Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Tuesday, August 18, 2026

Construction log

Tuesday, August 18, 2026

68 snapshots from the live camera.


AI digest

The site remained largely quiet, with heavy equipment holding its positions and only minor adjustments noted. Compared with August 11, the central ground appears more uneven, with darker disturbed patches in the lower area; a red container was also visible in the southwest, but no substantial change occurred during the day.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. The arrangement of machines appears stable, though the lighting has shifted slightly over the past fifteen minutes.
    8:30 PM PT

    The arrangement of machines appears stable, though the lighting has shifted slightly over the past fifteen minutes.

  4. Construction camera frame at 8:15 PM PT. Equipment positions are holding, and no new vehicles have entered or exited the site in the last quarter of an hour.
    8:15 PM PT

    Equipment positions are holding, and no new vehicles have entered or exited the site in the last quarter of an hour.

  5. 8 similar no-change frames6:15 PM–8:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:00 PM PT. The site appears remarkably consistent, with no discernible alterations in equipment placement or activity during these fifteen minutes.
      8:00 PM PT

      The site appears remarkably consistent, with no discernible alterations in equipment placement or activity during these fifteen minutes.

    2. Construction camera frame at 7:45 PM PT. The overall scene is holding steady, with equipment appearing in the same locations as before.
      7:45 PM PT

      The overall scene is holding steady, with equipment appearing in the same locations as before.

    3. Construction camera frame at 7:30 PM PT. The site remains largely unchanged, showing a consistent arrangement of machinery and materials.
      7:30 PM PT

      The site remains largely unchanged, showing a consistent arrangement of machinery and materials.

    4. Construction camera frame at 7:15 PM PT. The site presents a similar picture to the last check-in, with no apparent movement of equipment or vehicles.
      7:15 PM PT

      The site presents a similar picture to the last check-in, with no apparent movement of equipment or vehicles.

    5. Construction camera frame at 7:00 PM PT. The scene shows a quiet interval, with the arrangement of equipment appearing largely static.
      7:00 PM PT

      The scene shows a quiet interval, with the arrangement of equipment appearing largely static.

    6. Construction camera frame at 6:45 PM PT. The arrangement of machinery across the site remains quite stable, with no noticeable shifts in position during this period.
      6:45 PM PT

      The arrangement of machinery across the site remains quite stable, with no noticeable shifts in position during this period.

    7. Construction camera frame at 6:30 PM PT. Equipment remains in largely the same positions, though one of the excavators near the lower-left corner has shifted slightly.
      6:30 PM PT

      Equipment remains in largely the same positions, though one of the excavators near the lower-left corner has shifted slightly.

    8. Construction camera frame at 6:15 PM PT. The layout of the site appears consistent, with no observable alterations in equipment placement during this interval.
      6:15 PM PT

      The layout of the site appears consistent, with no observable alterations in equipment placement during this interval.

  6. Construction camera frame at 6:00 PM PT. A small white truck has entered the site via the driveway on the left, and is now positioned near the center of the graded area.
    6:00 PM PT

    A small white truck has entered the site via the driveway on the left, and is now positioned near the center of the graded area.

  7. 2 similar no-change frames5:30 PM–5:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:45 PM PT. The scene is largely unchanged, with equipment maintaining its previous positions across the site.
      5:45 PM PT

      The scene is largely unchanged, with equipment maintaining its previous positions across the site.

    2. Construction camera frame at 5:30 PM PT. The site presents a similar view as before, with no significant changes to the positioning of equipment or materials.
      5:30 PM PT

      The site presents a similar view as before, with no significant changes to the positioning of equipment or materials.

  8. Construction camera frame at 5:15 PM PT. The site holds steady, with no readily apparent movement of equipment or materials over the last fifteen minutes.
    5:15 PM PT

    The site holds steady, with no readily apparent movement of equipment or materials over the last fifteen minutes.

  9. Construction camera frame at 5:00 PM PT. The overall layout of the site remains consistent, though shadows have shifted across the graded area.
    5:00 PM PT

    The overall layout of the site remains consistent, though shadows have shifted across the graded area.

  10. Construction camera frame at 4:45 PM PT. The scene remains remarkably static, with no noticeable shifts in the positions of machinery or materials.
    4:45 PM PT

    The scene remains remarkably static, with no noticeable shifts in the positions of machinery or materials.

  11. Construction camera frame at 4:30 PM PT. The site appears stable, with the locations of the tracked machines and other equipment holding consistent.
    4:30 PM PT

    The site appears stable, with the locations of the tracked machines and other equipment holding consistent.

  12. Construction camera frame at 4:15 PM PT. The site shows minimal alteration, with the positions of the larger machines remaining consistent.
    4:15 PM PT

    The site shows minimal alteration, with the positions of the larger machines remaining consistent.

  13. 2 similar no-change frames3:45 PM–4:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 4:00 PM PT. The arrangement of equipment appears largely unchanged, though a small white pickup has moved slightly further into the site from the driveway on the left.
      4:00 PM PT

      The arrangement of equipment appears largely unchanged, though a small white pickup has moved slightly further into the site from the driveway on the left.

    2. Construction camera frame at 3:45 PM PT. The site presents a nearly identical view, with no visible alterations in the placement of equipment or materials.
      3:45 PM PT

      The site presents a nearly identical view, with no visible alterations in the placement of equipment or materials.

  14. Construction camera frame at 3:30 PM PT. Equipment positions across the site are almost identical, though one of the excavators near the lower-left corner appears to have rotated slightly.
    3:30 PM PT

    Equipment positions across the site are almost identical, though one of the excavators near the lower-left corner appears to have rotated slightly.

  15. Construction camera frame at 3:15 PM PT. A small, dark-colored vehicle has moved from the upper-center to the lower-center of the site.
    3:15 PM PT

    A small, dark-colored vehicle has moved from the upper-center to the lower-center of the site.

  16. Construction camera frame at 3:00 PM PT. The overall scene is holding steady, with the arrangement of heavy equipment appearing consistent between views.
    3:00 PM PT

    The overall scene is holding steady, with the arrangement of heavy equipment appearing consistent between views.

  17. 3 similar no-change frames2:15 PM–2:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:45 PM PT. The scene remains remarkably stable, with no discernible shifts in equipment locations.
      2:45 PM PT

      The scene remains remarkably stable, with no discernible shifts in equipment locations.

    2. Construction camera frame at 2:30 PM PT. The placement of machinery remains largely static, though a small white vehicle has shifted position within the central area of the site.
      2:30 PM PT

      The placement of machinery remains largely static, though a small white vehicle has shifted position within the central area of the site.

    3. Construction camera frame at 2:15 PM PT. The site appears unchanged, with all equipment remaining in the same positions as the prior view.
      2:15 PM PT

      The site appears unchanged, with all equipment remaining in the same positions as the prior view.

  18. Construction camera frame at 2:00 PM PT. The layout of the equipment across the site is nearly identical to the previous view.
    2:00 PM PT

    The layout of the equipment across the site is nearly identical to the previous view.

  19. Construction camera frame at 1:45 PM PT. A white truck has entered the site from the driveway on the left and is positioned near the center.
    1:45 PM PT

    A white truck has entered the site from the driveway on the left and is positioned near the center.

  20. Construction camera frame at 1:30 PM PT. A small, yellow vehicle has moved from the northeast corner to the eastern edge, closer to the center of the site.
    1:30 PM PT

    A small, yellow vehicle has moved from the northeast corner to the eastern edge, closer to the center of the site.

  21. 3 similar no-change frames12:45 PM–1:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:15 PM PT. Equipment positions are consistent between these views, with no apparent movement of the larger machines.
      1:15 PM PT

      Equipment positions are consistent between these views, with no apparent movement of the larger machines.

    2. Construction camera frame at 1:00 PM PT. The view is almost the same as before, with no noticeable shifts in equipment placement across the site.
      1:00 PM PT

      The view is almost the same as before, with no noticeable shifts in equipment placement across the site.

    3. Construction camera frame at 12:45 PM PT. The scene remains remarkably static, with no discernible movement of equipment or vehicles in the last fifteen minutes.
      12:45 PM PT

      The scene remains remarkably static, with no discernible movement of equipment or vehicles in the last fifteen minutes.

  22. Construction camera frame at 12:30 PM PT. The site appears largely unchanged, although the shadows cast by the equipment have lengthened a bit.
    12:30 PM PT

    The site appears largely unchanged, although the shadows cast by the equipment have lengthened a bit.

  23. 2 similar no-change frames12:00 PM–12:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:15 PM PT. The equipment across the site remains in largely the same positions, though a small yellow machine has shifted slightly towards the eastern edge.
      12:15 PM PT

      The equipment across the site remains in largely the same positions, though a small yellow machine has shifted slightly towards the eastern edge.

    2. Construction camera frame at 12:00 PM PT. The scene presents a nearly identical view, with equipment remaining in the same locations as before.
      12:00 PM PT

      The scene presents a nearly identical view, with equipment remaining in the same locations as before.

  24. Construction camera frame at 11:45 AM PT. The arrangement of machinery across the site appears stable, with no obvious repositioning of equipment during this period.
    11:45 AM PT

    The arrangement of machinery across the site appears stable, with no obvious repositioning of equipment during this period.

  25. Construction camera frame at 11:30 AM PT. The equipment arrangement appears consistent between these views, with only minor changes in shadow patterns.
    11:30 AM PT

    The equipment arrangement appears consistent between these views, with only minor changes in shadow patterns.

  26. Construction camera frame at 11:15 AM PT. Everything on site maintains its prior arrangement, though shadows have shifted slightly with the sun's movement.
    11:15 AM PT

    Everything on site maintains its prior arrangement, though shadows have shifted slightly with the sun's movement.

  27. Construction camera frame at 11:00 AM PT. A small blue vehicle has entered the site via the driveway on the left, and is now positioned near the center.
    11:00 AM PT

    A small blue vehicle has entered the site via the driveway on the left, and is now positioned near the center.

  28. Construction camera frame at 10:45 AM PT. The scene is remarkably similar to the prior view, with the machines and materials appearing unmoved.
    10:45 AM PT

    The scene is remarkably similar to the prior view, with the machines and materials appearing unmoved.

  29. Construction camera frame at 10:30 AM PT. The site remains largely as it was, with the machines and materials holding their positions.
    10:30 AM PT

    The site remains largely as it was, with the machines and materials holding their positions.

  30. Construction camera frame at 10:15 AM PT. The layout of equipment on site is holding steady, with no discernible shifts in position during this interval.
    10:15 AM PT

    The layout of equipment on site is holding steady, with no discernible shifts in position during this interval.

  31. Construction camera frame at 10:00 AM PT. A red container has appeared in the southwest portion of the site, near the existing palletized materials.
    10:00 AM PT

    A red container has appeared in the southwest portion of the site, near the existing palletized materials.

  32. Construction camera frame at 9:45 AM PT. The site appears unchanged, with all equipment holding its previous positions.
    9:45 AM PT

    The site appears unchanged, with all equipment holding its previous positions.

  33. Construction camera frame at 9:30 AM PT. The site maintains a consistent appearance, with no obvious changes to the positions of the machines or materials.
    9:30 AM PT

    The site maintains a consistent appearance, with no obvious changes to the positions of the machines or materials.

  34. Construction camera frame at 9:15 AM PT. The site presents a static view, with equipment remaining in the same locations as before.
    9:15 AM PT

    The site presents a static view, with equipment remaining in the same locations as before.

  35. Construction camera frame at 9:00 AM PT. The scene is remarkably still, with the machinery holding its positions and no clear alterations to the site layout.
    9:00 AM PT

    The scene is remarkably still, with the machinery holding its positions and no clear alterations to the site layout.

  36. Construction camera frame at 8:45 AM PT. The arrangement of machinery across the site remains consistent, showing no noticeable movement in this interval.
    8:45 AM PT

    The arrangement of machinery across the site remains consistent, showing no noticeable movement in this interval.

  37. Construction camera frame at 8:30 AM PT. A slight adjustment is visible as one of the excavators near the center of the site has rotated its boom.
    8:30 AM PT

    A slight adjustment is visible as one of the excavators near the center of the site has rotated its boom.

  38. 2 similar no-change frames8:00 AM–8:15 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 AM PT. The equipment layout remains steady, with no discernible shifts in position between these views.
      8:15 AM PT

      The equipment layout remains steady, with no discernible shifts in position between these views.

    2. Construction camera frame at 8:00 AM PT. The scene appears largely unchanged, with the machines holding their positions across the site.
      8:00 AM PT

      The scene appears largely unchanged, with the machines holding their positions across the site.

  39. Construction camera frame at 7:45 AM PT. The site continues to show a consistent layout, with no apparent repositioning of the machines or materials.
    7:45 AM PT

    The site continues to show a consistent layout, with no apparent repositioning of the machines or materials.

  40. Construction camera frame at 7:30 AM PT. The site presents a familiar view, with the equipment maintaining its scattered arrangement across the graded area.
    7:30 AM PT

    The site presents a familiar view, with the equipment maintaining its scattered arrangement across the graded area.

  41. Construction camera frame at 7:15 AM PT. The site presents a largely static picture, with the positioning of equipment remaining consistent across both views.
    7:15 AM PT

    The site presents a largely static picture, with the positioning of equipment remaining consistent across both views.

  42. Construction camera frame at 7:00 AM PT. The overall scene remains quite similar, with the same pattern of machinery visible across the graded area.
    7:00 AM PT

    The overall scene remains quite similar, with the same pattern of machinery visible across the graded area.

  43. Construction camera frame at 6:45 AM PT. The arrangement of equipment across the site appears stable, with no noticeable movement in this recent check.
    6:45 AM PT

    The arrangement of equipment across the site appears stable, with no noticeable movement in this recent check.

  44. Construction camera frame at 6:30 AM PT. The site remains in a quiet state, with the arrangement of equipment appearing consistent between the two views.
    6:30 AM PT

    The site remains in a quiet state, with the arrangement of equipment appearing consistent between the two views.

  45. Construction camera frame at 6:15 AM PT. The scene appears largely unchanged; equipment remains scattered across the graded area, with no obvious shifts in position.
    6:15 AM PT

    The scene appears largely unchanged; equipment remains scattered across the graded area, with no obvious shifts in position.

  46. Construction camera frame at 6:00 AM PT. Daylight has returned, revealing several pieces of heavy equipment now visible across the site. The area remains largely flat and graded, with machines positioned throughout the central space and along the edges.
    6:00 AM PT

    Daylight has returned, revealing several pieces of heavy equipment now visible across the site. The area remains largely flat and graded, with machines positioned throughout the central space and along the edges.

  47. 6 similar no-change frames12:00 AM–5:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 17All daysAug 19 →