. The site shows minimal alteration, as the positions of the machines and materials appear constant.
    7:15 PM PT

    The site shows minimal alteration, as the positions of the machines and materials appear constant.

  6. Construction camera frame at 7:00 PM PT. The arrangement of equipment on site looks virtually identical to the previous view.
    7:00 PM PT

    The arrangement of equipment on site looks virtually identical to the previous view.

  7. 4 similar no-change frames6:00 PM–6:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 PM PT. The scene is largely unchanged, with the arrangement of machinery and materials holding consistent across the site.
      6:45 PM PT

      The scene is largely unchanged, with the arrangement of machinery and materials holding consistent across the site.

    2. Construction camera frame at 6:30 PM PT. Equipment remains in largely the same positions, though a small excavator near the center has shifted slightly to the right.
      6:30 PM PT

      Equipment remains in largely the same positions, though a small excavator near the center has shifted slightly to the right.

    3. Construction camera frame at 6:15 PM PT. The construction area appears stable, with no apparent movement of machinery or materials in the last fifteen minutes.
      6:15 PM PT

      The construction area appears stable, with no apparent movement of machinery or materials in the last fifteen minutes.

    4. Construction camera frame at 6:00 PM PT. The site maintains a quiet state, with no discernible shifts in equipment or material placement over the last fifteen minutes.
      6:00 PM PT

      The site maintains a quiet state, with no discernible shifts in equipment or material placement over the last fifteen minutes.

  8. Construction camera frame at 5:45 PM PT. The view remains remarkably similar, with all equipment appearing to stay in the same locations.
    5:45 PM PT

    The view remains remarkably similar, with all equipment appearing to stay in the same locations.

  9. Construction camera frame at 5:30 PM PT. The site's appearance has held steady, with the placement of equipment remaining consistent over the last quarter hour.
    5:30 PM PT

    The site's appearance has held steady, with the placement of equipment remaining consistent over the last quarter hour.

  10. 4 similar no-change frames4:30 PM–5:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:15 PM PT. The construction site displays a consistent appearance, with no visible changes in equipment positioning or activity.
      5:15 PM PT

      The construction site displays a consistent appearance, with no visible changes in equipment positioning or activity.

    2. Construction camera frame at 5:00 PM PT. The site presents a largely unchanged view, with equipment holding its positions across the graded area.
      5:00 PM PT

      The site presents a largely unchanged view, with equipment holding its positions across the graded area.

    3. Construction camera frame at 4:45 PM PT. The scene is largely static, with the construction equipment remaining in the same positions as before.
      4:45 PM PT

      The scene is largely static, with the construction equipment remaining in the same positions as before.

    4. Construction camera frame at 4:30 PM PT. The equipment layout appears stable, with no apparent movement of machinery or materials in the last fifteen minutes.
      4:30 PM PT

      The equipment layout appears stable, with no apparent movement of machinery or materials in the last fifteen minutes.

  11. Construction camera frame at 4:15 PM PT. The site shows minimal alterations, with the machines appearing stationary between views.
    4:15 PM PT

    The site shows minimal alterations, with the machines appearing stationary between views.

  12. Construction camera frame at 4:00 PM PT. The view of the site remains consistent, with all visible machinery holding its place.
    4:00 PM PT

    The view of the site remains consistent, with all visible machinery holding its place.

  13. Construction camera frame at 3:45 PM PT. The arrangement of equipment on the site continues without noticeable shifts.
    3:45 PM PT

    The arrangement of equipment on the site continues without noticeable shifts.

  14. Construction camera frame at 3:30 PM PT. The site's machinery remains in largely the same arrangement as it was moments ago.
    3:30 PM PT

    The site's machinery remains in largely the same arrangement as it was moments ago.

  15. 2 similar no-change frames3:00 PM–3:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:15 PM PT. The site presents a largely unchanged view, with the machinery maintaining its positions from the previous check.
      3:15 PM PT

      The site presents a largely unchanged view, with the machinery maintaining its positions from the previous check.

    2. Construction camera frame at 3:00 PM PT. The scene shows little variation, as the machinery remains in the same locations as before.
      3:00 PM PT

      The scene shows little variation, as the machinery remains in the same locations as before.

  16. Construction camera frame at 2:45 PM PT. The equipment layout across the site appears stable, showing no obvious repositioning in the last quarter of an hour.
    2:45 PM PT

    The equipment layout across the site appears stable, showing no obvious repositioning in the last quarter of an hour.

  17. Construction camera frame at 2:30 PM PT. The scene remains remarkably still, with the equipment spread across the site holding its positions.
    2:30 PM PT

    The scene remains remarkably still, with the equipment spread across the site holding its positions.

  18. Construction camera frame at 2:15 PM PT. The site maintains a consistent appearance, with no apparent movement of equipment or materials.
    2:15 PM PT

    The site maintains a consistent appearance, with no apparent movement of equipment or materials.

  19. Construction camera frame at 2:00 PM PT. The arrangement of the heavy equipment across the site looks nearly identical to the previous view.
    2:00 PM PT

    The arrangement of the heavy equipment across the site looks nearly identical to the previous view.

  20. Construction camera frame at 1:45 PM PT. The equipment on site appears to be in largely the same arrangement as it was moments ago.
    1:45 PM PT

    The equipment on site appears to be in largely the same arrangement as it was moments ago.

  21. 5 similar no-change frames12:30 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The site’s machinery appears to be holding steady, with no discernible shifts in position.
      1:30 PM PT

      The site’s machinery appears to be holding steady, with no discernible shifts in position.

    2. Construction camera frame at 1:15 PM PT. The scene presents a familiar picture, with the arrangement of machinery appearing unchanged from the last view.
      1:15 PM PT

      The scene presents a familiar picture, with the arrangement of machinery appearing unchanged from the last view.

    3. Construction camera frame at 1:00 PM PT. The site shows no substantial changes, with equipment remaining in the same general locations.
      1:00 PM PT

      The site shows no substantial changes, with equipment remaining in the same general locations.

    4. Construction camera frame at 12:45 PM PT. The site’s equipment remains in the same positions as the previous view, showing no noticeable alterations.
      12:45 PM PT

      The site’s equipment remains in the same positions as the previous view, showing no noticeable alterations.

    5. Construction camera frame at 12:30 PM PT. The overall layout of the site remains static, with no apparent movement of equipment between views.
      12:30 PM PT

      The overall layout of the site remains static, with no apparent movement of equipment between views.

  22. Construction camera frame at 12:15 PM PT. The view is remarkably consistent, with the machinery maintaining the same general layout as before.
    12:15 PM PT

    The view is remarkably consistent, with the machinery maintaining the same general layout as before.

  23. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site appears stable, with all visible equipment holding its prior positions.
      12:00 PM PT

      The site appears stable, with all visible equipment holding its prior positions.

    2. Construction camera frame at 11:45 AM PT. The site remains largely as it was, with no discernible shifts in equipment positions.
      11:45 AM PT

      The site remains largely as it was, with no discernible shifts in equipment positions.

  24. Construction camera frame at 11:30 AM PT. The scene presents a consistent picture, with all visible machinery maintaining its prior positioning.
    11:30 AM PT

    The scene presents a consistent picture, with all visible machinery maintaining its prior positioning.

  25. 4 similar no-change frames10:30 AM–11:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:15 AM PT. The arrangement of equipment across the site appears unchanged from the last view.
      11:15 AM PT

      The arrangement of equipment across the site appears unchanged from the last view.

    2. Construction camera frame at 11:00 AM PT. The scene is nearly identical to the previous view, with equipment remaining in the same locations.
      11:00 AM PT

      The scene is nearly identical to the previous view, with equipment remaining in the same locations.

    3. Construction camera frame at 10:45 AM PT. The equipment on site holds its positions, presenting a generally static scene.
      10:45 AM PT

      The equipment on site holds its positions, presenting a generally static scene.

    4. Construction camera frame at 10:30 AM PT. NoSlightly differentC No visible movement or changes have occurred across the site.
      10:30 AM PT

      NoSlightly differentC No visible movement or changes have occurred across the site.

  26. Construction camera frame at 10:15 AM PT. A yellow machine has moved slightly closer to the center of the site since the last view.
    10:15 AM PT

    A yellow machine has moved slightly closer to the center of the site since the last view.

  27. Construction camera frame at 10:00 AM PT. The site remains remarkably still, with no obvious shifts in equipment or material placement.
    10:00 AM PT

    The site remains remarkably still, with no obvious shifts in equipment or material placement.

  28. Construction camera frame at 9:45 AM PT. A white pickup truck is now visible parked near the driveway on the left side of the frame.
    9:45 AM PT

    A white pickup truck is now visible parked near the driveway on the left side of the frame.

  29. Construction camera frame at 9:30 AM PT. The site appears largely unchanged, with the equipment maintaining its previous positions.
    9:30 AM PT

    The site appears largely unchanged, with the equipment maintaining its previous positions.

  30. Construction camera frame at 9:15 AM PT. The site’s configuration is much the same, though one of the excavators near the center has slightly altered its orientation.
    9:15 AM PT

    The site’s configuration is much the same, though one of the excavators near the center has slightly altered its orientation.

  31. Construction camera frame at 9:00 AM PT. The scene shows a similar arrangement of equipment as before, though a white vehicle has entered the site from the driveway on the left.
    9:00 AM PT

    The scene shows a similar arrangement of equipment as before, though a white vehicle has entered the site from the driveway on the left.

  32. Construction camera frame at 8:45 AM PT. The scene presents a familiar view, as the positions of the equipment and materials haven't shifted noticeably.
    8:45 AM PT

    The scene presents a familiar view, as the positions of the equipment and materials haven't shifted noticeably.

  33. Construction camera frame at 8:30 AM PT. The arrangement of the machines and materials on site appears to be holding steady.
    8:30 AM PT

    The arrangement of the machines and materials on site appears to be holding steady.

  34. Construction camera frame at 8:15 AM PT. The layout of the site remains consistent, with no visible repositioning of the heavy equipment or vehicles during the last fifteen minutes.
    8:15 AM PT

    The layout of the site remains consistent, with no visible repositioning of the heavy equipment or vehicles during the last fifteen minutes.

  35. 2 similar no-change frames7:45 AM–8:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 AM PT. The scene remains quite stable, with no discernible shifts in the positions of the machinery or materials.
      8:00 AM PT

      The scene remains quite stable, with no discernible shifts in the positions of the machinery or materials.

    2. Construction camera frame at 7:45 AM PT. The scene appears largely unaltered, with the machines and materials holding their positions from the previous view.
      7:45 AM PT

      The scene appears largely unaltered, with the machines and materials holding their positions from the previous view.

  36. Construction camera frame at 7:30 AM PT. The equipment across the site maintains the same locations as observed moments ago.
    7:30 AM PT

    The equipment across the site maintains the same locations as observed moments ago.

  37. Construction camera frame at 7:15 AM PT. The site holds a steady appearance, with the arrangement of equipment appearing unchanged over the last quarter hour.
    7:15 AM PT

    The site holds a steady appearance, with the arrangement of equipment appearing unchanged over the last quarter hour.

  38. Construction camera frame at 7:00 AM PT. A dark-colored vehicle has entered the site via the driveway on the left. Otherwise, the arrangement of equipment across the graded area remains consistent between the two views.
    7:00 AM PT

    A dark-colored vehicle has entered the site via the driveway on the left. Otherwise, the arrangement of equipment across the graded area remains consistent between the two views.

  39. 2 similar no-change frames6:30 AM–6:45 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:45 AM PT. The overall scene is remarkably consistent, with no apparent movement of equipment or vehicles in the last fifteen minutes.
      6:45 AM PT

      The overall scene is remarkably consistent, with no apparent movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 6:30 AM PT. The site presents a static view, with all visible machinery maintaining their previous positions.
      6:30 AM PT

      The site presents a static view, with all visible machinery maintaining their previous positions.

  40. Construction camera frame at 6:15 AM PT. The scene remains quite still, with equipment holding its positions across the site.
    6:15 AM PT

    The scene remains quite still, with equipment holding its positions across the site.

  41. 7 similar no-change frames12:00 AM–6:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 AM PT. Daylight reveals several pieces of heavy equipment are positioned across the graded area. The site appears largely unchanged from fifteen minutes ago, with machines remaining in the same locations.
      6:00 AM PT

      Daylight reveals several pieces of heavy equipment are positioned across the graded area. The site appears largely unchanged from fifteen minutes ago, with machines remaining in the same locations.

    2. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 14All daysAug 16 →