Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Sunday, August 16, 2026

Construction log

Sunday, August 16, 2026

67 snapshots from the live camera.


AI digest

The site was largely quiet, with machinery holding its positions through the day; a red vehicle entered from the left driveway and moved farther into the site. A small pile of material appeared near the center, but there was no clear broader change to the graded ground.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. The site’s arrangement of heavy equipment and stockpiled materials has not altered in the intervening fifteen minutes.
    8:30 PM PT

    The site’s arrangement of heavy equipment and stockpiled materials has not altered in the intervening fifteen minutes.

  4. 3 similar no-change frames7:45 PM–8:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 PM PT. The overall scene holds steady, with no discernible changes in equipment placement or site conditions over the last quarter hour.
      8:15 PM PT

      The overall scene holds steady, with no discernible changes in equipment placement or site conditions over the last quarter hour.

    2. Construction camera frame at 8:00 PM PT. A subtle shift in light reveals no alterations to the positioning of machinery or materials on the site.
      8:00 PM PT

      A subtle shift in light reveals no alterations to the positioning of machinery or materials on the site.

    3. Construction camera frame at 7:45 PM PT. The site presents a static view, with equipment maintaining its previous locations and no observable shifts in materials.
      7:45 PM PT

      The site presents a static view, with equipment maintaining its previous locations and no observable shifts in materials.

  5. Construction camera frame at 7:30 PM PT. The position of the yellow excavator near the center has shifted slightly to the south. Otherwise, the site’s arrangement of equipment and materials appears stable.
    7:30 PM PT

    The position of the yellow excavator near the center has shifted slightly to the south. Otherwise, the site’s arrangement of equipment and materials appears stable.

  6. 3 similar no-change frames6:45 PM–7:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 7:15 PM PT. The scene appears largely unchanged, though the sunlight has shifted slightly across the graded area.
      7:15 PM PT

      The scene appears largely unchanged, though the sunlight has shifted slightly across the graded area.

    2. Construction camera frame at 7:00 PM PT. The layout of equipment across the site remains consistent, with no apparent movement in the last fifteen minutes.
      7:00 PM PT

      The layout of equipment across the site remains consistent, with no apparent movement in the last fifteen minutes.

    3. Construction camera frame at 6:45 PM PT. The scene remains quite still, with no significant alterations to the equipment positions or material layout since the last check.
      6:45 PM PT

      The scene remains quite still, with no significant alterations to the equipment positions or material layout since the last check.

  7. Construction camera frame at 6:30 PM PT. The equipment on site holds its positions, though a small pile of material has appeared near the center of the graded area.
    6:30 PM PT

    The equipment on site holds its positions, though a small pile of material has appeared near the center of the graded area.

  8. Construction camera frame at 6:15 PM PT. A red truck is now positioned further into the site, having entered through the driveway on the left. The rest of the equipment appears to hold its place.
    6:15 PM PT

    A red truck is now positioned further into the site, having entered through the driveway on the left. The rest of the equipment appears to hold its place.

  9. 3 similar no-change frames5:30 PM–6:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:00 PM PT. The scene presents a familiar view, with all visible equipment remaining in the same locations as before.
      6:00 PM PT

      The scene presents a familiar view, with all visible equipment remaining in the same locations as before.

    2. Construction camera frame at 5:45 PM PT. The arrangement of the heavy equipment across the site appears stable, with no noticeable shifts in position over the last quarter of an hour.
      5:45 PM PT

      The arrangement of the heavy equipment across the site appears stable, with no noticeable shifts in position over the last quarter of an hour.

    3. Construction camera frame at 5:30 PM PT. The site appears largely unchanged, with equipment maintaining its positions from fifteen minutes ago.
      5:30 PM PT

      The site appears largely unchanged, with equipment maintaining its positions from fifteen minutes ago.

  10. Construction camera frame at 5:15 PM PT. The overall layout of the site remains consistent, though one of the excavators near the center has slightly shifted its orientation.
    5:15 PM PT

    The overall layout of the site remains consistent, though one of the excavators near the center has slightly shifted its orientation.

  11. Construction camera frame at 5:00 PM PT. The scene remains largely static, with no apparent movement of machinery or vehicles over the last fifteen minutes.
    5:00 PM PT

    The scene remains largely static, with no apparent movement of machinery or vehicles over the last fifteen minutes.

  12. Construction camera frame at 4:45 PM PT. A red vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment across the graded area remains as it was.
    4:45 PM PT

    A red vehicle has entered the site via the driveway on the left side of the frame. Otherwise, the arrangement of equipment across the graded area remains as it was.

  13. Construction camera frame at 4:30 PM PT. The site maintains its current configuration, with all visible machinery standing in the same positions.
    4:30 PM PT

    The site maintains its current configuration, with all visible machinery standing in the same positions.

  14. 4 similar no-change frames3:15 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The view of the site shows no movement of equipment or vehicles in the last fifteen minutes.
      4:00 PM PT

      The view of the site shows no movement of equipment or vehicles in the last fifteen minutes.

    2. Construction camera frame at 3:45 PM PT. The arrangement of machinery across the site remains consistent, with no observable shifts in position during the last fifteen minutes.
      3:45 PM PT

      The arrangement of machinery across the site remains consistent, with no observable shifts in position during the last fifteen minutes.

    3. Construction camera frame at 3:30 PM PT. The site appears unchanged, with all visible equipment remaining in the same locations as before.
      3:30 PM PT

      The site appears unchanged, with all visible equipment remaining in the same locations as before.

    4. Construction camera frame at 3:15 PM PT. The equipment on site holds steady, with no discernible changes in position over the last quarter hour.
      3:15 PM PT

      The equipment on site holds steady, with no discernible changes in position over the last quarter hour.

  15. Construction camera frame at 3:00 PM PT. The scene remains remarkably consistent, with the equipment holding its positions on the graded area.
    3:00 PM PT

    The scene remains remarkably consistent, with the equipment holding its positions on the graded area.

  16. Construction camera frame at 2:45 PM PT. The scene presents a stable picture, with the machinery maintaining its previous locations across the site.
    2:45 PM PT

    The scene presents a stable picture, with the machinery maintaining its previous locations across the site.

  17. 5 similar no-change frames1:30 PM–2:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:30 PM PT. The site's equipment remains in the same positions, with no apparent alterations to the scene.
      2:30 PM PT

      The site's equipment remains in the same positions, with no apparent alterations to the scene.

    2. Construction camera frame at 2:15 PM PT. The site’s machinery continues in the same positions, showing no movement in the last fifteen minutes.
      2:15 PM PT

      The site’s machinery continues in the same positions, showing no movement in the last fifteen minutes.

    3. Construction camera frame at 2:00 PM PT. The arrangement of machinery on the site is largely static, with no obvious repositioning in the latest view.
      2:00 PM PT

      The arrangement of machinery on the site is largely static, with no obvious repositioning in the latest view.

    4. Construction camera frame at 1:45 PM PT. The site appears unchanged, as the positioning of the equipment and materials remains consistent between the two views.
      1:45 PM PT

      The site appears unchanged, as the positioning of the equipment and materials remains consistent between the two views.

    5. Construction camera frame at 1:30 PM PT. The overall layout of the site remains consistent, with no discernible shifts in the positions of the heavy equipment.
      1:30 PM PT

      The overall layout of the site remains consistent, with no discernible shifts in the positions of the heavy equipment.

  18. Construction camera frame at 1:15 PM PT. The site maintains its current configuration, with the machines appearing stationary in the same locations.
    1:15 PM PT

    The site maintains its current configuration, with the machines appearing stationary in the same locations.

  19. Construction camera frame at 1:00 PM PT. Equipment positions across the site are holding, with no noticeable changes in placement over the last quarter hour.
    1:00 PM PT

    Equipment positions across the site are holding, with no noticeable changes in placement over the last quarter hour.

  20. Construction camera frame at 12:45 PM PT. The site’s arrangement of equipment and materials seems to have held steady over the last fifteen minutes.
    12:45 PM PT

    The site’s arrangement of equipment and materials seems to have held steady over the last fifteen minutes.

  21. Construction camera frame at 12:30 PM PT. The scene is remarkably still, with no immediately apparent movement of equipment or materials.
    12:30 PM PT

    The scene is remarkably still, with no immediately apparent movement of equipment or materials.

  22. Construction camera frame at 12:15 PM PT. The site presents a stable picture, with no clear repositioning of equipment or materials in the last fifteen minutes.
    12:15 PM PT

    The site presents a stable picture, with no clear repositioning of equipment or materials in the last fifteen minutes.

  23. Construction camera frame at 12:00 PM PT. The site appears unchanged, with all visible machinery remaining in the same positions as before.
    12:00 PM PT

    The site appears unchanged, with all visible machinery remaining in the same positions as before.

  24. Construction camera frame at 11:45 AM PT. The overall layout of the site remains consistent, with the machines appearing in the same general areas as before.
    11:45 AM PT

    The overall layout of the site remains consistent, with the machines appearing in the same general areas as before.

  25. 3 similar no-change frames11:00 AM–11:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 11:30 AM PT. The site shows no discernible shifts in the placement of machinery or materials over the past fifteen minutes.
      11:30 AM PT

      The site shows no discernible shifts in the placement of machinery or materials over the past fifteen minutes.

    2. Construction camera frame at 11:15 AM PT. Equipment positions across the site appear largely unaltered during the last fifteen minutes.
      11:15 AM PT

      Equipment positions across the site appear largely unaltered during the last fifteen minutes.

    3. Construction camera frame at 11:00 AM PT. The view is holding steady, with no noticeable changes to the positions of the machines or materials on the site.
      11:00 AM PT

      The view is holding steady, with no noticeable changes to the positions of the machines or materials on the site.

  26. Construction camera frame at 10:45 AM PT. The site maintains a consistent appearance, with no readily apparent movement of equipment or materials over the last quarter hour.
    10:45 AM PT

    The site maintains a consistent appearance, with no readily apparent movement of equipment or materials over the last quarter hour.

  27. 3 similar no-change frames10:00 AM–10:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:30 AM PT. The scene appears static, with all visible equipment maintaining its prior location.
      10:30 AM PT

      The scene appears static, with all visible equipment maintaining its prior location.

    2. Construction camera frame at 10:15 AM PT. The scene presents a largely unchanged view, with equipment holding its positions across the site.
      10:15 AM PT

      The scene presents a largely unchanged view, with equipment holding its positions across the site.

    3. Construction camera frame at 10:00 AM PT. The layout of equipment on the site remains stable, with no significant shifts in position visible in the last fifteen minutes.
      10:00 AM PT

      The layout of equipment on the site remains stable, with no significant shifts in position visible in the last fifteen minutes.

  28. Construction camera frame at 9:45 AM PT. The arrangement of machinery on site is nearly identical to the previous view, though the excavator closest to the lower-right corner seems to have rotated slightly.
    9:45 AM PT

    The arrangement of machinery on site is nearly identical to the previous view, though the excavator closest to the lower-right corner seems to have rotated slightly.

  29. Construction camera frame at 9:30 AM PT. The scene remains remarkably consistent, with the positions of machines and materials appearing virtually identical to the previous view.
    9:30 AM PT

    The scene remains remarkably consistent, with the positions of machines and materials appearing virtually identical to the previous view.

  30. 7 similar no-change frames7:45 AM–9:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:15 AM PT. Equipment remains in largely the same positions, though one of the excavators near the center of the site appears to have shifted slightly.
      9:15 AM PT

      Equipment remains in largely the same positions, though one of the excavators near the center of the site appears to have shifted slightly.

    2. Construction camera frame at 9:00 AM PT. The site continues to display a consistent arrangement of equipment, with no noticeable changes in the last quarter hour.
      9:00 AM PT

      The site continues to display a consistent arrangement of equipment, with no noticeable changes in the last quarter hour.

    3. Construction camera frame at 8:45 AM PT. The scene holds steady, showing no alterations in equipment placement or vehicle traffic over the past fifteen minutes.
      8:45 AM PT

      The scene holds steady, showing no alterations in equipment placement or vehicle traffic over the past fifteen minutes.

    4. Construction camera frame at 8:30 AM PT. The site appears unchanged, with all visible machines holding their positions from the earlier view.
      8:30 AM PT

      The site appears unchanged, with all visible machines holding their positions from the earlier view.

    5. Construction camera frame at 8:15 AM PT. The site presents a static view, with all visible equipment remaining in the same locations as before.
      8:15 AM PT

      The site presents a static view, with all visible equipment remaining in the same locations as before.

    6. Construction camera frame at 8:00 AM PT. The arrangement of machinery across the site appears fixed, with no discernible shifts in position over the last fifteen minutes.
      8:00 AM PT

      The arrangement of machinery across the site appears fixed, with no discernible shifts in position over the last fifteen minutes.

    7. Construction camera frame at 7:45 AM PT. The scene remains quite still, with no apparent movement of machinery or vehicles during the last fifteen minutes.
      7:45 AM PT

      The scene remains quite still, with no apparent movement of machinery or vehicles during the last fifteen minutes.

  31. Construction camera frame at 7:30 AM PT. A small red structure has appeared near the driveway on the left side of the frame. Otherwise, the site maintains the same arrangement of equipment and materials as it did moments ago.
    7:30 AM PT

    A small red structure has appeared near the driveway on the left side of the frame. Otherwise, the site maintains the same arrangement of equipment and materials as it did moments ago.

  32. Construction camera frame at 7:15 AM PT. Equipment positions appear stable, and no vehicles have moved on or off the site in the last quarter of an hour.
    7:15 AM PT

    Equipment positions appear stable, and no vehicles have moved on or off the site in the last quarter of an hour.

  33. Construction camera frame at 7:00 AM PT. The scene appears largely unaltered, with the same equipment distributed across the site as in the previous view.
    7:00 AM PT

    The scene appears largely unaltered, with the same equipment distributed across the site as in the previous view.

  34. Construction camera frame at 6:45 AM PT. The view across the site remains remarkably consistent, with equipment holding its positions and no vehicles entering or leaving.
    6:45 AM PT

    The view across the site remains remarkably consistent, with equipment holding its positions and no vehicles entering or leaving.

  35. 9 similar no-change frames12:00 AM–6:30 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 AM PT. The site presents a similar view as before, with no noticeable changes in the positions of equipment or vehicles.
      6:30 AM PT

      The site presents a similar view as before, with no noticeable changes in the positions of equipment or vehicles.

    2. Construction camera frame at 6:15 AM PT. The arrangement of equipment across the site appears static, with no discernible shifts in position over the last fifteen minutes.
      6:15 AM PT

      The arrangement of equipment across the site appears static, with no discernible shifts in position over the last fifteen minutes.

    3. Construction camera frame at 6:00 AM PT. Daylight reveals several pieces of machinery now visible across the site, including what appears to be a tracked vehicle near the center. The scene remains largely unchanged from a few minutes ago, with no apparent movement of equipment or vehicles.
      6:00 AM PT

      Daylight reveals several pieces of machinery now visible across the site, including what appears to be a tracked vehicle near the center. The scene remains largely unchanged from a few minutes ago, with no apparent movement of equipment or vehicles.

    4. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    7. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    8. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    9. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 15All daysAug 17 →