Skip to content
606Onni 606 · Bellevue
  • Live
  • Progress
  • Project
  • History
  • Search
606

606 (& 620) 106th Ave NE, Bellevue, WA

An independent guide to the Onni 606 development.

For the wider city, visit bellevue.wiki ↗

Project

  • Overview
  • Live cam
  • Latest progress
  • Construction log
  • News
  • Permit ledger
  • Construction impacts
  • The Towers
  • Skyline & height
  • Timeline
  • Gallery

Context

  • History of the block
  • Location
  • Developer

Help

  • Search the site
  • FAQ
  • Glossary
  • Sources & press
  • Contact
  • Updates feed
  • Sitemap

This is an independent, informational fan site. It is not affiliated with, sponsored by, or endorsed by Onni Group. Figures are compiled from public reporting and are approximate and subject to change. Project names and trademarks belong to their respective owners.

© 2026 onni606.com — built by an enthusiast.

  1. Home
  2. /Construction log
  3. /Wednesday, August 19, 2026

Construction log

Wednesday, August 19, 2026

67 snapshots from the live camera.


AI digest

The site was largely quiet, with heavy equipment and stockpiles staying in place; small vehicles shifted around and several vans and trucks entered during the day. Compared with August 12, the broad graded areas and central cut look much the same, with no substantial change visible.

▶ Play this day as a timelapse
  1. Construction camera frame at 11:00 PM PT. No construction activity — the site is quiet.
    11:00 PM PT

    No construction activity — the site is quiet.

  2. 2 similar no-change frames9:00 PM–10:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 10:00 PM PT. No construction activity — the site is quiet.
      10:00 PM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 9:00 PM PT. No construction activity — the site is quiet.
      9:00 PM PT

      No construction activity — the site is quiet.

  3. Construction camera frame at 8:30 PM PT. A red vehicle is now visible near the center of the site, having entered from the left side during the interval. Otherwise, the arrangement of equipment and materials appears consistent with the previous view.
    8:30 PM PT

    A red vehicle is now visible near the center of the site, having entered from the left side during the interval. Otherwise, the arrangement of equipment and materials appears consistent with the previous view.

  4. 4 similar no-change frames7:30 PM–8:15 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 8:15 PM PT. The site presents a largely unchanged view, with equipment remaining in the same positions as fifteen minutes ago.
      8:15 PM PT

      The site presents a largely unchanged view, with equipment remaining in the same positions as fifteen minutes ago.

    2. Construction camera frame at 8:00 PM PT. The scene holds a quiet stillness, with no discernible shifts in equipment positions or activity across the site.
      8:00 PM PT

      The scene holds a quiet stillness, with no discernible shifts in equipment positions or activity across the site.

    3. Construction camera frame at 7:45 PM PT. The overall scene appears static, though a dark-colored vehicle has entered the site via the driveway on the left.
      7:45 PM PT

      The overall scene appears static, though a dark-colored vehicle has entered the site via the driveway on the left.

    4. Construction camera frame at 7:30 PM PT. A small yellow machine has shifted position near the right edge of the frame. Otherwise, the scene remains stable, with the larger equipment and material stockpiles appearing unchanged.
      7:30 PM PT

      A small yellow machine has shifted position near the right edge of the frame. Otherwise, the scene remains stable, with the larger equipment and material stockpiles appearing unchanged.

  5. Construction camera frame at 7:15 PM PT. The equipment arrangement on the graded area looks virtually identical to the previous view.
    7:15 PM PT

    The equipment arrangement on the graded area looks virtually identical to the previous view.

  6. Construction camera frame at 6:45 PM PT. Activity on the site appears minimal, with the positions of machines and stockpiles holding steady.
    6:45 PM PT

    Activity on the site appears minimal, with the positions of machines and stockpiles holding steady.

  7. 3 similar no-change frames6:00 PM–6:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 6:30 PM PT. The view remains remarkably consistent, with no apparent movement of equipment or materials in the last quarter of an hour.
      6:30 PM PT

      The view remains remarkably consistent, with no apparent movement of equipment or materials in the last quarter of an hour.

    2. Construction camera frame at 6:15 PM PT. The site presents a largely unchanged view, with all visible equipment and materials remaining in the same locations.
      6:15 PM PT

      The site presents a largely unchanged view, with all visible equipment and materials remaining in the same locations.

    3. Construction camera frame at 6:00 PM PT. No discernible changes occurred on the site between these views.
      6:00 PM PT

      No discernible changes occurred on the site between these views.

  8. Construction camera frame at 5:45 PM PT. The graded area appears much the same as it did moments ago, with equipment and stockpiles holding their positions.
    5:45 PM PT

    The graded area appears much the same as it did moments ago, with equipment and stockpiles holding their positions.

  9. Construction camera frame at 5:30 PM PT. The scene appears static, with no visible shifts in the placement of equipment or materials over the last fifteen minutes.
    5:30 PM PT

    The scene appears static, with no visible shifts in the placement of equipment or materials over the last fifteen minutes.

  10. Construction camera frame at 5:15 PM PT. The arrangement of equipment and materials remains consistent between these views.
    5:15 PM PT

    The arrangement of equipment and materials remains consistent between these views.

  11. Construction camera frame at 5:00 PM PT. Shadows have lengthened across the graded area, but the equipment and materials remain in the same positions.
    5:00 PM PT

    Shadows have lengthened across the graded area, but the equipment and materials remain in the same positions.

  12. Construction camera frame at 4:45 PM PT. Everything on site maintains its position from the previous view.
    4:45 PM PT

    Everything on site maintains its position from the previous view.

  13. Construction camera frame at 4:30 PM PT. The positions of the machines and stockpiled material appear unchanged during the last fifteen minutes.
    4:30 PM PT

    The positions of the machines and stockpiled material appear unchanged during the last fifteen minutes.

  14. Construction camera frame at 4:15 PM PT. The site shows no noticeable differences in equipment placement or material arrangement over the last fifteen minutes.
    4:15 PM PT

    The site shows no noticeable differences in equipment placement or material arrangement over the last fifteen minutes.

  15. Construction camera frame at 4:00 PM PT. The equipment arrangement across the site has not altered in the last quarter hour.
    4:00 PM PT

    The equipment arrangement across the site has not altered in the last quarter hour.

  16. 2 similar no-change frames3:30 PM–3:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 3:45 PM PT. The site appears static, with no discernible shifts in equipment positioning or material stockpiles during this interval.
      3:45 PM PT

      The site appears static, with no discernible shifts in equipment positioning or material stockpiles during this interval.

    2. Construction camera frame at 3:30 PM PT. The site presents a stable picture, with all visible equipment remaining in the same locations.
      3:30 PM PT

      The site presents a stable picture, with all visible equipment remaining in the same locations.

  17. Construction camera frame at 3:15 PM PT. The layout of equipment and materials across the site remains consistent between these two views.
    3:15 PM PT

    The layout of equipment and materials across the site remains consistent between these two views.

  18. Construction camera frame at 3:00 PM PT. The machines and materials on the site are in the same positions as they were fifteen minutes ago.
    3:00 PM PT

    The machines and materials on the site are in the same positions as they were fifteen minutes ago.

  19. 2 similar no-change frames2:30 PM–2:45 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 2:45 PM PT. The scene remains largely unchanged, with equipment holding its positions across the site.
      2:45 PM PT

      The scene remains largely unchanged, with equipment holding its positions across the site.

    2. Construction camera frame at 2:30 PM PT. The site maintains its current appearance, with no noticeable movement of equipment or materials in the last fifteen minutes.
      2:30 PM PT

      The site maintains its current appearance, with no noticeable movement of equipment or materials in the last fifteen minutes.

  20. Construction camera frame at 2:15 PM PT. The arrangement of machines on site looks to be holding, with no obvious repositioning of equipment or materials visible in this view.
    2:15 PM PT

    The arrangement of machines on site looks to be holding, with no obvious repositioning of equipment or materials visible in this view.

  21. Construction camera frame at 2:00 PM PT. Equipment positions across the site appear stable, showing no significant shifts in arrangement during this interval.
    2:00 PM PT

    Equipment positions across the site appear stable, showing no significant shifts in arrangement during this interval.

  22. Construction camera frame at 1:45 PM PT. The site appears quiet, with the positions of the heavy equipment and material stockpiles holding steady over the last quarter hour.
    1:45 PM PT

    The site appears quiet, with the positions of the heavy equipment and material stockpiles holding steady over the last quarter hour.

  23. 3 similar no-change frames1:00 PM–1:30 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 1:30 PM PT. The layout of the site remains consistent, with no discernible changes to the locations of machinery or stockpiled materials.
      1:30 PM PT

      The layout of the site remains consistent, with no discernible changes to the locations of machinery or stockpiled materials.

    2. Construction camera frame at 1:15 PM PT. The scene presents a stable view, with no apparent movement of equipment or materials across the site.
      1:15 PM PT

      The scene presents a stable view, with no apparent movement of equipment or materials across the site.

    3. Construction camera frame at 1:00 PM PT. The scene is largely unchanged, with the arrangement of equipment and materials appearing consistent between views.
      1:00 PM PT

      The scene is largely unchanged, with the arrangement of equipment and materials appearing consistent between views.

  24. Construction camera frame at 12:45 PM PT. A yellow machine has moved from the upper-right to the lower-right portion of the site. The rest of the scene remains consistent, with the tracked equipment and stockpiled materials holding their positions.
    12:45 PM PT

    A yellow machine has moved from the upper-right to the lower-right portion of the site. The rest of the scene remains consistent, with the tracked equipment and stockpiled materials holding their positions.

  25. Construction camera frame at 12:30 PM PT. The position of one of the excavators near the center of the frame has shifted slightly since the last view. Otherwise, equipment and materials on site maintain a consistent arrangement.
    12:30 PM PT

    The position of one of the excavators near the center of the frame has shifted slightly since the last view. Otherwise, equipment and materials on site maintain a consistent arrangement.

  26. Construction camera frame at 12:15 PM PT. The scene remains remarkably still, with the arrangement of the machinery and materials holding steady since the last check.
    12:15 PM PT

    The scene remains remarkably still, with the arrangement of the machinery and materials holding steady since the last check.

  27. 2 similar no-change frames11:45 AM–12:00 PM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 12:00 PM PT. The site appears quiet, with no noticeable shifts in equipment or material placement since the last view.
      12:00 PM PT

      The site appears quiet, with no noticeable shifts in equipment or material placement since the last view.

    2. Construction camera frame at 11:45 AM PT. A white van has moved from the upper-right to the lower-right corner of the site. Otherwise, the scene appears static, with the heavy equipment and material stockpiles remaining in the same positions.
      11:45 AM PT

      A white van has moved from the upper-right to the lower-right corner of the site. Otherwise, the scene appears static, with the heavy equipment and material stockpiles remaining in the same positions.

  28. Construction camera frame at 11:30 AM PT. The scene presents a consistent appearance, with the positioning of the equipment and materials remaining largely as it was.
    11:30 AM PT

    The scene presents a consistent appearance, with the positioning of the equipment and materials remaining largely as it was.

  29. Construction camera frame at 11:15 AM PT. The arrangement of equipment across the site appears largely unchanged from the previous view.
    11:15 AM PT

    The arrangement of equipment across the site appears largely unchanged from the previous view.

  30. Construction camera frame at 11:00 AM PT. Two light-colored vehicles have become visible in the upper-right quadrant of the site, where previously there was open space. The rest of the scene appears consistent with the prior view.
    11:00 AM PT

    Two light-colored vehicles have become visible in the upper-right quadrant of the site, where previously there was open space. The rest of the scene appears consistent with the prior view.

  31. Construction camera frame at 10:45 AM PT. The scene is stable, with the machinery and materials maintaining their positions from the prior view.
    10:45 AM PT

    The scene is stable, with the machinery and materials maintaining their positions from the prior view.

  32. Construction camera frame at 10:30 AM PT. A red and white truck has entered the site from the driveway on the right side of the frame. Beyond that, the scene remains much as it was fifteen minutes ago, with the large machines holding their positions.
    10:30 AM PT

    A red and white truck has entered the site from the driveway on the right side of the frame. Beyond that, the scene remains much as it was fifteen minutes ago, with the large machines holding their positions.

  33. Construction camera frame at 10:15 AM PT. Two small white vehicles have shifted position within the central area of the site.
    10:15 AM PT

    Two small white vehicles have shifted position within the central area of the site.

  34. Construction camera frame at 10:00 AM PT. A red container has appeared on the left side of the site, near the street. Otherwise, the scene shows a similar layout of equipment and materials as before.
    10:00 AM PT

    A red container has appeared on the left side of the site, near the street. Otherwise, the scene shows a similar layout of equipment and materials as before.

  35. Construction camera frame at 9:45 AM PT. A small yellow vehicle has moved slightly further into the site from the right edge, near the center.
    9:45 AM PT

    A small yellow vehicle has moved slightly further into the site from the right edge, near the center.

  36. Construction camera frame at 9:30 AM PT. The arrangement of equipment across the site appears largely unchanged in the intervening fifteen minutes.
    9:30 AM PT

    The arrangement of equipment across the site appears largely unchanged in the intervening fifteen minutes.

  37. Construction camera frame at 9:15 AM PT. The site appears quiet, with no appreciable changes to the equipment or materials visible in the last quarter hour.
    9:15 AM PT

    The site appears quiet, with no appreciable changes to the equipment or materials visible in the last quarter hour.

  38. 2 similar no-change frames8:45 AM–9:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 9:00 AM PT. The scene presents a static view, with the positions of the machinery and materials appearing unchanged from the previous frame.
      9:00 AM PT

      The scene presents a static view, with the positions of the machinery and materials appearing unchanged from the previous frame.

    2. Construction camera frame at 8:45 AM PT. The site maintains a consistent appearance, with no discernible changes in equipment locations or ongoing work.
      8:45 AM PT

      The site maintains a consistent appearance, with no discernible changes in equipment locations or ongoing work.

  39. Construction camera frame at 8:30 AM PT. The scene remains remarkably stable, with no notable shifts in equipment placement or activity visible across the site.
    8:30 AM PT

    The scene remains remarkably stable, with no notable shifts in equipment placement or activity visible across the site.

  40. Construction camera frame at 8:15 AM PT. The equipment on site is holding its positions, with no obvious movement detected in the last fifteen minutes.
    8:15 AM PT

    The equipment on site is holding its positions, with no obvious movement detected in the last fifteen minutes.

  41. Construction camera frame at 8:00 AM PT. A white van has entered the site via the service road on the right side of the frame. Otherwise, the equipment arrangement remains consistent.
    8:00 AM PT

    A white van has entered the site via the service road on the right side of the frame. Otherwise, the equipment arrangement remains consistent.

  42. Construction camera frame at 7:45 AM PT. The overall scene is holding its pattern, with the position of the equipment remaining largely unchanged.
    7:45 AM PT

    The overall scene is holding its pattern, with the position of the equipment remaining largely unchanged.

  43. Construction camera frame at 7:30 AM PT. The site appears quiet, with the arrangement of the heavy machinery remaining largely as it was.
    7:30 AM PT

    The site appears quiet, with the arrangement of the heavy machinery remaining largely as it was.

  44. Construction camera frame at 7:15 AM PT. A small yellow machine has moved from the center to the right side of the graded area. Otherwise, the equipment and site layout appear to be holding steady.
    7:15 AM PT

    A small yellow machine has moved from the center to the right side of the graded area. Otherwise, the equipment and site layout appear to be holding steady.

  45. Construction camera frame at 7:00 AM PT. The broad site shows no discernible changes in the placement of equipment or vehicles during this interval.
    7:00 AM PT

    The broad site shows no discernible changes in the placement of equipment or vehicles during this interval.

  46. Construction camera frame at 6:45 AM PT. The site maintains a similar appearance, with no visible repositioning of the heavy equipment or vehicles.
    6:45 AM PT

    The site maintains a similar appearance, with no visible repositioning of the heavy equipment or vehicles.

  47. Construction camera frame at 6:30 AM PT. The site presents a steady view, with the arrangement of machinery appearing to be consistent between these frames.
    6:30 AM PT

    The site presents a steady view, with the arrangement of machinery appearing to be consistent between these frames.

  48. Construction camera frame at 6:15 AM PT. The scene remains remarkably consistent, with no apparent shifts in equipment positioning or activity.
    6:15 AM PT

    The scene remains remarkably consistent, with no apparent shifts in equipment positioning or activity.

  49. Construction camera frame at 6:00 AM PT. Daylight has fully arrived, revealing several machines positioned across the site. The area appears largely unchanged since the last check, with equipment remaining in the same spots.
    6:00 AM PT

    Daylight has fully arrived, revealing several machines positioned across the site. The area appears largely unchanged since the last check, with equipment remaining in the same spots.

  50. 6 similar no-change frames12:00 AM–5:00 AM PT

    No visible change was reported between sampled frames; continuous inactivity cannot be inferred.

    1. Construction camera frame at 5:00 AM PT. No construction activity — the site is quiet.
      5:00 AM PT

      No construction activity — the site is quiet.

    2. Construction camera frame at 4:00 AM PT. No construction activity — the site is quiet.
      4:00 AM PT

      No construction activity — the site is quiet.

    3. Construction camera frame at 3:00 AM PT. No construction activity — the site is quiet.
      3:00 AM PT

      No construction activity — the site is quiet.

    4. Construction camera frame at 2:00 AM PT. No construction activity — the site is quiet.
      2:00 AM PT

      No construction activity — the site is quiet.

    5. Construction camera frame at 1:00 AM PT. No construction activity — the site is quiet.
      1:00 AM PT

      No construction activity — the site is quiet.

    6. Construction camera frame at 12:00 AM PT. No construction activity — the site is quiet.
      12:00 AM PT

      No construction activity — the site is quiet.

← Aug 18All daysAug 20 →